Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19320C226 + (Operational QA Manual,App A,Re Critical Structures,Sys & Components List)
- ML19320C229 + (Operational QA Manual,Part 3,Section2,re Matl & Spare Parts)
- ML19257C586 + (Operational QA Plan)
- ML20069J251 + (Operational QA Plan for Facilities)
- ML19276H212 + (Operational QA Plan for Facility)
- ML20069F970 + (Operational QA Plan for Gpu Nuclear,Revision 0)
- ML19290A077 + (Operational QA Plan for TMI, Revision 7)
- ML20066K829 + (Operational QA Plan for TMI-1 & Oyster Creek)
- ML20091A238 + (Operational QA Plan, Rev 1)
- ML19309E496 + (Operational QA Plan,Revision 3)
- ML20003F865 + (Operational QA Plan,Revision 5)
- ML19305C708 + (Operational QA Plan,Revision 8)
- ML20010E178 + (Operational QA Plan,Revision 9)
- ML19338D634 + (Operational QA Program)
- ML19322C740 + (Operational QA Program for TMI 1& 2.Includes Revision 1 Through Revision 7)
- ML19354C484 + (Operational QA Program,Rev 2)
- ML19208A782 + (Operational QA Program,Revision 7)
- ML19323G345 + (Operational QA Program,Revision 8)
- ML20008F405 + (Operational QA Program,Revision 9,re Duties & Responsibilities of Personnel Involved in Establishing & Executing Operational QA Program)
- ML030380536 + (Operational Quality Assurance Plan)
- ML20134E658 + (Operational Quality Assurance Plan Interpretation 96-001)
- ML17355A658 + (Operational Quality Assurance Program Description (EN-QA-004), Rev. 52)
- ML042300620 + (Operational Quality Assurance Program Inspection Program Changes and Clarifications, Withdrawal of Change Request)
- ML20072M740 + (Operational Radiological Environ Monitoring for Davis-Besse Nuclear Power Station Unit 1,Annual Rept - Part I,1982)
- ML20212K396 + (Operational Radiological Environ Monitoring for Davis Besse Nuclear Power Station Unit 1:Part I Summary & Interpretation,Jan-Dec 1984)
- ML18142A335 + (Operational Radiological Environ Monitoring Program Annual Rept,1983)
- ML17303B089 + (Operational Radiological Environ Monitoring Program Rept for 1987)
- ML19309A609 + (Operational Radwaste Mgt Plan for Nv Test Site, Revision 1)
- IR 05000278/1985041 + (Operational Readiness Assessment Insp Rept 50-278/85-41 on 851026-1206.No Violations Noted.Major Areas Inspected:Mgt Oversight & Corrective Action Tracking,Preoperational Testing & RHR Pump Insps & Repairs)
- ML17348B233 + (Operational Readiness Assessment Team Insp Repts 50-250/91-38 & 50-251/91-38 on 910909-13.Violations Noted. Major Areas Inspected:Licensee Overall Operational Readiness Following Recent Outage)
- IR 05000341/1985043 + (Operational Readiness Assessment Team Insp Rept 50-341/85-43 on 850818-20 & 0916-20.No Violations,Deviations or Safety Concerns Noted.Major Areas Inspected:Conduct of Operations & Corrective Actions Associated W/Recent Events)
- ML15127A578 + (Operational Readiness Assessment Team Inspection Prerequisites)
- ML062980431 + (Operational Readiness Assessment Team Inspection Prerequisites)
- ML20150E970 + (Operational Readiness Insp Rept 50-457/88-07 on 880216-0307. Violations Noted.Major Areas Inspected:Operations, Surveillance & Testing,Maint,Radiation Controls,Chemistry Controls,Nuclear Engineering Activities & Training)
- ML20202B119 + (Operational Readiness Plan, Rev 5)
- ML20245G065 + (Operational Readiness Review Interim Rept,Browns Ferry Unit 2)
- ML20033F256 + (Operational Readiness Review Phase Two Rept Browns Ferry Unit Two)
- ML20094G699 + (Operational Readiness Review Plan for Resumption of Irts Operations,Hlw Treatment Phase II - Sludge Wash)
- ML20072R240 + (Operational Readiness Review Rept,Final Phase)
- IR 05000410/1987016 + (Operational Readiness Team Insp Rept 50-410/87-16 on 870601- 12.Violation Noted.Major Areas Inspected:Testing,Training & Maint & Assessed Licensee Readiness for Full Power Operations.Unresolved Item Identified)
- IR 05000352/1987019 + (Operational Readings Team Insp Rept 50-352/87-19 on 870817- 21.Violations Noted.Major Areas Inspected:Plant Operations, Maint,Surveillance Testing,Plant Mods & Readiness for Plant to Resume Operations Following Outage)
- ML060760398 + (Operational Records Review for License Renewal (PA))
- ML18304A392 + (Operational Requirements Manual)
- ML16306A151 + (Operational Requirements Manual (Orm))
- RS-13-009, Operational Requirements Manual (Orm) 2013 + (Operational Requirements Manual (Orm) 2013)
- ML20062H709 + (Operational Rules for Unit 3 of Rovno Nuclear Power Plant)
- ML020730621 + (Operational Safeguards Response Evaluation (Osre) Significance Determination Appeal)
- ML20207U072 + (Operational Safety Assessment Insp Rept 70-1201/87-02 on 870202-06.No Violations Identified.Four Weaknesses & 32 Improvement Items Re Emergency Contingency Planning,Fire Protection,Maint & Nuclear Criticality Safety Identified)
- ML20128C176 + (Operational Safety Assessment Rept 70-1151/92-04 on 920817- 28.Weaknesses Noted Re Control of Nonfavorable Geometry Containers.Major Areas Inspected:Process Controls,Operator Activity,Maint,Engineering & Design Control)
- U-604199, Operational Safety Review Team (Osart) Evaluation Report + (Operational Safety Review Team (Osart) Evaluation Report)
- ML16067A081 + (Operational Safety Review Team (Osart) Follow Up Mission Report)