Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-MT-15-044, Readiness for NRC Supplemental Inspection for a Security Greater-Than-Green Finding + (Readiness for NRC Supplemental Inspection for a Security Greater-Than-Green Finding)
- L-22-127, Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding + (Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding)
- ML22126A076 + (Readiness for NRC Supplemental Inspection Required for a Greater than Green Finding)
- L-17-066, Readiness for NRC Supplemental Inspection Required for a White Performance Indicator + (Readiness for NRC Supplemental Inspection Required for a White Performance Indicator)
- L-22-153, Readiness for NRC Supplemental Inspection Required for a White Finding + (Readiness for NRC Supplemental Inspection Required for a White Finding)
- L-MT-16-077, Readiness for NRC Supplemental Inspection for White Finding + (Readiness for NRC Supplemental Inspection for White Finding)
- L-17-325, Readiness for Nrg Supplemental Inspection Required for a Greater than Green Finding + (Readiness for Nrg Supplemental Inspection Required for a Greater than Green Finding)
- L-18-189, Readiness for Nrg Supplemental Inspection Required for a White Finding + (Readiness for Nrg Supplemental Inspection Required for a White Finding)
- ML20006G103 + (Readiness for Operation.* Urges Commission to Require Applicant to Identify & Replace Potentially Defective Rosemount Transmitters Before Commencement of Full Power Operation,Per Recent NRC Insp)
- ML20006G104 + (Readiness for Operation.* Urges Commission to Require Applicant to Identify & Replace Potentially Defective Rosemount Transmitters Before Commencement of Full Power Operation,Per Recent NRC Insp)
- ML18102B349 + (Readiness for Restart,Overview of Key Initiatives)
- L-23-131, Readiness for Resumption of NRC Supplemental Inspection + (Readiness for Resumption of NRC Supplemental Inspection)
- L-PI-12-005, Readiness for Supplemental 95001 Inspection + (Readiness for Supplemental 95001 Inspection)
- DCL-17-041, Readiness for Supplemental Inspection + (Readiness for Supplemental Inspection)
- NL-25-0041, Readiness for Supplemental Inspection + (Readiness for Supplemental Inspection)
- NL-23-0628, Readiness for Supplemental Inspection EA-22-101 + (Readiness for Supplemental Inspection EA-22-101)
- ML23054A278 + (Readiness for Supplemental Inspection; EA-22-093)
- U-604254, Readiness for a Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period + (Readiness for a Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period)
- BW140062, Readiness for a Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period + (Readiness for a Follow Up Inspection for Three or More Severity Level IV Traditional Enforcement Violations in the Same Area in a 12-Month Period)
- ML15288A305 + (Readiness of Watts Bar Unit 2 to Receive an Operating License)
- ML20236C280 + (Readiness to Begin Ascent to Full Power:Self Assessment Rept)
- ST-HL-AE-3110, Readiness to Begin Ascent to Full Power:Self Assessment Rept + (Readiness to Begin Ascent to Full Power:Self Assessment Rept)
- ML20196F183 + (Readiness to Begin Ascent to Full Power:Self-Assessment Rept)
- 05000313/FIN-2016008-06 + (Readiness to Cope with External Flooding)
- ML053250326 + (Readiness to Resume NRC Audits Associated with the Plant License Renewal Application)
- ML19221A565 + (Reading File Index for TMI-2 Incident)
- ML19224B356 + (Readings Taken on 790331 to Compare Computer Readings to Local Readings from Computer Cabinet)
- ML19224B437 + (Readings of 790328 Core Map Plotted on 790507 Core Map)
- ML19224B347 + (Readings on Incore Thermocouples)
- ML19224B357 + (Readings on Thermocouple Computer Data)
- ML25044A193 + (Readme)
- ML051730106 + (Reaffirmation of Commitments and Agreements Made During Mediation at the Davis-Besse Nuclear Power Station, Unit 1 (EA-04-224))
- ML19338C276 + (Reaffirmation of Intention to Litigate Contentions 1 & 2. Certificate of Svc & Supporting Documentation Encl)
- ML19241A714 + (Reaffirms 790119 Request to Suspend Facility CP for Inadequate QC of Containment Bldg Basemat.New Info Re Seismic Disturbances Should Also Be Considered)
