MONTHYEARML20076E0951983-08-12012 August 1983 Forwards Revised Inservice Insp Program.Upgraded Program Will Go Into Effect on 840101 Project stage: Other ML20091M3201984-05-31031 May 1984 Recirculation,Rhr & Reactor Water Cleanup Weld Joint Insp Program - 1984 Maint/Refueling Outage Project stage: Other ML20091M3071984-05-31031 May 1984 Forwards Program for Insp of Recirculation & Other Coolant Boundary Stainless Steel Piping Sys for 1984 Maint/Refueling Outage.Criteria Consistent W/Generic Ltr 84-11, Insp of BWR Stainless Steel Piping. Outage Scheduled for 840901 Project stage: Other ML20094B6211984-07-27027 July 1984 Forwards Discussion of Exams Conducted on Six Inlet & Outlet Nozzles & safe-end & Recirculation Sys Jet Pump Instrumentation Inconel 182 Nozzles.Exams Prompted by Cracking Problems Discussed in IE Info Notice 84-41 Project stage: Other ML20098C8121984-09-19019 September 1984 Requests Info Re Status of 1984 Refueling Outage Insp Program Approval & Issuance of SER for Second Cycle Operation W/Weld Overlays.Maint/Refueling Outage Tentatively Scheduled to Begin on or About 840929 Project stage: Other ML20098F0701984-09-26026 September 1984 Responds to 840917 Request for Addl Info Re 1984 Refueling Outage Insp Program for Stainless Steel Piping.Topics Addressed Include Sampling Plan,Qualification of Exam Personnel,Leak Detection & Leakage Limits Project stage: Request ML20101C6571984-11-21021 November 1984 Responds to IE Bulletin 80-13, Cracking in Core Spray Spargers. Visual Insp of Core Spray Spargers & Associated Piping Performed.Circumferential Crack Discovered in heat- Affected Zone of Lower Sparger to T-box Weld Project stage: Other ML20108E1261984-11-30030 November 1984 Core Spray Sparger Crack Analysis for Ei Hatch Nuclear Power Station,Unit 1 Project stage: Other ML20108E1231984-12-0606 December 1984 Forwards NEDO-30825, Core Spray Sparger Crack Analysis for Ei Hatch Nuclear Power Station,Unit 1, in Response to IE Bulletin 80-13, Cracking in Core Spray Spargers Project stage: Other ML20100M5261984-12-10010 December 1984 Forwards Inservice Insp Rept Re Stainless Steel Piping & Corrective Actions Taken for Cracked Welds Reported During Fall 1984.Insp Performed During 1984 Refueling Outage Project stage: Other ML20101E3541984-12-19019 December 1984 Submits Addl Info on IGSCC Evaluations of Repairs to Welds in Recirculation Sys Piping,Per 841217 Telcon Request. Summary of Total Stresses Encl Project stage: Other ML20101L4521984-12-21021 December 1984 Advises of Intent to Submit Rept During Second Quarter 1985 Re Recirculation Sys Piping Replacement During 1984 Maint/ Refueling Outage Project stage: Other ML20112G1551985-01-0909 January 1985 Informs That Hydrostatic Test Cannot Be Performed as Indicated in 841210 Submittal.Required Removal of Main Steam Safety/Relief Valves from Svc Would Violate Tech Specs Requiring Valves to Be Operable W/Irradiated Fuel in Vessel Project stage: Other ML20132C5581985-05-17017 May 1985 Rev 0 to Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1 Project stage: Other ML20132C5191985-09-17017 September 1985 Forwards Rev 0 to XGP-09-106, Design Rept for Evaluation & Disposition of IGSCC Flaws at Plant Ei Hatch Unit 1, to Complete All Necessary Submittals to NRC Re Piping Insps & Repairs During 1984 Maint/Refueling Outage Project stage: Other 1984-12-06
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
__
' Georea Power Cynpa y 333 Piedmont Avenue Atlanta, GJorgia 30308 Telephone 404 5264526 Marling Address-Post Off ce Box 4545 l
- Atlanta, Georgia 20302 Georgia Power L T. Gucwa the SOuthem eleCfDC System
- Manager Nuchar Engineenng and Chief Nue: ear Engineer NED-84-280
.May 31, 1984 Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz, dilef Operating Reactors Branch No. 4 Division _of Licensing U. S. ' Nuclear Regulatory Commission Washington, D. C.
20555 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 ENIN I. HMCH NUCLEAR PIANT UNIT 1 INSPECTIN PROGRAM - 1984 REPUELING OUTAGE Gentlemen:
Pursuant to the requirenents of your February 11, 1983 lettar, Georgia Power Canpany hereby sutnits for your review and approval the enclosed progran for the inspection of the recirculation and other reactor coolant boundary stainless steel piping systecs' for the 1984 maintenance / refueling outage, three (3) months prior to the start of the outage. Seven (7) ccpies of the proposed progran cce enclosed for your convenience.
%e inspection pro 3ran includes our criteria for weld selection, ultrasonic examination, flaw exanination, and weld joint ' overlays.
These criteria are consistent with 'the intent of NRC Generic Letter 11,
" Inspection of IER Stainless Steel Piping," dated April 19, 19S4, also includes our justificaticn for the adayuacy of weld i
overlays for a secorv3 cycle of operation.
We Hatch Unit 1 maintenance / refueling outage is tentatively _ scheduled to begin September 1,!1984.
Because of the extensive pre-outage manpower planning associated with this effort, any questions regarding the enc 1ceed' progran should be brought to our attention at your earliest convenience.
Should it be decided after. sulaittal of the enclosed progran that the i
subject stainless steel piping systens will be replaced in lieu of inspection, Georgia Power Company will notify you accordingly.
Sincerely yours, K 0$00 & a Ns foi L. T. ha JAR /inb
' Enclosure xc:
J. T. Beckham, Jr.
[g I
N.' C. Nix, Jr.
1J..-P. 'O'Reilly (NAC. Region II) h.5
'l