. . ..- . . - ~ _ ..

Georgia Fewer Company 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 5264526 Mailing Address:

Fbst Office Box 4545 Atlanta, Georgia 30302 h Georgia Power L T. Gucwa - INsootwc:2cincsystem '

  • Manager Nuclear Safety N and Licensing p ,C

, 'o

I V' ENCLOSURE CONTAINS SAFEGUARDS INFORMATION m [-Z UPON SEPARATION. THIS PAGE IS DECONTROLLED y

o  ? =f SL,2317 OS 1297C ?y W M April 13, 1987 N U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Post Office Box 2203 Atlanta, GA 30301 ATTENTION: Dr. J. Nelson Grace NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDHIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 REVISION OF THE SECURITY PLAN Gentlemen:

Pursuant to the requirements of 10 CFR 50.54(p), Georgia Power Company hereby submits a revision to the Physical Security Plan, including the Contingency Plan and the Training and Qualification Plan, for the E. I. Hatch Nuclear Power Plant. Five copies are enclosed.

This submittal constitutes a complete re-issue of the above documents, which have been reformatted in accordance with the guidelines of NUREG 0908, " Acceptance Criteria for the Evaluation of Nuclear Power Reactor Security Plans", dated August 1982.

The contents of this submittal were discussed in a meeting held February 23, 1987, between members of the GPC security organization and the NRC Region II staff.

In accordance with 10 CFR 50.54(p), we have determined that the ,

enclosed revisions do not constitute a decrease in the safeguards effectiveness of the Plan.

It is our intent to place the revised plan and implementing procedures into effect at Plant Hatch on April 15, 1987.

i 8704290002 870413 1 DR ADOCK 0500 ENCLOSURE CONTAINS SAFEGUARDS INFORMATION 1 UPON SEPARATION. THIS PAGE IS DECONTROLLED 1 5 lo H 11 Vc- hol

'a @ , _ _. _

[

Georgia Power b ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION. THIS PAGE IS DECONTROLLED U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement April 13,1987 Page Two If you have any questions in this regard, please contact this office at any time.

Sincerely, 8M L. T. Gucwa REB /lc Enclosure c: Georcia Power Com_p3ny Mr. J. P. O'Reilly w/o enclosure Mr. J. T. Beckham, Jr. w/o enclosure G0-NORMS w/o enclosure U. S. Nuclear Regulatory Commission Document Control Desk w/ enclosure -

Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch w/o enclosure Mr. L. P. Crocker, Licensing Project Manager - Hatch w/o enclosure ENCLOSURE CONTAINS SAFEGUARDS INFORMATION l UPON SEPARATION. THIS PAGE IS DECONTROLLED l

I 1297C

'""5

-. ._ _ _- . - _ - - _ _ ,_ _. , . - _ .