- ML19220A819 + (Reaffirms 790329 Comments.Requires NRC Assurance of Continuing Accurate & Straightforward Repts on TMI Situation)
- ML19276G608 + (Reaffirms 790611 Comments.Application Is Summary of Util Findings & Conclusions.Nrc & Intervenors Must Develop Record on Which Siting Board Will Make Final Decision)
- ML20215M962 + (Reaffirms 851113 Comments in Response to Util Re Proposed Use of Energy Absorbers During Refueling Outage Under 10CFR50.59(a).Util Must Demonstrate Applicability & Validity of Computer Programs Used for Absorber Placement)
- ML20212K738 + (Reaffirms 861212 & 870225 Positions That Period Allowed for Discovery in 861204 Memorandum & Order Too Truncated to Allow Intervenors Adequate & Fair Opportunity to Conduct Dicovery on Many Complex Issues in Proceeding)
- ML20057B621 + (Reaffirms 930929 Enforcement Conference in Rockville,Md Re Copes-Vulcan Valve Weight & Center of Gravity Issue Noted in Insp Rept 99900404/89-01)
- ML20140A437 + (Reaffirms BWR Utility Commitments to Goals,Objectives & Products of BWR Vessel & Internal Project)
- ML20138C600 + (Reaffirms BWR Utility Commitments to Goals,Objectives & Products of BWR Vessel & Internals Project (Bwrvip). W/List of Active Members)
- ML19345B583 + (Reaffirms Belief in Use of Shift Supervisor as Fire Brigade Leader.As Alternative,Proposes Use of Supervisors Until Jul 1982.Clarifies SER Commitment to Control,Not Prohibit Smoking in safety-related & Major Fire Hazard Areas)
- A05377, Reaffirms Certification of Changes to Final Draft Tech Specs,Including Additions to Meteorological Monitoring Instrumentation Tables 3.3-8 & 4.3-5 & Snubber Surveillance Functional Test Requirement + (Reaffirms Certification of Changes to Final Draft Tech Specs,Including Additions to Meteorological Monitoring Instrumentation Tables 3.3-8 & 4.3-5 & Snubber Surveillance Functional Test Requirement)
- ML20155B491 + (Reaffirms Commission Position as Stated in from V Stello to G Peterson That Commission Has No Basis to Recommend That Planned FEMA Evaluated Exercise for Util Offsite Emergency Plan Should Not Proceed as Scheduled)
- SNRC-1674, Reaffirms Commitment Not to Place Nuclear Fuel Back Into Facility Reactor W/O Prior NRC Approval & Advises of Preliminary Steps Taken to Lower Ongoing Costs + (Reaffirms Commitment Not to Place Nuclear Fuel Back Into Facility Reactor W/O Prior NRC Approval & Advises of Preliminary Steps Taken to Lower Ongoing Costs)
- ML20010F619 + (Reaffirms Commitment to Address List of 810611 Significant Findings Identified During Site Emergency Preparedness Appraisal.Followup Audit Requested as Soon as Possible After 810901)
- ML20104A383 + (Reaffirms Commitment to Include All Map Info Required by NUREG-0654 in Annex 1,Rev 1 to Emergency Response Plan,Per Terms of Rejection of Eddleman Contentions 250 & 251.Svc List Encl)
- JPN-92-022, Reaffirms Commitment to Perform Reliability Testing of Manual Bus Transfers Between Onsite & Offsite Power Supplies & Resolve 4.16 Kv Switchgear Deficiency,Per NRC Recommendations in Safety Evaluation + (Reaffirms Commitment to Perform Reliability Testing of Manual Bus Transfers Between Onsite & Offsite Power Supplies & Resolve 4.16 Kv Switchgear Deficiency,Per NRC Recommendations in Safety Evaluation)
- ML20065B182 + (Reaffirms Commitment to Protect Cultural Resources on Util Property Surrounding Plant,Per 920416 Transmittal of Cultural Resources Mgt Plan for Residual Land at UE Callaway Plant, Dtd Mar 1992)
- ML20059E961 + (Reaffirms Commitment to Safe & Responsible Operation of Facility in Face of Tender Offer for Util Stock.Accepts W/O Qualification,Responsibility for Continued Safe & Reliable Operation of Plant)
- L-85-418, Reaffirms Commitment to Submit Appropriate Tech Specs Re Availability & Performance Monitoring of Standby Steam Generator Feedwater Pumps & Provides General Info Concerning Status of Sys.Two Pumps Installed + (Reaffirms Commitment to Submit Appropriate Tech Specs Re Availability & Performance Monitoring of Standby Steam Generator Feedwater Pumps & Provides General Info Concerning Status of Sys.Two Pumps Installed)