i Southern Naciear Opera:rng Company Post Office Box 1295 Bemma n. Atabama 35201 Teleph'one (205) 868-5131 k

L Southern Nuclear Operating Company o.ve uo,ey the soutneIn e'ectnc system

[7[R[l[

AUGUST 31, 1993 Docket Nos.:

50-348 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Schedule for Future Technical Specification Amendment Reauests Gentlemen:

In order to best coordinate the efforts of both Southern Nuclear Operating Company (SNC) and the NRC Staff, a schedule for future technical specification amendment requests is provided as Attachment I to this letter. Those proposed changes for which approval is needed to support an established refueling outage have been denoted. Attachment 2 summarizes previously submitted technical specification change requests for which SNC is awaiting approval. SNC solicits the NPC cooperation in working toward this proposed schedule.

If there are any questions, please advise.

1 Respectfully submitted, h2m-Dave Morey BHW/maf:TSPLAN.BHW Attachments cc: Mr. S. D. Ebneter Mr. T. A. Reed Mr. M. v. Moraan l

9309080047 930831 Q

DR ADOCK 0500034g 9

- g, l

p PDR yt

()

j 1

Planned Technical Specification Amendment Requests P1anned Planned Data for l

Submittal Date Anoroval l

1) Steam Flow / Feed Flow Mismatch Sept. 1993-March 1994
  • Trip Deletion and S/G Lo lo j

Level Setpoint Decrease j

2) Unit 1 S/G Tube IPC Nov.'1993 March 1994 *
3) RPS & EFS Surveillance Oct. 1993 June 1994 Frequency Change from

'j Monthly to Quarterly

}

4) RPS & ESF Response Time Oct. 1993 June 1994 I

Relocation to the FSAR

5) S/G Tube Degradation Specific Nov. 1993 Oct. 1994 Management and Tubesheet APC e
6) RPS & ESF Response Time Dec. 1993 Aug. 1994 l

Test Deletion (Limited Scope) i

7) Fuel Reconstitution Jan. 1994 Feb. 1995
  • l
8) S/G Level Tap Change Which Feb. 1994 Feb. 1995
  • i Revises to Lo Trip Setpoint i
9) Direct S/G Tube Repair-March 1994 Feb. 1995
  • l
10) ESF Equipment LC0 Extension April 1994 Jan. 1995 l

l

  • Requested approval date tied to an established refueling outage design change i

Schedule i

j

=

)

~i i

. ~ -

.I

l i

1 1

Technical Specification Changes Awaiting NRC Approval l

1 Requested l

Chance DescriDtion Egit Submitted ADDr0 val Date

- Station Blackout 03-04-93 09-01-93 i

- RETS Deletion per G.L. 89-01 06-23 02 09-01-93 I

- 10 CFR Part 20 08-24-92 09-01-93

- Annual Effluent Reporting 04-14-93 09-01-93 l

- Unit 2 S/G Tube IPC 07-29-93 09-17-93

}

i

- 10 CFR Part 55 08-28-92 08-31-93 l

- LTOP per G.L. 90-06 10-13-92