ML20053B349
| ML20053B349 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 05/25/1982 |
| From: | Vandewalle D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.3, TASK-1.C.1, TASK-1.D.1, TASK-2.B.1, TASK-2.B.2, TASK-2.D.2, TASK-2.K.3.18, TASK-2.K.3.30, TASK-2.K.3.31, TASK-3.A.1.2, TASK-3.A.2.2, TASK-3.D.3.4, TASK-TM GL-82-10, NUDOCS 8205280318 | |
| Download: ML20053B349 (4) | |
Text
Fo CODSUmBTS Power David J VandeWalle C0I g
wl b% clear Licensing Administrator oeneral offmes: 1945 West Parnell Road, Jackson, MI 49201 *(517) 788-1636 May 25, 1982 Darrell G Eisenhut, Chief Division of Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - RESPONSE TO GENERIC LETTER 82 POST TMI REQ 3IREMENTS By letter dated May 5, 1982 the NRC requested that Consumers Power Company establish a schedule or reconfirm the previously established schedule for the completion of several NUREG-0737 items. The attachment to this letter provides the requested information. The attachment lists the NUREG-0737 item, whether or not the item is considered complete and the date and page reference of the previous Consumers Power Company letter that provides the pertinent information. For those NUREG-0737 items that are listed in the attachment as not being complete, the following information reiterates Consumers Power Company's established positions.
By letter dated April 1, 1982 and entitled " Shift Manning Evaluation",
Consumers Power Company provided a detailed PRA based evaluation of the staffing levels necessary for the safe operation of the Big Rock Point Plant during transient and accident conditions.
(NUREG-0737 Item III.A.1.2.) This evaluation was provided in response to Generic Letter 81-10 and has been scheduled to be discussed during a meeting between representatives of Consumers Power Company and the NRC to be held on June 1, 1982. Appropriate implementation schedules will be determined subsequent to NRC staff review.
Consumers Power Company letter of March 5, 1982 informed the NRC that Consumers Power Company is considering contracting the BWR Owners Group to perform the Control Room design review for the Big Rock Point Control Room (g t/[
(NUREG-0737 Item I.D.1) and that recommendations concerning a Safety Parameter Display System (NUREG-0737 Item II.D.2) will be made as part of the eventual 1
Control Room design review.
I I oc0582-0018a142 820 5 28 0 3 (T3 3
Darrell G Eisenhut, Chief 2
Big Rock Point Plant Generic Letter 82-10 Response May 25, 1982 A final decision on this matter is expected soon. At that time, Consumers Power Company will submit additional information concerning the survey program plan and schedule.
The schedule for the completion of NUREG-0737 Items. I.C.1, Revise Emergency Procedures, II.B.1, Reactor Coolant System Vents and III.D.3.4, Control Room liabitability Requirements remain as indicated in the letters cited in the attachment.
f e
L' cn-c cA.
David J VandeWalle Nuclear Licensing Administrator CC Chief, Operating Reactors Branch No 5 Administrator, Region III, USNRC NRC Resident Inspector-Big Rock Point page i
I l
k oc0582-0018a142
7 CONSUMERS POWER COMPANY Big Rock Point Plant Post-TMI Requirements (Generic Letter No 82-10)
Response to NRC letter dated May 5, 1982 Docket No 50-155 License No DPR-6 At the request of the Commission and pursuant to the Atomic Energy Act of 1954, and the Energy Reorganization Act of 1974, as amended, and the Commission's Rules and Regulations thereunder, Consumers Power Company submits our response to NRC letter dated May 5, 1982 (Post-TMI Requirements - Generic Letter No 82-10) and received by Consumers Power Company May 11, 1982.
Consumers Power Company's response is dated May 25, 1982.
CONSUMERS POWER COMPANY By _-
./4/ dh k)I R B DeWitt, Vice President Nuclear Operations Sworn and subscribed to before me this 25th day of May 1982.
W
)
N a
' ' }felen~1 Dempski, Notjfy Public Jackson County, Michigan My commission expires December 14, 1983.
j nu0582-0018bl42
ATTACHMENT Item Title Complete Letter Date I.A.1.3.1 Shift' Manning Yes CPCo Dec 19, 1980, pg 6 (Limit Overtime)
NRC Feb 4, 1982 I.A.I.3.2 Shift Manning Yes*
CPCo Apr 1, 1982 (Minimum Shift Crew)
CPCo Apr 16, 1982 I.C.1 Revise Emergency No CPCo Dec 19, 1980, pg 11 Procedures I.D.1 Control Room No CPCo Mar 5,1982 Design Reviews II.B.1 Reactor Coolant No CPCo Feb 5, 1982, pg 24B System Vents CPCo May 14, 1982 II.B.2.3 Plant Shielding Part 3 Yes CPCo Dec 19, 1980, pg 27 Environmental NRC Mar 19, 1982 Qualification II.D.2 Safety Parameter No CPCo Mar 5,1982 Display System II.K.3.18 ADS Actuation Not Applicable CPCo Dec 19, 1980, pg 87 II.K.3.30 SB LOCA. Analyses Yes CPCo Feb 5, 1982, pg 99A
& 31
& 100A III.A.I.2 Staffing Levels for Yes*
CPCo Apr 1, 1982 Emergency Situations III.A.1.2 Upgrade Emergency Yes CPCo Feb 5, 1982, pg 121C Support Facilities III.A.2.2 Meteorological Data Yes CPCo Feb 5, 1982, Pg 122C III.D.3.4 Control Room Habita-No CPCo Feb 5, 1982, pg 127B bility Requirements CPCo April 16, 1982
- Pending NRC review and acceptance.