Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19317D745 + (Forwards pre-operational Environ Radioactivity Monitoring Program Rept Under Separate Cover in Response to 701202 Request)
- ML20086D238 + (Forwards pre-test Analysis for PANTHERS-IC Tests)
- ML18019A251 + (Forwards print-ready Blue Line Emergency Preparedness Public Info Brochure Per SR Zimmerman .Formal Transmittal of Info to FEMA Understood.Parties in ASLB Hearing Received Info)
- ML20235W580 + (Forwards proprietary,ATI-VR-002-P-A & Nonproprietary, ATI-VR-002-NP-A, Topical Rept ATI Transportable Vol Reduction & Bitumen Solidification Sys (TVR-III), Per G Lainas 860410 Request.Proprietary Rept Withheld)
- ML20127B454 + (Forwards quick-look Status Rept on EPRI Hydrogen Burn Equipment Tests)
- ML20058F024 + (Forwards re-evaluation Guideline Seismic Criteria for SEP Group II Plants Reflecting NRC Decision to Request Seismic Reanalysis for Only Sse,Per SEP Topic III-6, Seismic Design Considerations)
- ML20058E900 + (Forwards re-evaluation Guideline Seismic Criteria for SEP Group II Plants Reflecting NRC Decision to Request Seismic Reanalysis for Only Sse,Per SEP Topic III-6, Seismic Design Considerations)
- ML20040B715 + (Forwards re-evaluation of Concrete Masonry Walls,In Response to IE Bulletin 80-11.Also Forwards Survey Procedure for Concrete Masonry Walls in Category I Bldgs, Procedures 9645-A-004.2 & 9645-A-004.3 & Related Documents)
- ML20063M589 + (Forwards re-evaluation of Emergency Feedwater Sys Flowrate Design Bases Per NUREG-0737,Item II.E.1.1,in Response to)
- ML19345H339 + (Forwards re-evaluation of Predicted Radiation Levels for Valves Needed in long-term Core Cooling Qualification. Revised Data Sheet Pages 6-63 & 6-85 Encl to Replace Pages in Existing Environ Qualification Package)
- ML18046B167 + (Forwards re-evaluation of SEP Topics V-10.B, RHR Sys Reliability, V-11.B, RHR Interlock Requirements & VII-3, Sys Required for Safe Shutdown. Encl Revised Pages for SEP Topic VIII-3 Should Be Substituted Into 811027 Rept)
- ML20070C709 + (Forwards re-evaluation of safety-related Concrete Masonry Walls Per IE Bulletin 80-11.Requests NRC Review Be Concluded by June 1983)
- ML20214P232 + (Forwards re-evaluation of wet-bulb Temp Operating Restrictions on Essential Svc Water Cooling Towers,Proposing New Operating Limit of 90 F,For Review & Approval.Deletion of 861103 & 870114 Proposals Requested)
- ML19320C294 + (Forwards re-executed Certificate of Svc Correcting Svc Date to 800710 Re NRC 800710 Response to Carolina Environ Study Group Motion to Reopen Record & NRC 800710 Response to Util Motion to Terminate Stay of Initial Decision)
- ML20058K186 + (Forwards re-issue Rev 5 to Training & Qualification Plan for security.Re-transmittal Due to Disapproval of Rev 6,as Stated in .Rev Withheld (Ref 10CFR73.21))
- ML20127B358 + (Forwards re-review of Tech Specs to Determine Whether Specs Properly Derived from Analysis & Evaluation Included in FSAR & SER)
- ML19332F433 + (Forwards re-revised Pages 1:4,1:5,1:6 & 13:1 to Security Plan & Page 41 to Training & Qualification Plan.Encl Withheld (Ref 10CFR73.21))
- ML20086G950 + (Forwards re-typed TS Pages for License Change Requests 94-08,94-11 & 94-12)
- ML20148P179 + (Forwards recently-issued INPO Rept Dealing W/Operational Aspects of Facility & Util Responses Re Activities.Matls to Be Submitted as Evidence But Are for Board Info.Certificate of Svc Encl)
- ML20209F784 + (Forwards redacted/non-proprietary & Proprietary Versions of Rev 3 of Transtor Impact Limiter Test Plan & Rev 0 of Calculation Bnfl 1.10.06.84, Impact Limiter Pretest Predictions,Corner & End Drops. Proprietary Encls Withheld)
- ST-HL-AE-3217, Forwards risk-based Evaluation of Plant Tech Specs + (Forwards risk-based Evaluation of Plant Tech Specs)
- ML16139A393 + (Forwards risk-based Insp Guides Described in Mods to Insp Manual Chapter 2515.W/o Encls)
- ML20210T322 + (Forwards round-two Question & Position Re Geology & Foundation Engineering for Satsop Site.Question 323.12 Remains Unanswered.Util Recommended to Develop & Consistently Use Sedimentary Terminology for Mapping)
