e TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 37401 SN 157B Lookout Place MAR 241988 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Centlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - NRC INSPECTION REPORT NOS. 50-327/87-60 AND 50-328/87-60 At an NRC exit meeting held at SQN on October 6, 1987, TVA committed to performing an evaluation of the containment spray (CS) annubar flow instrumentation to determine the need for any modifications.
In response to a verbal request from the SQN resident inspector, I am submitting the schedule for completion of this evaluation.
The CS annubar flow instrumentation evaluation and the recommendations for the final CS flow instrumentation configuration will be completed by July 15, 1988.
Il you have any questions, please telephone M. R. Harding at (615) 870-6422.
Very truly yours.
d ey, ctor Nuclear Licen ng and Regulatory Affairs Enclosure cc: See page 2 1
e803300144$$$$$327 I
An Equal Opportunity Employer
. U.S. Nuclear Regulatory Commission
[
g cc (Enclosure):
Mr. K. P. Barr, Acting Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. G. G. Zech, Assistant Director for Projects TVA Projects Division U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 l
l l
l l
EUCLOSURE List of Cott:nitments 1.
TM CO annubar flow instrumentation evaluation and the recommendations fot' tiie f tstal CS flow instrumentation configuration will be completed by l