Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19345G219 + (Forwards Revision 3 to Response to IE Bulletin 79-01B,Suppl 3, Environ Qualification of Class IE Equipment. Revision 3 Encompasses Boron Precipitation Control Sys,Ie Pressurizer Heaters Sys & post-TMI Mods.W/O Encl)
- ML19208D801 + (Forwards Revision 3 to Response to IE Bulletin 79-06B. Supercedes Attachments to .Encl 1 of IE Bulletin 79-05 & Sequence of Events Included in Encl 1 to IE Bulletin 79-05A Have Been Reviewed)
- ML20052A811 + (Forwards Revision 3 to SAR for Model CNS 1-13 Cii.Amend Addresses Potential Generation of Combustible Gases & Specifies Shipping Criteria Necessary & Sufficient to Assure Safe Waste Shipment)
- ML20028A873 + (Forwards Revision 3 to Safeguards Contingency Plan.Revision Withheld (Ref 10CFR73.21))
- ML20011A257 + (Forwards Revision 3 to Safeguards Contingency Plan.Revision Withheld (Ref 10CFR2.790))
- ML20003J270 + (Forwards Revision 3 to Safeguards Contingency Plan.Revision Withheld (Ref 10CFR2.790))
- ML20003H637 + (Forwards Revision 3 to Sar,Including Revision C to Drawing. Revision Allows Expanded Honeycomb to Be Replaced by Basic Energy Absorbing Rigid Foam.Requests That Certificate of Compliance 9070 Be Modified Accordingly)
- ML20063K293 + (Forwards Revision 3 to Security Force Qualification & Training Program,Consisting of Minor Miscellaneous Changes on Weapons Training & Complete Revision of App C.Revision Withheld (Ref 10CFR2.790))
- ML20063P334 + (Forwards Revision 3 to Security Force Training & Qualification Manual.Revision Withheld (Ref 10CFR2.790))
- ML20054C703 + (Forwards Revision 3 to Security Plan & Revision 2 to Security Personnel Training & Qualification Plan. Revisions Withheld (Ref 10CFR73.21))
- ML20038A464 + (Forwards Revision 3 to Security Plan,Documenting Resolution of Remaining Six Deficiencies Noted in NRC . Encl Withheld (Ref 10CFR2.790))
- ML19338G629 + (Forwards Revision 3 to Security Plan,Training & Qualification Plan & Safeguards Contingency Plan.Plans Withheld (Ref 10CFR2.790))
- ML19345D407 + (Forwards Revision 3 to Security Plan.Revision Withheld (Ref 10CFR2.790))
- ML20063N062 + (Forwards Revision 3 to Security Plan.Revision Withheld (Ref 10CFR73.21))
- ML20011A689 + (Forwards Revision 3 to Security Training & Qualification Plan.Revision Withheld (Ref 10CFR.2.790))
- ML20003F828 + (Forwards Revision 3 to Snupps FSAR)
- ML19344E767 + (Forwards Revision 3 to Spent Fuel Transportation Security Plan,Which Meets Requirements of 10CFR73.37,as Amended 800603.Requests Approval of Primary Route for Shipment of Oconee Spent Fuel.Revision Withheld (Ref 10CFR2.790))
- ML18043A913 + (Forwards Revision 3 to Steam Generator Repair Rept)
- ML18043A914 + (Forwards Revision 3 to Steam Generator Repair Rept)
- ML19330B915 + (Forwards Revision 3 to Task Action Plan A-8 Re Mark II Containment Pool Dynamic Loads)
- ML19275A167 + (Forwards Revision 3 to Task Action Plan A-7, Mark I Containment Long-Term Program. Revisions Include two-month Slip in Projected Generic Completion Date & Recent Manpower & Technical Assistance Funding Changes)
- ML20010A373 + (Forwards Revision 3 to Util QA Program for Design & Const. Revision Incorporates Info & Clarifications Previously Communicated to NRC by Ltrs as Well as Previously Discussed Organizational Changes.W/O Encl)
- ML19343C592 + (Forwards Revision 3 to Util Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Equipment That Will Be Utilized to Achieve One Path to Cold Shutdown Listed.W/O Encls)
