Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Schedule for Completion of SER Commitments (NUREG-0843)". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20032A713  + (Forwards Schedule for Completion of Sandia Labs Tests on DG Obrien Electrical Genetrations.Completion Date Delayed Until Mar 1982,due to Difficulties in Obtaining Environ Test Chamber & Radiation Dose Rates)
  • ML20072M777  + (Forwards Schedule for Completion of Suppl 1 to NUREG-0737 Requirements for Emergency Response Capability.Date of Safety Parameter Display Sys Delayed 60 Days.All Other Activities Consistent W/Orginal Plan)
  • ML20023E050  + (Forwards Schedule for Completion of full-term License SEP Commitments Contained in NUREG-0827.Three Items Resolved After Issuance of Draft NUREG-0827 Listed)
  • ML20132E058  + (Forwards Schedule for Completion of long-term Actions Required within 60 Days Following Restart,Per NRC 841016 request.Multi-point Recording Device to Provide Frequent Monitoring for Each Assembly Motor Installed)
  • DCL-85-107, Forwards Schedule for Conducting Operator Exams for Remainder of Fy Through 880930,per Generic Ltr 85-04.Related Correspondence  + (Forwards Schedule for Conducting Operator Exams for Remainder of Fy Through 880930,per Generic Ltr 85-04.Related Correspondence)
  • ML20235S270  + (Forwards Schedule for Conducting Remaining Startup Tests. Util Determined That Objectives of Several Tests Satisfactorily Demonstrated & Addl Testing No Longer Required)
  • ML20078Q619  + (Forwards Schedule for Continuing Shipment of Spent Fuel from West Valley to Facility.W/O Encl)
  • ML20237K439  + (Forwards Schedule for Corrective Actions from States of Mi & in for Weaknesses Identified During 870819-20 Joint Full Participation Radiological Emergency Preparedness Exercise)
  • ML20217Q379  + (Forwards Schedule for DOE Insps of Completed & Licensed Title I & Title II Sites)
  • ML19268C264  + (Forwards Schedule for Development of NRC Action Plan on TMI-2.Discusses Schedule Briefly)
  • ML20126F240  + (Forwards Schedule for Environ & Safety Reviews of OL Application Intended to Meet NRC 810222 Memo.Describes Scope & Status of Reviews.Requests Reviewers Be Assigned to Applicable Review Branches)
  • TXX-3226, Forwards Schedule for Environ Qualification Tests for Class IE Equipment to Be Conducted within Next Two Yrs for safety-related Equipment,In Response to NRC  + (Forwards Schedule for Environ Qualification Tests for Class IE Equipment to Be Conducted within Next Two Yrs for safety-related Equipment,In Response to NRC)
  • ML20138H429  + (Forwards Schedule for Evaluation of IPEEE & IPE for Cooper Nuclear Station)
  • ML18082A492  + (Forwards Schedule for Evaluation of Westinghouse Steam Generator Row One U Bends.Requests Delay of NRC Issuance of Generic Ltrs to near-term OL Plants Requiring Plugging of Row One Tubes,In Confirmation of 800415 Meeting)
  • ML19347D457  + (Forwards Schedule for FY81 mid-yr Review Re Water Reactor Safety Research)
  • ML19347D459  + (Forwards Schedule for FY81 mid-yr Review Re Water Reactor Safety Research)
  • ML20072H533  + (Forwards Schedule for Feb 1983 Commitments Re Design Criteria in Srp.No Further Change Necessary W/Exception of FSAR Conformance Review Table 1.8-3)
  • ML20236J665  + (Forwards Schedule for Five Specialists Assigned to Special Testing & Startup Activities for Plant.Total Time Comes to 303 Days,Close to Level of Effort Contained in Statement of Work)
  • ML18051A680  + (Forwards Schedule for Formal Submittal of Final Radiological ETS & Offsite Dose Calculation Manual Per NUREG-0472.Meeting W/Nrc & Franklin Research Ctr During First Wk of Apr 1984 Requested)
  • ML20062H855  + (Forwards Schedule for Forming,Rebar Installation & Concrete Placement.Schedule Shows Plan for Const of Seismic Sludge Mobilization Sys Pipe Trench & Valve Pits.Placement of Concrete in Cell Wall Modules Also Shown)
  • ML20199F508  + (Forwards Schedule for Four Emergency Response Facility (ERF) Appraisals,Per 851003 Memo.Erf Appraisals Will Be Conducted Using Existing Procedure.Draft Ltr to Inform Licensees within 40 Days of Planned ERF Appraisal Also Encl)
  • ML17207A756  + (Forwards Schedule for Further Discovery.Recommends That ASLB Adopt Schedule)
  • ML20056G992  + (Forwards Schedule for Future TS Amend Requests & List of TS Changes Awaiting NRC Approval)
  • ML20028B330  + (Forwards Schedule for Hardware Changes Resulting from SEP Integrated Assessment,Assessment Summary Table,Seismic Review Summary & Pickard,Lowe & Garrick,Inc Technical Assessments of Selected Oyster Creek SEP Topics.)
  • ML20028B329  + (Forwards Schedule for Hardware Changes Resulting from SEP Integrated Assessment,Assessment Summary Table,Seismic Review Summary & Pickard,Lowe & Garrick,Inc Technical Assessments of Selected Oyster Creek SEP Topics)