Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19322E370 + (Forwards Revised Physical Security Plan,Chapter 8.Encl Withheld (Ref 10CFR2.790))
- ML20209C523 + (Forwards Revised Physical Security Plan,Including Contingency Plan & Training & Qualification Plan,Per 10CFR50.54(p).Plan Will Be Implemented on 870415.Plan Withheld)
- ML19257D129 + (Forwards Revised Physical Security Plan. Plan Withheld(Ref 10CFR2.790))
- ML20010F074 + (Forwards Revised Physical Security Plan.Summary of Changes Encl.Plan Withheld (Ref 10CFR2.790))
- L-86-225, Forwards Revised Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld (Ref 10CFR73.21) + (Forwards Revised Physical Security Plan.Changes Do Not Decrease Safeguards Effectiveness of Plan.Plan Withheld (Ref 10CFR73.21))
- ML20247D513 + (Forwards Revised Physical Security Plan.Changes Detailed in Summary of Plan Revs.Encl Withheld,Per 10CFR50.54(p)(2))
- ML20149H557 + (Forwards Revised Physical Security Plan.Encl Withheld (Ref 10CFR73.21))
- ML19249A347 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- ML19323F557 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- ML19347D606 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- AECM-82-138, Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790) + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- ML20049J675 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- ML20041E402 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- AECM-80-272, Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790) + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- ML20032B097 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- ML19323F570 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- ML20031D009 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- ML20031H040 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790))
- ML20054F584 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR73.21))
- ML20070G173 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR73.21))
- ML20081M887 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR73.21))
- ML20140E449 + (Forwards Revised Physical Security Plan.Plan Withheld (Ref 10CFR73.21))
- ML20078E669 + (Forwards Revised Physical Security Plan.Plan Withheld Per 10CFR73.21)
- HL-4694, Forwards Revised Physical Security Plan.Plan Withheld Per 10CFR73.71 + (Forwards Revised Physical Security Plan.Plan Withheld Per 10CFR73.71)
- ML20085A137 + (Forwards Revised Physical Security Plan.Rev Withheld)
- ML20135H990 + (Forwards Revised Physical Security Plan.Rev Withheld (Ref 10CFR2.790))
- ML20153G083 + (Forwards Revised Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20100P295 + (Forwards Revised Physical Security Plan.Revs Withheld Per 10CFR73.21)
- ML20050B569 + (Forwards Revised Physics Test Program & Revised FSAR Table 14.1-65.a,augmented low-power Test.Changes Will Be Reflected in Next FSAR Amend)
- ML20115H502 + (Forwards Revised Pilgrim Relief Request (PRR)-24 Re Third Ten-Yr ISI Program)
- ML20134G947 + (Forwards Revised Pilot Initial Exam Rept 50-483/97-01 Ltr Re Incorrect Headings on Subsequent Pages)
- ML17326B558 + (Forwards Revised Piping Sys Acceptance Criteria & List of Installed Copes-Vulcan Valves,Per 881220 Telcon W/Nrc Re Discrepancy in Weight & Ctr of Gravity in Valves)
- ML18051B275 + (Forwards Revised Plan & Schedule for Completion of Actions Required by Generic Ltr 83-28,per 841010 Commitment.Summary Reflecting Status of Previously Submitted Responses to Issues Included)
- ML20084L887 + (Forwards Revised Plan Re Operator Requalification & Recertification Program for Jul 1995 Through June 1997)
- ML20137U366 + (Forwards Revised Plan for Big Rock Point Integrated Assessment,Addressing NRC Concerns Raised During Preliminary Review of 850607 Request for Proposed Change to License DPR-6)