- ML19323E312 + (Forwards Revision 3 to WCAP-8587, Methodology for Qualifying Westinghouse Wrd Supplied Safety-Related Electrical Equipment, in Response to NRC Requests During 800130 & 800227 Meetings)
- ML20010F916 + (Forwards Revision 3 to WCAP-8687, Equipment Qualification Data Package Suppl 1 EQDP-ESE-16, Solid State Protection Sys (Ssps) & Proprietary Revision 1 to WCAP-8687,Suppl 2 E16A.Proprietary Version Withheld (Ref 10CFR2.790))
- ML112990914 + (Forwards Revision 3, Inservice Insp & Testing Program)
- ML20101L450 + (Forwards Revision 3,Reactor Operation Requalification Plan & Audit & Review Plan for University of Utah Center)
- ML19345G855 + (Forwards Revision 34 to FSAR & Responses to NRC Request for Addl Financial Info.Revision 34 to FSAR Also Constitutes Amend 34 to OL Application)
- ML19345G856 + (Forwards Revision 34 to FSAR & Responses to NRC Request for Addl Financial Info.Revision 34 to FSAR Also Constitutes Amend 34 to OL Application)
- ML20008G162 + (Forwards Revision 34 to Fsar,Submitted as Amend 90 to Application for CPs & OLs)
- ML19322A880 + (Forwards Revision 35 to FSAR Updating FSAR & Responding to Goller .Page W/Changes & Corrections Only Encl)
- ML19317D393 + (Forwards Revision 36 to Fsar.Page of Changes & Corrections Only Encl)
- ML19291A298 + (Forwards Revision 3A to QA Program Rept NU-GA-1)
- ML20083K274 + (Forwards Revision 4 (Change 5) to State of Sc Peacetime Radiological Emergency Response Plan,)
- ML112990262 + (Forwards Revision 4 of ASME Code Section XI Inservice Insp & Testing Program & Info Required for NRC Review of Requests for Relief from ASME Section XI Requirements)
- ML112990263 + (Forwards Revision 4 of ASME Code Section XI Inservice Insp & Testing Program & Info Required for NRC Review of Requests for Relief from ASME Section XI Requirements.)
- ML20062D600 + (Forwards Revision 4 of CRBRP-3,Vol 2, Hypothetical Core Disruptive Accident Considerations in Crbrp:Assessment of Thermal Margin Beyond Design Base)
- ML19276G212 + (Forwards Revision 4 of Certificate of Compliance 4986 for Shipping Package Models RA-1,2,3 & J)
- ML19281B111 + (Forwards Revision 4 of Certificate of Compliance 9044 for Shipping Package Model GE-1600)
- ML19276G335 + (Forwards Revision 4 of Certificate of Compliance 6386 for Shipping Package Model 235R001)
- ML19269E222 + (Forwards Revision 4 of Certificate of Compliance 6387 for Shipping Package Model 60)
- ML19281B460 + (Forwards Revision 4 of Certificate of Compliance 6058 for Shipping Package Model B3-1)
- ML19276G318 + (Forwards Revision 4 of Certificate of Compliance 6697 for Shipping Package Model GE-8500)
- ML19340C407 + (Forwards Revision 4 of In-Plant Safety Relief Valve Test)
- ML19340C408 + (Forwards Revision 4 of In-Plant Safety Relief Valve Test.)
- ML19339B837 + (Forwards Revision 4 of QA Program,Providing List of Changes Made to Previously Submitted Revision 3)
- ML19340E828 + (Forwards Revision 4 of Response to IE Bulletin 79-02, Documenting Commitment to Complete Necessary Repairs Prior to Fuel Load)
- ML18044A735 + (Forwards Revision 4 of Steam Generator Repair Rept, Which Is Being Served on Parties to Proceeding.W/O Encl)
- ML20039C708 + (Forwards Revision 4 of XN-NF-1A, QA Program Topical Rept for Nuclear Fuel Design & Fabrication. Encl Incorporates Recent Organization Change & Listed Minor Changes)
- ML19345G460 + (Forwards Revision 4 to 790220 Security Plan.Plan Withheld (Ref 10CFR2.790).Revision Incorporates Changes in Response to NRC 801215 Questions)
- ML19256E812 + (Forwards Revision 4 to 790424 Response to NRC 10CFR50.54(f) Request.Revision Provides Complete Response to Question 23 of NRC 790911 Request for Addl QA Info)