Text

energy Davis-Besse Nuclear Power Station harbor 5501 N. State Route 2 Oak Harbor, Ohio 43449 Terry J. Brown 419-321-7676 Site Vice President, Davis-Besse Nuclear May 6, 2022 L-22-127 Mr. John Giessner Regional Administrator, Region 111 United States Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352

Subject:

Davis-Besse Nuclear Power Station, Unit 1 Docket Number 50-346, License Number NPF-3 Readiness for NRC Supplemental Inspection Required for a Greater Than Green Finding In Letter EA-21-105 dated January 31, 2022 (reference NRC Inspection Report No.

05000346/2021405), the NRC finalized the significance of a Greater than Green finding for the Davis-Besse Nuclear Power Station (DBNPS). As a result, the NRC assessed the DBNPS to be in the Regulatory Response Column of the NRC's Action Matrix and identified that a supplemental NRC inspection will be performed. As requested by this Assessment Follow-Up Letter, this letter is to inform the NRC staff that the Energy Harbor Nuclear Corporation (Energy Harbor) is ready for the supplemental inspection at the DBNPS in accordance with NRC Inspection Procedure 95001.

There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Robert W. Oesterle, Manager, Site Regulatory Compliance and Emergency Response, at (419) 321-7462.

Sincerely,

~

Terry J. Brown GMW cc: NRC Document Control Desk NRC Senior Resident Inspector NRR Project Manager Utility Radiological Safety Board