ML19322E370

From kanterella
Jump to navigation Jump to search

Forwards Revised Physical Security Plan,Chapter 8.Encl Withheld (Ref 10CFR2.790)
ML19322E370
Person / Time
Site: Beaver Valley
Issue date: 03/22/1980
From: Dunn C
DUQUESNE LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
References
TAC-10474, NUDOCS 8003270318
Download: ML19322E370 (3)


Text

'Af M

s m co-soco us 3..m ITY'" '

March 22, 1980 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attn:

A. Schwencer, Chief Operating Reactors Branch No. 1 Division of Operating Reactors Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Safeguards Contingency Plan Gentlemen:

Enclosed are five (5) copies of a revised Chapter 8 of the Physical Security Plan for the Beaver Valley Power Station.

Chapter 8 provides the Safeguards Contingency Plan required by 10 CFR 73.40 and Appendix C to Part 73 and has been revised in respJnSe to your Comments dated February 4, 1980.

A listing of these comments and cross references to the pages in Chapter 8 which address them has been included.

The enclosed materials are considered proprietary under the provisions of 10 CFR 2.790(d) and are thereby exempt from public disclosure.

If you have any questions concerning this matter, please contact my office.

Very truly yours, C. N. Dunn Vice President, Operations

Enclosures:

1.

Issue 2, Revision 6, Chapter 8, Beaver Valley Power Station, Physical Security Plan 2.

U.S. NRC Comments on Safeguards Contingency Plan sool S

ll1 9003270 3 '#