- CY-99-066, Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors + (Forwards Revised Plan for Recovery of Licensed Matl from Offsite Locations.Completion of Implementation of Plan During Summer of 1999 Is Planned,Contingent on Support Extended by Property Owners,Weather & Uncontrolled Factors)
- ML20148D241 + (Forwards Revised Plan for long-range Planning Program,Per NRC Request Re Util 870713 Application for Amends to Licenses DPR-50 & DPR-16)
- 3F0891-10, Forwards Revised Plan of Study for flow-through Toxicity Tests for Facility.Rev Reflects Change to Hydroquinone Concentration to 2 Mg/L.W/O Plan + (Forwards Revised Plan of Study for flow-through Toxicity Tests for Facility.Rev Reflects Change to Hydroquinone Concentration to 2 Mg/L.W/O Plan)
- ML20132B954 + (Forwards Revised Plan to Address USGS Clarification of Position Re Seismic Design Earthquakes in Eastern Seaboard of Us.Schedule for Completion of Probabilistic Section Is 1985 & Deterministic Section Early in 1986)
- ML18033A792 + (Forwards Revised Plan to Qualify CRD Hydraulic Piping Sys, Including Insert & Withdrawal Piping,Valves & Piping Supports.Mods to Satisfy Interim Operability Criteria Will Be Installed Prior to Restart from Current Outage)
- ML20132F880 + (Forwards Revised Plans & Calculations Re Control Room Habitability (NUREG-0737,Item III.D.3.4).Design Verification for VA-65 Ductwork in Progress.Relocation Expected Prior to Restart After Fall 1985 Outage)
- L-80-297, Forwards Revised Plans for Monitoring Noble Gases Which Might Be Released from Steam Plant,Per TMI Lessons Learned Task Force short-term Requirements + (Forwards Revised Plans for Monitoring Noble Gases Which Might Be Released from Steam Plant,Per TMI Lessons Learned Task Force short-term Requirements)
- LR-N990389, Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars + (Forwards Revised Plant Attribute Libraries for Salem & Hope Creek Generating Stations,Iaw 10CFR50,App E,Vi, Emergency Response Data Sys, 3.b.Changes Are Identified by Rev Bars)
- ML20245C357 + (Forwards Revised Plant Emergency Operating Procedure Insp Schedule)
- ML18019A588 + (Forwards Revised Plant Emergency Procedures,Including Rev 2 to PEP-223,Radiological Control Manager & Rev 1 to PEP-103, Site Emergency Coordinator - Technical Support Ctr.)
- ML18019A587 + (Forwards Revised Plant Emergency Procedures,Including Rev 2 to PEP-223,Radiological Control Manager & Rev 1 to PEP-103, Site Emergency Coordinator - Technical Support Ctr)
- ML18018B766 + (Forwards Revised Plant Emergency Procedures,Per Requirements of 10CFR50,App E.Submittal Also Satisfies Commitment in Sser 1,Section 13.3.2.4(1) for Open Item 12)
- ML18018B767 + (Forwards Revised Plant Emergency Procedures,Per Requirements of 10CFR50,App E.Submittal Also Satisfies Commitment in Sser 1,Section 13.3.2.4(1) for Open Item 12)
- BSEP-90-0708, Forwards Revised Plant Emergency Procedures,Including Rev 28 to PEP-02.1, Initial Emergency Actions & Rev 5 to PEP-02.6.10, Emergency Security Team Leader + (Forwards Revised Plant Emergency Procedures,Including Rev 28 to PEP-02.1, Initial Emergency Actions & Rev 5 to PEP-02.6.10, Emergency Security Team Leader)
- ML20235A636 + (Forwards Revised Plant Inservice Insp & Testing Program,For Review.Nrc Granting of Program Relief Requests Requested. Summary of Key Changes Provided in Encl 1.Fee Paid)
- AECM-87-0155, Forwards Revised Plant Operations Manual Sections,Including Rev 24 to Section 1 to Vol 4 to 04-1-01-M41-1, Sys Operating... & Oversize Rev 19 to Section 1 to Vol 5 to 05-S-01-EP-3, Emergency.... W/Two Oversize Drawings + (Forwards Revised Plant Operations Manual Sections,Including Rev 24 to Section 1 to Vol 4 to 04-1-01-M41-1, Sys Operating... & Oversize Rev 19 to Section 1 to Vol 5 to 05-S-01-EP-3, Emergency.... W/Two Oversize Drawings)