Requalification Retake Exam Rept 50-361/OL-90-01 for Both Units on 900206.Exam Results:Reactor Operator Passed Exam
ML20012D072
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 03/02/1990
From: Royack M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20012D070 List:
References
50-361-OL-90-01, 50-361-OL-90-1, NUDOCS 9003260421
Download: ML20012D072 (3)


Text

.

Examination Report No.:

50-361/0L-90-01 Facility:

San Onofre Nuclear Generating Station Units 2 and 3 Facility Docket Nos.:

50-361 and 50-362 Facility License Nos.:

NPF-10 and NPF-15 Examination administered at San Onofre Nuclear Generating Station Units 2 and

3. San Clemente, California Licensed Operator Requalification Program Evaluation Examination Retake.

ad/90 Chief Examiner p &

Date m.

Mic el J. Roy Approved by:

)

3[2 [9h w

@wisF. Miller,Jr., Chi 6f Date Operations Section Summary: An NRC administered licensed operator requalification written retake examination was administered to one reactor operator at the San Onofre Nuclear Generating Station, Units 2 and 3, on February 6,1990.

(Report No. 50-361/0L-90-01).

Results: Based on the grading of the reactor operator's written retake examination, the reactor operator passed the examination.

The reactor operator's file will be updated to reflect the satisfactory passing grade for the examination.

9003260421 900302 O

PDR ADOCK 05000361

[4 V

FDC

y b

REPORT DETAILS 1.

Personnel NRC Personnel:

j I

  • M. Royack, Chief Examiner Southern California Edison Personnel:
  • R. Mette, Training Supervisor
  • D. Daily. Training Instructor O. Morron. Training Instructor K. Meagher, Operations
  • D. Miller, Compliance Engineer
  • M. Hyman, Training Administrator
  • Indicates personnel attending exit meeting.

t 2.

Examination 1

The examination was conducted to reexamine a' Reactor Operator in' the written portion of the licensed operator requalification program evaluation. The Reactor Operator had been previously evaluated as unsatisfactory, by both the licensee and the NRC, in-the written portion of the NRC evaluation of the San Onofre Nuclear Generating Station Units 2 and 3 licensed operator requalific6 tion program. The results of the previous examination are documented in Examination Report l

50-361/0i.-89-02.

The licensed operator requalification written examination was administered and developed in accordance with Examiner Standard ES-601, Revision 5, Administration of NRC requalification Program Evaluations.

+

3.

Examination Development The written examination questions and reference material were. reviewed by the Chief Examiner in accordance with ES-601. The Chief Examiner commented on the examination questions provided for examination development. The coments were resolved-with the licensee representatives and the examination was finalized. The licensee representatives, who participated in the examination review and preparation, signed examination security agreements as required by ES-601.

L During the review of the written examination bank questions, provided by the licensee for this examination, the Chief Examiner noted that the majority of the questions in the question banks were not objective, and did not always use the guidance of ES-601, Attachment 14, " Guidelines for the Development and Review of Open Reference-Examinations." The licensee representatives stated that the examination question banks would be reviewed and questions would be revised and developed to. meet more l

objective grading criteria and standards.

I w

During the review of thE facility reference material, the NRC examiner noted a discrepancy in plant procedure 01 S023-6-15. " Operation of 125 VDC systems," page 4 of 32, Precautions and Limitations, paragraphs 4.5.

and 4.7.

The discrepancy was in the conversion of degrees Fahrenheit to degrees Celsius. The temperatures in question related to the maximum allowable operating conditions for' the'125 VDC equipment as defined in its environnental-qualifications. The licensee agreed to look-into making a revision to the precautions and limitations for this equipment.

4.

Exit Meeting l

l On February 6, 1990, the NRC Chief Examiner met with the licensee staff

]

to discuss the examination and findings.

The licensee agreed with the

}

observations, and to~take action as previously noted in this report.