Reaffirms 851113 Comments in Response to Util Re Proposed Use of Energy Absorbers During Refueling Outage Under 10CFR50.59(a).Util Must Demonstrate Applicability & Validity of Computer Programs Used for Absorber Placement
ML20215M962
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/29/1986
From: Muller D
Office of Nuclear Reactor Regulation
To: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8611040057
Download: ML20215M962 (2)


Text

. .

OCT 291986 Distribution Dockets Nos. 50-277/278 DMu11er ACRS(10)

EJordan LHulman Mr. John S. Kemper IDocketIfile SNorris Vice President, Engineering and Research GGears BGrimes Philadelphia Electric Company ^ JPartlow 2301 Market Street NRC 4 L PDRs Philadelphia, Pennsylvania 19101 OGC-Bethesda NThompson

Dear Mr. Kemper:

Branch files

SUBJECT:

USE OF ENERGY ABSORBERS AT PEACH BOTTOM DURING UPCOMINGREFUELINGOUTAGE(FEBRUARY 1987)

Re: Peach Bottom Atomic Power Station, Units 2 and 3 By letter dated August 13, 1986, you responded to our letter dated November 13, 1985. You conclude in your letter that " existing Regulatory Guides 1.61 and 1.92 permit the use of energy absorbers under the provisions of 10 CFR 50.59(a)."

Our letter of November 13, 1985 provided comments on the use of energy absorbers which directed your attention to the difficulties of. installing energy absorbers at Peach Bottom under the provisions of 10 CFR 50.59(a). We must again point out the need to demonstrate the applicability and validity of all computer programs used to determine ~ the number and location of the energy absorbers in a given piping system (refer to Standard Review Plan, Section 3.9.1, Office of Nuclear Reactor Regulation, NUREG-0800, July,1981). We also believe there are technical issues remaining to be addressed.-

Should you elect to proceed with the installation of energy absorbers under 50.59(a), the Region, with NRR assistance will rigorously review any and all Peach Bottom Safety Evaluations supporting the replacement of snubbers with energy absorbers. to assure that all computer programs meet ~ the' verification requirements as outlined in the Standard Review Plan, and that'an adequate technical basis for use of the energy absorbers has been established and documented.

If you wish to request our review and approval please_ inform the Peach Bottom Project Manager (R. Clark at 301-492-8298) promptly so that we can attempt to meet your proposed installation schedule.

. Sincerely, Original signed hv V.- Rooney for 86110 hj0N77 Daniel R. Muller, Director PDR PDR BWR Project Directorate #2 P

Division of BWR Licensing cc: See next page 0FFICIAL RECORD COPY

  • Previously Concurred 0FC : DBL:PD#2 : DBL:PD#2 :BWEB :50EI :0GC  : DBL:PD#2 :
Scinto w/

'NAME :SNorris* :GGears* :BDLiaw* :RBosnak* :Lieberman* :DMul {ler DATE :9/25/86 :9/25/86 :10/20/86 :10/20/86 :10/3/86 :10/f.3/86

Mr. E. G. Bauer, Jr. Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 cc:

Mr. Eugene J. Bradley Mr. R. A. Heiss, Coordinator Assistant General Counsel Pennsylvania State Clearinghouse Philadelphia Electric Company . Governor's Office of State Planning 2301 Market Street and Development Philadelphia, Pennsylvania 19101 Post Office Box 1323 Harrisburg, Pennsylvania 17120 Troy B. Conner, Jr., Esquirc 1747 Pennsylvania Avenue, N.W. Mr. Thomas M. Gerusky, Director Washington, D.C. 20006 Bureau of Radiation Protection Pennsylvania Department of Thomas A. Deming, Esquire Environmental Resources Assistant. Attorney General Post Office Box 2063 Department of Natural Resources Harrisburg, Pennsylvania 17120 Annapolis, Maryland 21401 Mr. Albert R. Steel, Chairman Mr. R. Fleishmann, II, Manager Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township R. D. #1 R. D. #1 Delta, Pennsylvania 17314 Delta, Pennsylvania- 17314 Mr. G. M. Leitch, Superintendent Nuclear Generation Division 67-1 Philadelphia. Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Mr. Anthony J.. Pietrofitta, General Manager Power Production Engineering Atlantic Electric Post Office Box 1500 1199 Black Horse Pike Pleasantville, New Jersey 08232 Resident Inspector U.S. Nuclear Regulatory Comission Peach Bottom Atomic Power Station Post Office Box 399 Delta, Pennsylvania 17314 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406

.