Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20041G504 + (Forwards Program Plan for Ofc for Analysis & Evaluation of Observational Data as Background for 820316 Commission Meeting.Program Plan Summarizes Principal Program & Technical Activities)
- ML19329G310 + (Forwards Program Plan for Performance Testing of PWR Safety & Relief Valves, Revision 1,addressing NUREG-0578 Requirement 2.1.2)
- ML20205R416 + (Forwards Program Plan for Replacement Items Project Re Procurement Deficiencies Identified in Nuclear Safety Review Staff Repts R-84-17-NPS,I-83-13-NPS & R-85-07-NPS & Insp Repts 50-327/86-81 & 50-328/86-81)
- ML20044B599 + (Forwards Program Plan for Review,Evaluation & Updating Criticality Safety Analyses,Per Violations Noted in Insp Rept 70-1257/92-06.Plan Expands & Refines Preliminary Approach as Presented to NRC on 920922 in Walnut Creek,Ca)
- ML20215J667 + (Forwards Program Plan to Resolve Use of Commercial Quality Fasteners in ANSI B31.7 Class 1 & 2 Sys at Plant.Fasteners Will Make Up Majority of All Parts Involved Based on Preliminary Results)
- ML20002A596 + (Forwards Program Plan,Human Factors Engineering Evaluation & Improvement of Virgil C Summer Station Control Room)
- ML20002A597 + (Forwards Program Plan,Human Factors Engineering Evaluation & Improvement of Virgil C Summer Station Control Room.)
- ML18033A794 + (Forwards Program Re Seismic Qualification of Instrumentation Tubing,Per 890105 Seismic Programs Overview Meeting. Significant Condition Repts Written to Address Insufficient Documentation for Tubing Installations)
- ML20210L252 + (Forwards Program Rev 2 to TR MPR-1807, Joint BWR, Westinghouse & CEOG Program on MOV Periodic Verification. Program Provided for Review & Acceptance Under NRC Licensing & Acceptable Response to GL 96-05)
- ML19338D176 + (Forwards Program Technical Performance rept,800206-0630,per Umtrca Grant to State of Tx)
- ML17054B537 + (Forwards Program for Completion of Engineering Assurance In-Depth Technical Audits,Nine Mile Point 2 Project & Overall Audit Plan for RCIC Sys & Associated Structures,In Response to Questions from 850227 & 0315 Meetings)
- ML17054B538 + (Forwards Program for Completion of Engineering Assurance In-Depth Technical Audits,Nine Mile Point 2 Project & Overall Audit Plan for RCIC Sys & Associated Structures,In Response to Questions from 850227 & 0315 Meetings)
- ST-HL-AE-2025, Forwards Program for Control of Welded Attachments in Sys Where Arbitrary Intermediate Pipe Breaks Eliminated,Per 870331 Discussion.Info & Commitments Adequate to Resolve Staff 870227 Request for Addl Info + (Forwards Program for Control of Welded Attachments in Sys Where Arbitrary Intermediate Pipe Breaks Eliminated,Per 870331 Discussion.Info & Commitments Adequate to Resolve Staff 870227 Request for Addl Info)
- ML20091H310 + (Forwards Program for Detection,Prevention & Control of Corbicula Around safety-related Sys,In Response to IE Bulletin 81-03.Local Conditions Warrant Sampling Less Frequently than Quarterly)
- ML20155A001 + (Forwards Program for Independent Design & Const Assessment of Limerick Unit 2, for Review & Approval.Submittal Provides Addl Details of Program Per 880524 Discussion W/ Nrc.Understands That NRC Will Monitor Assessment Process)
- ML13329A098 + (Forwards Program for Initiating Seismic re-evaluation of Balance of Plant Structures & Equipment. Development of Instrumental Response Spectra W/Equal Probability of Exceedance for SONGS Unit I, Encl)
- ML19312B956 + (Forwards Program for Insertion of Zirconium Oxide Spacers in Unit 1 Batch,4 W/Items Circled Which B&W Considers Proprietary (Ref 10CFR2790) in Response to 740723 Request. W/O Encl)
- ML20091M307 + (Forwards Program for Insp of Recirculation & Other Coolant Boundary Stainless Steel Piping Sys for 1984 Maint/Refueling Outage.Criteria Consistent W/Generic Ltr 84-11, Insp of BWR Stainless Steel Piping. Outage Scheduled for 840901)
- ML20037B652 + (Forwards Program for Offsite Senior Operators to Maintain Capability to Perform Functions of Licensed Operators & Senior Operators in Case of Special Need)
- ML20040D998 + (Forwards Program for Power Ascension at Unit 1.Program Assures That No Tube Damage Beyond Tech Spec Limit of 40% Would Be Expected)
- ML112991150 + (Forwards Program for Recirculation Piping Replacement at Monticello Nuclear Generating Plant, Per Amend 14 to License DPR-22.Proposed Tech Spec Changes Re Removal of Piping Line Will Be Submitted by 831001)
- ML20052B755 + (Forwards Program for Replacement of Inconel Sheathed Heaters W/Heaters Equipped W/Austenitic Stainless Steel Type 316 Sheaths)
- ML20077A313 + (Forwards Program for Resolving Conduit & Conduit Supports Issue Prior to Restart of Units 1 & 3 for Info,Per)
- ML18033A161 + (Forwards Program for Resolving Issue of Seismic Qualification of Miscellaneous Steel & Interim Operability Criteria for Miscellaneous Steel,For Review)