- ML17334A872 + (Forwards s Re Description of Loca/Eccs Models Used by Exxon Nuclear Co in Response to 850329 Request. Error Described in Exxon GFO:85:010 Applicable to Unit 1 Only)
- ML19326B013 + (Forwards s Re Facility Installation Near Port Clinton,Oh.Requests Assistance in Responding to Concerns)
- ML20027D214 + (Forwards s Re SEP Phase III for Distribution)
- ML20237E033 + (Forwards s Requesting Registration as User of Tech/Ops 650 & 660 Devices & Supporting Info Confirming NRC Approval of QA Program,Obtained 840523.Current Us Address for Ultra Technology Inc Listed)
- ML20147E089 + (Forwards s Wolfe 781010 Ltr to ASLB)
- ML17347B617 + (Forwards s from Constituents Concerning Operational Problems at Facility)
- ML20246J906 + (Forwards s from GE Withdrawing 760504 & 10 Applications for Licenses to Export Two Power Reactors & Fuel.Review Should Be Discontinued)
- ML19207A760 + (Forwards s from Util to SW Harvey & Jc White of EPA Re Aquatic Monitoring Programs Including Proposed Amend to EPA License)
- ML19347A609 + (Forwards s to ASLB & to CPC Counsel.Schedule of Witnesses Cannot Be Agreed Upon W/Cpc.Requests ASLB to Order Counsel 761229 Witness Schedule & to Continue Hearing Wk of 770124 & Thereafter.Related Correspondence)
- ML19276H104 + (Forwards s to All Parties on Svc List in Proceeding.Ltrs Were Returned from Us Post Ofc.Discovery Will Begin with Massive Sweep Through Member Cities.Requests Copy of Forecast Demand for Electricity & Natural Gas)
- ML19322D829 + (Forwards s to Commissioners Omitted from .W/O Encls)
- ML20010C047 + (Forwards s to Technical Socs Re Natl Reliability Evaluation Program Procedures Guide Activities)
- ML20141L859 + (Forwards s to Utils Requesting Info on Experience W/Rod Worth Minimizers)
- ML20092P530 + (Forwards s to a Hodgdon & ASLB Re Misinformation as to Status of Point Pleasant Diversion by Staff.Commission Should Direct That Del-Aware,pending 10CFR2.206 Petition, Identify All Possible Options)
- ST-HL-AE-2265, Forwards safety-related Maint Procedures Which Require Use of Jumpers or Lifting Leads,Per NRC Requests.Util Will Not Lift Leads or Install Jumpers for Routine Channel Testing Unless No Other Method Practical + (Forwards safety-related Maint Procedures Which Require Use of Jumpers or Lifting Leads,Per NRC Requests.Util Will Not Lift Leads or Install Jumpers for Routine Channel Testing Unless No Other Method Practical)
- ML18025B565 + (Forwards security-related Info Re Physical Security Plan Revisions,In Response to NRC .Info Withheld (Ref 10CFR2.790))
- ML20041B499 + (Forwards security-related Info.Info Withheld (Ref 10CFR2.790))
- ML20108B113 + (Forwards self-assessment Overview,Detailed Plan & Team Member Qualifications for NRC Review & Approval.Encl 1 Outlines Objectives,Scope,Method,Schedule,Resources & Team Composition)
- ML19351E503 + (Forwards self-explanatory Executive Branch Views on Three Pending Export Applications.Commission Action Paper Is Being Prepared.W/O Encl)
- ML20127N707 + (Forwards self-explanatory Ltr from Jp Badalich to E Ewald)
- ML19347A612 + (Forwards self-explanatory Ltr to CPC Counsel.Requests ASLB to Order Proposed Schedule for Witnesses & to Continue Suspension Hearing W/O Interruption Until Completion. Related Correspondence)
- ML20151T421 + (Forwards self-explanatory Ltr to Members of Appeal Board W/Attachment to Applicant 880411 Brief Re Resolution of Official Unsecured Creditors Committee of Public Svc Co of New Hampshire)
- ML19327A928 + (Forwards self-explanatory Memo Re Facility Investigation,For Info.Related Info Encl)
- ML20127N683 + (Forwards self-explanatory Telegram from NSP to Jp Badelich, for Info of Joint Committee)
- ML20097J471 + (Forwards semi-annual FFD Program Performance Data Rept for Wolf Creek Generating Station,Per 10CFR26.71(d).Rept Covers Period of 950701-1231)
- ML20149K789 + (Forwards semi-annual FFD Program Performance Data for Period of 950701-1231,per 10CFR26.71(d))
- ML20202C879 + (Forwards semi-annual FFD Program Performance Data Rept WCGS IAW 10CFR26.71(d).Rept Covers Six Month Period Beginning 970701-971231)
- ML20211H020 + (Forwards semi-annual FFD Rept for 990101-0630 for DBNPS, Unit 1,IAW 10CFR26.71(d))