REACTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION I

ACTION: (Continued) d.

With three PORVs inoperable and not capable of being manually cycled, 1) within i hour:

a) restore at least one PORV to OPERABLE status or to a condition where it is capable of being manually cycled *M Ad b) close and remove power from the block valves for any PORVs ramaining inoperable and not capable of being manually cycled and 2) within the next72 houn:

a) restore a minimum of two PORVs to OPERABLE status or b) restore a mmimum of two PORVs to a condition where they can be manually cycled *;

otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the followmg 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, e.

Withone block valveinoperable:

1) within 1 hour:

a) restore the block valve to OPERABLE status, or b) place the associated PORV in manual control and 2) within the next 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s:

a) restore the block valve to OPERABLE status or b) close the block valve and remove power from the block valve; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

f.

With two block valves inoperable:

1) within 1 hour:

a) restore the block valves to OPERABLE status, or b) place the associated PORVs in manual control and 2) within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s:

a) restore at least two of the three block valves to OPERABLE status and b) ensure that the remaining inoperable block valve is closed and the poweris removed; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

If a PORV is inoperable but capable of being manually cycled, the associated block valve must be closed with power maintained to the block valve.

SUMMER - UNIT 1 3/4 4-10a Amendment No.

e 9508160049 950911 PDR ADOCK 05000395 p

PDR

~

REAdTOR COOLANT SYSTEM LIMITING CONDITION FOR OPERATION ACTION: (Continued) d.

With three PORVs inoperable and not capable of being manually cycled, 1) within 1 hour:

a) restore at least one PORV to OPERABLE status or to a condition where it is capable of being manually cycled *, and b) close and remove power from the block valves for any PORVs remaining inoperable and not capable of being manually cycled and 2) within the next 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s:

a) restore a minimum of two PORVs to OPERABLE status or b) restore a minimum of two PORVs to a condition where they can be manually cycled *;

otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

e.

With one block valve inoperable:

1) within 1 hour:

a) restore the block valve to OPERABLE status, or b) place the associated PORV in manual control and 2) within the next 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s:

a) restore the block valve to OPERABLE status or b) close the block valve and remove power from the block valve; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

f.

With two block valves inoperable:

1) within 1 hour:

a) restore the block valves to OPERABLE status, or b) place the associated PORVs in manual control and 2) within 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s:

a) restore at least two of the three block valves to OPERABLE status and b) ensure that the remaining inoperable block valve is closed and the poweris removed; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

I

~

If a PORV is inoperable but capable of being manually cycled, the associated block valve must be closed with power maintained to the block valve.