Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Proposed Tech Specs Re Response Time Testing Requirements". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20073B538  + (Proposed Tech Specs Re Reporting Requirements for Radioactive Effluent Release Rept)
  • ML20212C028  + (Proposed Tech Specs Re Reporting Requirements for Primary Coolant Sys Iodine Spikes)
  • ML18095A214  + (Proposed Tech Specs Re Reporting Requirements for Reactor Trip Sys Response Time & Limiting Condition for Operation & Surveillance Requirements for RCS)
  • ML20024G674  + (Proposed Tech Specs Re Reporting Requirements)
  • ML20203B283  + (Proposed Tech Specs Re Reporting of Primary Coolant Iodine Spikes & Elimination of 800 H Per 12-month Period Cap for Exceeding Activity Limits)
  • ML20107M057  + (Proposed Tech Specs Re Request for Enforcement Discretion)
  • ML20084L454  + (Proposed Tech Specs Re Request for Exemption from App J, Primary Reactor Containment Leakage Testing for Water- Cooled Power Reactors)
  • ML20087J197  + (Proposed Tech Specs Re Required Operable Channels of Core Exit Thermocouples)
  • ML20078G822  + (Proposed Tech Specs Re Required Vol of Trisodium Phosphate Dodecahydrate in Containment)
  • ML20072C125  + (Proposed Tech Specs Re Requirement for Accelerated Testing of Div 1 DG)
  • ML20063K757  + (Proposed Tech Specs Re Requirement to Perform Infrared Aerial Photography Every Other Yr)
  • ML20154A428  + (Proposed Tech Specs Re Requirements Associated with Control Room & Fuel Handling Bldg Ventilation Sys)
  • ML18094B168  + (Proposed Tech Specs Re Requirements That Operations Manager Hold Senior Reactor Operator License)
  • ML18005A761  + (Proposed Tech Specs Re Requirements for Manager of Operations to Hold Senior Reactor Operator License)
  • ML20217B824  + (Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel)
  • ML18064A761  + (Proposed Tech Specs Re Requirements for Periodic DG Peak Load Tests)
  • ML20011E199  + (Proposed Tech Specs Re Requirements for Surveillance Intervals)
  • ML18037A488  + (Proposed Tech Specs Re Requirements for Lab Sample Analysis of Charcoal Adsorbers to Reflect Latest ASTM Std)
  • ML20134K377  + (Proposed Tech Specs Re Requirements for Avoidance & Protection from Thermal Hydraulic Instabilities to Be Consistent w/NEDO-31960 & NEDO-31960,Suppl 1, BWR Owners Group Long-Term Stability Solutions..)
  • ML20150C428  + (Proposed Tech Specs Re Requirements for Radioactive Gaseous Effluent Monitoring Instrumentation)
  • ML20207F355  + (Proposed Tech Specs Re Requirements for Analysis & Monitoring of Gaseous Radioactive Effluents)
  • ML20063J844  + (Proposed Tech Specs Re Requirements in 10CFR20)
  • ML20134M083  + (Proposed Tech Specs Re Requirements of SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation)
  • ML20134D304  + (Proposed Tech Specs Re Requirements to Allow Increased SG Tube Plugging)
  • ML20154C068  + (Proposed Tech Specs Re Resource Range Monitor Min Count Rate Requirements)
  • ML17292A753  + (Proposed Tech Specs Re Response Time Testing Requirements)
  • ML20065L260  + (Proposed Tech Specs Re Response Time for RTS & ESFAS Instrumentation)
  • ML20108A972  + (Proposed Tech Specs Re Response to NRC Questions for Containment Airlock)
  • ML20198G595  + (Proposed Tech Specs Re Response to NRC Reactor Sys Branch RAI Re AP600 TS)
  • ML20198J655  + (Proposed Tech Specs Re Response to RAI on Proposed Conversion to Ists,Section 3.8, Electrical Power Sys)
  • ML20151T015  + (Proposed Tech Specs Re Response to Request for Addl Info on Conversion to Improved Tech Specs)
  • ML20245D774  + (Proposed Tech Specs Re Retraining & Replacement Training Program)
  • ML20046C104  + (Proposed Tech Specs Re Rets,Per Generic Ltr 89-01)
  • ML20199E086  + (Proposed Tech Specs Re Rev 1 for TS Change Request NPF-38-174)
  • ML20196K662  + (Proposed Tech Specs Re Rev 4 to Fermi 2 ITS Submittal)
  • ML17059C791  + (Proposed Tech Specs Re Rev B to Conversion of Unit 2 Current TS to ITS)
  • ML20236Q064  + (Proposed Tech Specs Re Rev B to Conversion to Improved STS)
  • ML20072E402  + (Proposed Tech Specs Re Rev Insertion Instructions Rev C)
  • ML20046B576  + (Proposed Tech Specs Re Rev for TS Change (RTS-258) Re Incorporation of New 10CFR20 Requirements)
  • ML20247R702  + (Proposed Tech Specs Re Rev of Refueling Water Storage Tank low-low Level Setpoint)
  • ML20154L955  + (Proposed Tech Specs Re Rev of Statement on Normal Shift Length & Other Misc Changes)
  • ML20095C103  + (Proposed Tech Specs Re Rev of Submittal Date for Annual Exposure Data Rept Bringing Plant Into Conformance w/10CFR20.2206 & Relaxing Overly Restrictive Administrative Requirement)
  • ML20100P052  + (Proposed Tech Specs Re Rev to 10CFR50,App J Which Provided for Reduced Test Frequency for Qualified Containment)
  • ML20066B755  + (Proposed Tech Specs Re Rev to Definitions & Bases Sections of Tech Specs)
  • ML20202F462  + (Proposed Tech Specs Re Rev to Facilitate Decommissioning)
  • ML20195J824  + (Proposed Tech Specs Re Rev to Increase Spent Fuel Pool Storage Capacity)
  • ML20080K707  + (Proposed Tech Specs Re Rev to License Condition on Fire Protection)
  • ML18011A708  + (Proposed Tech Specs Re Rev to Plant TS to Relocate Certain TS Requirements in Accordance w/NUREG-1431, Std TS, Westinghouse Plants)
  • ML20078L642  + (Proposed Tech Specs Re Rev to Proposed Changes to Facility TS)
  • ML20154B561  + (Proposed Tech Specs Re Rev to Stroke Time Operability Requirements for MSIVs)
  • ML20087F855  + (Proposed Tech Specs Re Rev to TS Change 95-02 Concerning PORVs & Block Valves)