Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 0CAN058410, Forwards Rev 6 to Industrial Security Plan.Change 15 in Main Text Reduces Number of Armed Response Individuals. Rev Withheld (Ref 10CFR2.790) + (Forwards Rev 6 to Industrial Security Plan.Change 15 in Main Text Reduces Number of Armed Response Individuals. Rev Withheld (Ref 10CFR2.790))
- ML20043C708 + (Forwards Rev 6 to Inservice Testing Program for ASME Class 1,2 & 3 Components, as Committed in Util 890926 Response to Generic Ltr 89-04.Summary Listing of Changes Also Encl)
- ML20154J066 + (Forwards Rev 6 to Inservice Testing Program,Callaway Nuclear Plant & Description of Changes)
- ML20212H701 + (Forwards Rev 6 to Inservice Testing Program for Pumps & Valves, Containing Changes Resulting from Discussions W/Nrc & Additional Program Enhancements.List of Changes & Basis for Each Change Also Encl)
- TXX-6209, Forwards Rev 6 to Interim Physical Security Plan for Protection of Stored SNM of Low Strategic Significance at Comanche Peak Steam Electric Station. Rev Withheld (Ref 10CFR2.790 & 73.21) + (Forwards Rev 6 to Interim Physical Security Plan for Protection of Stored SNM of Low Strategic Significance at Comanche Peak Steam Electric Station. Rev Withheld (Ref 10CFR2.790 & 73.21))
- ML20137A254 + (Forwards Rev 6 to Local Offsite Radiological Emergency Response Plan & Implementing Procedures, Updating Plan to Include Use of Concourse Area at Nassau Coliseum & Relocating One Transfer Point for Review)
- ML20137A258 + (Forwards Rev 6 to Local Offsite Radiological Emergency Response Plan & Implementing Procedures, Updating Plan to Include Use of Concourse Area at Nassau Coliseum & Relocating One Transfer Point for Review)
- ML20101F341 + (Forwards Rev 6 to MCEI-0400-47, McGuire Unit 2 Cycle 10 Colr. Rev Updates RWST Min Contained Borated Water Vol (Level) for LCO 3.1.2.5b & 3.1.2.6b)
- ML20236G736 + (Forwards Rev 6 to MPL-TOP-1A, Operational QA Manual (Oqam). Changes Re Positions & Responsibilities of Manager, Plant Mod & Const,Special Projects & Site Director for Plant Not Included in Rev.Rev Will Be Implemented Upon Approval)
- ML20087M266 + (Forwards Rev 6 to McGuire Unit 1 Pump & Valve Inservice Testing Program & Rev 2 to McGuire Unit 2 Pump & Valve Inservice Testing Program)
- ML20090H458 + (Forwards Rev 6 to Monticello Safeguards Contingency Plan. Rev Withheld)
- ML18038A352 + (Forwards Rev 6 to NMPC-QATR-1, QA Topical Rept for Nine Mile Point Nuclear Station Operations)
- ML17058A736 + (Forwards Rev 6 to NMPC-QATR-1, QA Topical Rept for Nine Mile Point Nuclear Station Operations.)
- ML20196A209 + (Forwards Rev 6 to NRC Plant Restart Assessment Plan.Rev & Future Revs to Plan Will Apply Only to Unit 2)
- ML18106A421 + (Forwards Rev 6 to NRC Restart Action Plan for Salem Units 1 & 2.RAP Originally Published on 980223 to Describe NRC Planned Monitoring Activities for Restart of Salem Units)
- ML20128P081 + (Forwards Rev 6 to NUREG-0325, USNRC Functional Organizational Chart, Per Request.Containment Loads Working Group (Clwg) Final Rept Incomplete.Containment Repts Sent Contain Info Clwg Rept Will Have)
- BSEP-99-0105, Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl + (Forwards Rev 6 to OPEP-02.6, Severe Weather. Summary of Changes Encl)
- LIC-94-0092, Forwards Rev 6 to OPPD-NA-8301-NP,Rev 4 to OPPD-NA-8302-NP, Theoretical Manual & Users Manual for Axial Shape Analyzer..., Rev 6 to OPPD-NA-8301-P & Rev 4 to OPPD-NA-8302-P.OPPD-NA-8301-P & OPPD-NA-8302-P Withheld + (Forwards Rev 6 to OPPD-NA-8301-NP,Rev 4 to OPPD-NA-8302-NP, Theoretical Manual & Users Manual for Axial Shape Analyzer..., Rev 6 to OPPD-NA-8301-P & Rev 4 to OPPD-NA-8302-P.OPPD-NA-8301-P & OPPD-NA-8302-P Withheld)
- ML20214X084 + (Forwards Rev 6 to Offsite Dose Calculation Manual. Responses to Discrepancies Noted in Rev 4 to Manual Provided,Per NRC)
- ML20133G992 + (Forwards Rev 6 to Offsite Dose Calculation Manual. Current Rev to Manual Will Be Submitted W/Next Semiannual Radioactive Effluent Release Rept)
- AECM-85-0327, Forwards Rev 6 to Offsite Dose Calculation Manual. Current Rev to Manual Will Be Submitted W/Next Semiannual Radioactive Effluent Release Rept + (Forwards Rev 6 to Offsite Dose Calculation Manual. Current Rev to Manual Will Be Submitted W/Next Semiannual Radioactive Effluent Release Rept)
- ML20078E735 + (Forwards Rev 6 to Oyster Creek Cycle 15 COLR Topical Rept 066)
- ML20245L149 + (Forwards Rev 6 to PCC-QAPD, QA Program Description)
