ML20133E897

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21)
ML20133E897
Person / Time
Site: Callaway 
Issue date: 10/01/1985
From: Farris C
UNION ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
ULNRC-1139, NUDOCS 8510100055
Download: ML20133E897 (1)


Text

5 4s3 UlION ELECTRIC C0FPA!!Y SECURITY IOCUFS:iT FECEIPT FORM TO:

MkO-u,[g)

DATE:

October 1. 1985 ADDRESS: }/W/2.

FROF:

c.

3. Farris/dkm ADDRESS:..Callaway Plant - Document Control

SUBJECT:

ULNRC-1139 TRANS?dTTAL:

(Copy #SP.7.2)

Attached is Revision 6 to the Physical Security Plan under the cover of ULNRC-1139.

Please insert these updates and return the superceded panes to Document Control - c/o Junie Farris.

NOTE:

SAFEGUARDS INFDRMATION - The attached docements contain informat 'oi within the scope of 1C05 73.21 and is not for public disclosure.

Distribt. tion should be restricted on a "need to know" basis.

Do not S

reproduce unless authorized.

Please sign, date, and return this sheet to:

Ga':tyXRXXRMY.PJYMEODc C. J. Farris Sapiw. 1M5KHHYCtfX5G6tiEV7 Supervisor Document Control Union Electric Callaway Plant P.O. Box 620 Fulton, Plssouri 65251 AC(N0'JLEDGEFENT:

I have received the above documents and have read the note concerning the nature of the information contained in them.

I shall control these do'cuments in accordance with 10CFR 73.21, Requirements for the Protec-tion of Safeguards Information.

Signature:

Date:

t Mft308v4 83 p

PDR CA # 316, 08/01/83 omcwxamare