ML20137A254
| ML20137A254 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 01/10/1986 |
| From: | Leonard J LONG ISLAND LIGHTING CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20137A258 | List: |
| References | |
| CON-#186-748 OL, SNRC-1228, NUDOCS 8601140257 | |
| Download: ML20137A254 (2) | |
Text
-c 7
wmmt:uwwwannwwu
,fEg LONG ISLAND LIGHTING COMPANY L w=mmerman, SHOREHAM NUCLEAR POWER STATION P.O. BOX 610, NORTH COUNTRY ROAD e WADING RIVER. N.Y.11792 JOHN O. LEONARD.JR.
VICE prest 0fNT NUCLEAR OPERATIONS January 10, 1986 SNRC-1228 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20SSS Submittal of Revision 6:
Local Offsite Radiological Emergency Response Plan Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322 Dear Mr. Denton.
On May 26, 1983, the Shoreham Nuclear Power Station Local Offsite Radiological Emergency Response Plan was submitted as part of the Atomic Safety and Licensing Board Docket No. 50-322.
Please find attached six sets of the revised pages that make up Revision 6 of the Plan, Procedures and Atpendix A.
to this letter contains the instructions for inserting the revised documents into the Plan and Procedures. is a letter that discusses the changes included in Revision 6.
In summary, none of the operational concepts contained in Revision 5 are affected by the attached Revision 6.
We would like to point out that the two items of which caused the bulk of page changes are the use of the concourse Area in the Nassau Coliseum and the relo-cation of one transfer point.
We ask that you cause a request to be made to FEMA, pursuant to the NRC-FEMA Memorandum of Understanding, for an expedited review of Revision 6.
To this end, we are forwarding under separate cover, consistent with past practice and in conformance to our control copy distribution, a total of ninteen (16) controlled copies of Rev. 6 directly to members of the RAC.
{
Should you have any questions, please contact this office.
k
..; d L J In
. Leonard, Jr.
Vice President-Nuclear Operations cc:
Messrs. J. A. Berry CAD jrc 9601140257 960110 R. Caruso PDR ADOCK 05000322 T. Martin F
pog Holders of the SNPS Local Offsite Attachments Radiological Emergency Response Plan
Attachm:nt I SNRC-1223 REVISION 6 INSERTION INSTRUCTIONS PLAN. APPENDIX A AND PROCEDURES (VOL.
I. II, III)
In order to ensure that all holders of controlled copies of the SNPS Local Offsite Emergency Response Plan have accurate and consistent documents, LILCO is issuing complete copies of all effective pages with this revision.
Replace the materials presently'in your possession in accordance with-the following instructions.
Use the appropriate list of effective pages to ensure proper page location and revision number.
Revision 6 pages should be inserted into the binders in your possession and the pages that Revision 6 replaces destroyed in the following manner:
1.
Plan Revisions Replace List of Effective Pages a.
b.
Replace Page 1.4-2b in Chapter 1 Replace Figure 2.1.1 pp. 1 and 2 in Chapter 2 c.
d.
Replace pp. 3.1-2 in Chapter 3 P.splace pp. 4.2-1 and Figure 4.2.2 in Chapter 4 e.
f.
Replace pp. B-vii in Appendix B 2.
Appendix A Revisions Replace List of Effective Pages a.
b.
Replace appropriate pages starting with IV-74c i
ending with IV-132.
c.
Replace Fig. 20.1.
It is located after Fig. 20 which is after pp. IV-132.
3.
Offsite Implementina Procedures Replace List of Effective Pages a.
Replace appropriate pages starting with OPIP 2.1.1, b.
page 76 of 79, ending with OPIP 4.7.1 page 16 of 45.