- VPN-030-99, Forwards Rev 6 to PGE-1061, Trojan Nuclear Plant Decommissioning Plan. Summary of Changes,Attached.Revised Portions Denoted by Side Bars + (Forwards Rev 6 to PGE-1061, Trojan Nuclear Plant Decommissioning Plan. Summary of Changes,Attached.Revised Portions Denoted by Side Bars)
- HBL-93-060, Forwards Rev 6 to Pacific Gas & Electric Co Humboldt Bay Plant Unit 3 - Safstor QA Plan + (Forwards Rev 6 to Pacific Gas & Electric Co Humboldt Bay Plant Unit 3 - Safstor QA Plan)
- ML20059C109 + (Forwards Rev 6 to Physical Security Contingency Plan.Rev Withheld)
- ML20072S556 + (Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790))
- B13023, Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) + (Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790))
- AECM-83-0116, Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790) + (Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790))
- ML20133E897 + (Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- RBG-24340, Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- 3F0592-12, Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21) + (Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21))
- ML20100C270 + (Forwards Rev 6 to Physical Security Plan,Safeguards Contingency Plan & Training & Qualification Plan.(Info Includes Corrections or Clarifications & Organization Changes).Revs Withheld (Ref 10CFR73.21))
- ML20090B142 + (Forwards Rev 6 to Physical Security Plan.Rev Describes Changes Made to Improve Physical Protection Sys at Alternate Access Point & Addresses Other Administrative & Procedural Changes.Rev Withheld Ref (Ref 10CFR73.21))
- ML20101M591 + (Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR2.790(d)(1)))
- ML20195J341 + (Forwards Rev 6 to Physical Security Plan & Rev 5 to Plant Training & Qualification Plan.Encls Withheld (Ref 10CFR73.21 & 2.790(2)(4)))
- L-93-238, Forwards Rev 6 to Physical Security Plan,Including Rept Describing Rev & Copies PTNPSP-3 Through PTNPSP-6.Encls Withheld,Per 10CFR73.21 & 10CFR2.790(a)(3) + (Forwards Rev 6 to Physical Security Plan,Including Rept Describing Rev & Copies PTNPSP-3 Through PTNPSP-6.Encls Withheld,Per 10CFR73.21 & 10CFR2.790(a)(3))
- ML20128K980 + (Forwards Rev 6 to Physical Security Plan,Incorporating Changes Per 10CFR50.54(p) Effected After 850513 & NRC Request.Rev Withheld (Ref 10CFR73.21))
- ML20197J964 + (Forwards Rev 6 to Physical Security Plan,Addressing Physical Security During Interim Construction Period,Which Is Scheduled for Approx 20 Weeks,For Subterraneous Vault for Buried Primary Piping & N-16 Delay Tank.W/O Encl)
- ML20198P790 + (Forwards Rev 6 to Physical Security Plan,Per 10CFR50.4(b)(4) to Meet Requirements of 10CFR50.54(p).Rev 16 Contains Summary of Changes, Detailing Changes Incorporated. Encl Withheld)
- ML20151X659 + (Forwards Rev 6 to Plant Physical Security Plan.Encl Withheld (Ref 10CFR2.790(a)(4)))
- ML20206F196 + (Forwards Rev 6 to Plant Security Plan & Revised Drawings. Encls Withheld (Ref 10CFR73.21))
- ML20090K667 + (Forwards Rev 6 to Plant Security Plan.Rev Withheld)
- ML20057A603 + (Forwards Rev 6 to Procedure WMC-051, Preservation of Assets Program, Reflecting Installation of Two Desiccant Type Dehumidifiers for Controlling Relative Humidity within Reactor Auxiliary/Reactor Bldg Superstructure)
- ML20108B277 + (Forwards Rev 6 to Process Control Program & Rev 5 to ODCM, Reflecting Changes Incorporated as Result of License Amend 72)
- ST-HL-AE-4498, Forwards Rev 6 to Pump & Valve IST Plan, Stp,Unit 1 + (Forwards Rev 6 to Pump & Valve IST Plan, Stp,Unit 1)
- ML20098G455 + (Forwards Rev 6 to Pump & Valve Inservice Testing Program)
- RBG-38-078, Forwards Rev 6 to Pump & Valve Inservice Testing Plan for River Bend Station First 10-Yr Insp Interval + (Forwards Rev 6 to Pump & Valve Inservice Testing Plan for River Bend Station First 10-Yr Insp Interval)
- ML20128D908 + (Forwards Rev 6 to Pump & Valve Inservice Testing Plan for River Bend Station First 10-Yr Insp Interval.)
- W3P88-1261, Forwards Rev 6 to Pump & Valve Inservice Test Plan, Consisting of Five Addl Relief Requests & Enhancements & Additions to Plan.Summary of Changes to Plan Also Encl.Fee Paid + (Forwards Rev 6 to Pump & Valve Inservice Test Plan, Consisting of Five Addl Relief Requests & Enhancements & Additions to Plan.Summary of Changes to Plan Also Encl.Fee Paid)
- ML20236A683 + (Forwards Rev 6 to Pump & Valve Inservice Testing Program Plan for Limerick Generating Station Unit 1. Rev Contains Valve Reclassifications,Test Frequency Assessments,Valve Additions & Editorial Changes)