Forwards Program for Insp of Recirculation & Other Coolant Boundary Stainless Steel Piping Sys for 1984 Maint/Refueling Outage.Criteria Consistent W/Generic Ltr 84-11, Insp of BWR Stainless Steel Piping. Outage Scheduled for 840901
ML20091M307
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 05/31/1984
From: Gucwa L
GEORGIA POWER CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20091M315 List:
References
GL-84-11, NED-84-280, TAC-55236, NUDOCS 8406110236
Download: ML20091M307 (1)


Text

__ _ . _ _ _ . _ ._ _ _ _ _

' Georea Power Cynpa y 333 Piedmont Avenue Atlanta, GJorgia 30308 Telephone 404 5264526 Marling Address-l Post Off ce Box 4545 l

- Atlanta, Georgia 20302 Georgia Power L T. Gucwa the SOuthem eleCfDC System

- Manager Nuchar Engineenng and Chief Nue: ear Engineer NED-84-280

.May 31, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, dilef Operating Reactors Branch No. 4 Division _of Licensing U. S. ' Nuclear Regulatory Commission Washington, D. C. 20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 ENIN I. HMCH NUCLEAR PIANT UNIT 1 INSPECTIN PROGRAM - 1984 REPUELING OUTAGE Gentlemen:

Pursuant to the requirenents of your February 11, 1983 lettar, Georgia Power Canpany hereby sutnits for your review and approval the enclosed progran for the inspection of the recirculation and other reactor coolant boundary stainless steel piping systecs' for the 1984 maintenance / refueling outage, three (3) months prior to the start of the outage. Seven (7) ccpies of the proposed progran cce enclosed for your convenience.

%e inspection pro 3ran includes our criteria for weld selection, ultrasonic examination, flaw exanination, and weld joint ' overlays. These criteria are consistent with 'the intent of NRC Generic Letter 11,  ;

" Inspection of IER Stainless Steel Piping," dated April 19, 19S4, Enclosure 1 also includes our justificaticn for the adayuacy of weld '

i overlays for a secorv3 cycle of operation.

We Hatch Unit 1 maintenance / refueling outage is tentatively _ scheduled to begin September 1,!1984. Because of the extensive pre-outage manpower planning associated with this effort, any questions regarding the enc 1ceed'

progran should be brought to our attention at your earliest convenience.

Should it be decided after. sulaittal of the enclosed progran that the i subject stainless steel piping systens will be replaced in lieu of inspection, Georgia Power Company will notify you accordingly.

Sincerely yours, K 0$00 & Ns foi a L. T. ha i JAR /inb