Docket No. 50-346 nxsoo License No. NPF-3 RCHAAO P. CnouSE Serial No. 968 vo n,,,,
uw July 11, 1983 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Eisenhut:
Within our letter dated April 15, 1983 (Serial No. 933), Toledo Edison submitted schedules for completing each of the basic requirements of Supplement 1 to NUREG 0737, Requirements for Emergency Response Capability.
Subsequent to that, a re-confirmation of the schedule for which the Davis-Besse Nuclear Power Station.
Unit 1, will complete the mentioned requirements was requested. The action items and dates listed on the attachment have been planned to meet this request, through the review of the applicable requirements and the project status and development, as they currently exist.
Your office will be informed of any problems or circumstances having an impact on this implementation schedule.
Since the forwarding of the April 15, 1983 submittal, work involved on the Safety Parameter Display System (SPDS) development has progressed more slowly than expected. Therefore, as seen on the attachment, dates relative to the com-pletion of this activity have been delayed 60 days. Dates for all other activi-ties associated with the Toledo Edison Emergency Response Capability are con-sistent with the April 15, 1983 submittal.
Further information detailing the work effort involved in each initiative and action item is available in the April 15, 1983 submittal.
Very truly yours, fkm RPC:JSH:nif encl.
cc: DB-1 NRC Resident Inspector dh A. DeAgazio, Project Manager, NRC l
8307150091 830711 I
PDR ADOCK 05000346
.!l k F
PER THE TOLEDO EOISON COMPANY EDISON PLAZA 300 MAOISON AVENUE TOLEDO. OHIO 43652
t 1 INITIATIVE ker?C?
1.0 Safety Parameter Display System (SPDS) gy[g$
h ACTION DATE n -.o v.o 1.1 Safety Analysis SPDS Details November 30, 1983 ge-w
"$%?
1.2 Verification & Validation Activi-
'f y w c' ties and Operator Training January 13, 1984 l.3 SPDS displays will be fully functional November 30, 1984 2.0 Detailed Control Room Design Review (DCRDR)
ACTION DATE 2.1 DCRDR Program Plan Submittal Submitted - June 15, 1983 2.2 DCRDR Summary Report Submittal April 15, 1984 I
3.0 Regulatory Guide 1.97 ACTION DATE 3.1 Regulatory Guide 1.97 Report Sub-mittal April 15, 1984 4.0 Upgrade Emergency Operating Procedures (EOP)
ACTION DATE 4.1 Procedures Generation Package March 1, 1984 4.2 Train Operators and Implement Pro-cedures September 30, 1984 RPC:JSH:nif J
-