ML20196A209

From kanterella
Jump to navigation Jump to search
Forwards Rev 6 to NRC Plant Restart Assessment Plan.Rev & Future Revs to Plan Will Apply Only to Unit 2
ML20196A209
Person / Time
Site: Millstone 
Issue date: 11/20/1998
From: Lanning W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bowling M, Loftus P
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20196A212 List:
References
NUDOCS 9811270083
Download: ML20196A209 (3)


Text

I November 20, 1998 Mr. M. L. Bowling, Recovery Officer - Techn cal Services e/o Ms. P. A. Loftus, Director - Regulatory Affairs for Millstone Station NORTHEAST NUCLEAR ENERGY COMPANY PO Box 128 Waterford, CT 06385

SUBJECT:

RESTART ASSESSMENT PLAN

Dear Mr. Bowling:

This letter provides Revision 6 to the NRC's Millstone Restart Assessment Plan (RAP).

Revision 5 to the RAP, sent to you in a letter dated September 4,1998, closed out the restart assessment process for Units 1 and 3. This revision and future revisions to the RAP will apply only to Unit 2. Since the issuance of Revision 4 to the RAP on February 17,1998, changes have been made to the Unit 2 Significant items List and Licensing issues Required for Restart of Unit 2. These changes are in Enclosures (1) and (3) to this RAP.. In addition, the MC 0350 Restart Approval Checklist has been revised to eliminate j

' references to the Special Projects Office and to include the Region 1 Regional i

' Administrator. Although this RAP applies only to Unit 2, there are some references to Units 1 and 3 in order to maintain the proper perspective for the restart assessment process.

If you have any questions, please contact Mr. Wayne D. Lanning at 610-337-5126 or j

Mr. Jacque P. Durr at 610-337-5224.

Sincerely, ORIGINAL SIGNED BY:

Wayne D. Lanning, Director Millstone Inspection Directorate Region i

Enclosure:

l As stated Docket No. 50-336 l

1 l

9811270083 981120 d p(t' i

PDR ADOCK 05000336

/

PDR

Mr. M. L. Bowling 2

cc w/ enclosure:

B. Kenyon, President and Chief Executive Officer - Nuclear Group L. Olivier, Senior Vice President & Chief Nuclear Officer M. H. Brothers, Vice President - Operations J. McElwain, Recovery Officer - Millstone Unit 2 i

R. Necci, Vice President - Nuclear Oversight and Regulatory Affairs P. D. Hinnenkamp, Director - Unit 3 -

' J. A. Price, Director - Unit 2 D. Amerine, Vice President - Human Services E. Harkness, Director, Unit 1 Operations J. Althouse, Manager - Nuclear Training Assessment Group F. C. Rothen, Vice President, Work Services t

J.' Cantrell, Director - Nuclear Training (CT)

S. J. Sherman, Audits and Evaluation L. M. Cuoco, Esquire J. R. Egan, Esquire V. Juliano, Waterford Library J. Buckingham, Department of Public Utility Control S. B. Comley, We The People State of Connecticut SLO Designee l

D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN '

S. P. Luxton, Citizens Regulatory Commission (CRC)

Representative T. Concannon E. Woollacott, Co-Chairman, NEAC h

t

+

3 Distribution w/ encl:

NRC Docket Room (with concurrences)

PUBLIC W. Lanning, Director of Inspections, Millstone inspection Directorate, R1 j

M. Kalamon, MID, RI J. Andersen, NRR E. Imbro, Director of ICAVP, NRR S. Dembek, NRR D. Mcdonald, NRR J. Wiggins,. Director, DRS, RI W. Ruland, DRS, Rl M. Modes, DRS, RI E. Kelly, DRS, RI R. Conte, DRS, RI J. White, DRS, RI -

Nuclear Safety Information Center (NSIC)

I Distribution w/encI (VIA E. MAIL):

D. Screnci, PAO B. McCabe, OEDO M. Callahan, OCA R. Correia, NRR Inspection Program Branch (IPAS)

DOCUMENT NAME: G:\\11-98 RAP.NJB To receive a copy of this document, indicate in the box:

"C" = Copy without attachment / enclosure "E" =

Copy with attachment / enclosure "N" = No copy OFFICE MID/ ORA MID/ ORA R1/DRS NRR/ICAVP NRR/

7 E

LICENSING l

NAME NJBLUMBERG,h f~JPDURR D

~ LENICHOLSON EVIMBRO WJDEAN DATE 16//7'/98 k 1(//6198 10/

/98 g

10/

/98 y-10/

/98

-/-

[

OFFICIAL RECORD COPY,

1 y gen

\\

gd mb Maawe i

!