- ML18033A162 + (Forwards Program for Resolving Issue of Seismic Qualification of Miscellaneous Steel & Interim Operability Criteria for Miscellaneous Steel,For Review)
- ML20207A400 + (Forwards Program for Upcoming Forum,Per 870320 Telcon)
- ML20093M350 + (Forwards Program for Verifying Existing Calculations Correlating Rock River Water Level & Flow at Facility Screenhouse,Per Commitment Made During Review of Tech Specs for UHS Monitoring Devices)
- ML13330B122 + (Forwards Program to Address SEP Topic II-1.C, Offsite Hazards & TMI Action Plan Item III.D.3.4, Control Room Habitability, Per 860629 Commitment.Info Supercedes 860328 Transmittal & Revises 830314 Commitments.Related Info Encl)
- B11386, Forwards Program to Determine Capability of Millstone 3 Power Plant to Withstand Seismic Excitation.., Per SER (NUREG-1031) Confirmatory Item 1 & Bj Youngblood 840815 Request.Conclusions of Study Listed.W/O Encl + (Forwards Program to Determine Capability of Millstone 3 Power Plant to Withstand Seismic Excitation.., Per SER (NUREG-1031) Confirmatory Item 1 & Bj Youngblood 840815 Request.Conclusions of Study Listed.W/O Encl)
- ML20054H603 + (Forwards Program to Establish Seismic Safety Margins Using Revised Criteria & Analytical Methods)
- W3P85-0464, Forwards Program to Perform Confirmatory Analyses,Nuclear Plant Island Structure Basemat, Concerning Cracking of Basemat.Program Plan Incorporates NRC Comments from 850213 Meeting + (Forwards Program to Perform Confirmatory Analyses,Nuclear Plant Island Structure Basemat, Concerning Cracking of Basemat.Program Plan Incorporates NRC Comments from 850213 Meeting)
- ML20138F761 + (Forwards Program to Perform Independent Verification of Poison Tube Loading for Tubes Loaded by Nuclear Energy Svcs, Inc.Util Inquiring Into Problems Re Proper Loading.Results Will Be Provided in Future Ltr)
- ML20132C359 + (Forwards Program to Sample,Analyze & Trend Lubricating Oil in Diesel Generators,Per 850314 Commitment.Info Re Industry Design Review of Air Boost Prelubrication Sys & Diesel Generator Slow Start Design Mod Also Encl)
- ML20140B661 + (Forwards Programmatic & Specific Info to Technical Evaluation Rept Action Items Identified in Suppl 1 to Dcrdr Summary Rept,Per 860123 Meeting.Corrections Should Be Completed within Next Two Refuelings)
- ML20207E880 + (Forwards Programmatic EIS for TMI-2 & Suppls 2 & 3.W/o Encls)
- ML20206C112 + (Forwards Programmatic Milestones & Schedule Commitments Re IE Bulletins 79-14 & 79-02)
- ML18192A187 + (Forwards Programs for Construction-Phase Groundwater and Ecological Monitoring as Required for Final Environmental Statement Related to Construction)
- ML20092P674 + (Forwards Programs,Plans & Schedules Re Generic Ltr 83-28, Generic Implications of Salem ATWS Events. Procedure for post-trip Evaluation Encl)
- ML20155G801 + (Forwards Progress Report on Sacred Heart Hosp in Response to 981014 Telcon.Physician Responses Have Been Labeled Confidential & Will Be Kept Secured by State of Maryland)
- ML20127M524 + (Forwards Progress Rept - Primary Confinement Barrier Integrity Review of Vitrification Facility, in Response to NRC Comments on West Valley Demonstration Project (WVDP) Seismic & Tornado Analysis for Vitrification Facility)
- ML20213A247 + (Forwards Progress Rept 1-GKSS Addressing Progress in Establishing Liaison w/GKSS-DAS Containment Research Activity.Results of First Trip to Geesthacht Quite Positive)
- ML19261E703 + (Forwards Progress Rept 22 for Jul 1979)
- ML19331D149 + (Forwards Progress Rept 3 for Work Related to IE Bulletin 80-06.Drawing Review Completed for HPCI & Reactor Coolant Isolation Cooling Sys)
- ML19347A919 + (Forwards Progress Rept 4 for IE Bulletin 80-06 Re Engineered Safety Features Reset Controls)
- ML19339A500 + (Forwards Progress Rept 5 Re IE Bulletin 80-06, Engineered Safety Feature (ESF) Reset Controls. Rept Reflects Work Progress Since Util)
- ML20202B418 + (Forwards Progress Rept 6, Evacuation Plan Update for Seabrook Station. Rept Provides Addl/Revised Info Re Radiological Emergency Response Plans for State of Nh & Affected Communities)
- ML20004C651 + (Forwards Progress Rept Apr 1980-Mar 1981)
- ML20004C652 + (Forwards Progress Rept Apr 1980-Mar 1981.)
- ML19344D989 + (Forwards Progress Rept Re BWR Stability Analysis for Period June-Jul 1980.New PT1 & PT4 Performed & Currently Under Analysis)
- ML20006F162 + (Forwards Progress Rept Re Implementation of Control Room Enhancements as of End of Seventh Refueling Outage,Per NUREG-0737.Rept Delayed to Allow for Independent Verification of Control Room Enhancement Status)
- ML13333A352 + (Forwards Progress Rept Re NRC Concerns W/Earthquake Ground Motion Simulations for San Onofre Unit 1. Util & Consultant Can Meet W/Nrc During Week of 790409-13,after Which Results of Addl Studies Will Be Submitted Formally)