ML112991150

From kanterella
Jump to navigation Jump to search
Forwards Program for Recirculation Piping Replacement at Monticello Nuclear Generating Plant, Per Amend 14 to License DPR-22.Proposed Tech Spec Changes Re Removal of Piping Line Will Be Submitted by 831001
ML112991150
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 07/29/1983
From: Musolf D
Northern States Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML112991151 List:
References
NUDOCS 8308040378
Download: ML112991150 (2)


Text

REGULATU 161NFORMATION DISTRIBUTION *TEM (RIDS)

ACCESSION NBR:8308040376 DUCDATE: 83/07/29 NOTARIZED: NO FACIL:50-263 Monticello Nuclear Generating Plant, Northern States AUTH,NAME AUTHOR AFFILIATION

MUSOLFrD, Northern States Power Co, RECIP.NAME RECIPIENT AFFILIATION Office of Nuclear Reactor Regulation, Director DOCKET #

05000263

SUBJECT:

Forwards "Program for Recirculation Piping Replacement at Monticello Nuclear Generating Plant," per Amend 14 to License DPR-22.Proposed Tech Spec changes re removal

,f piping line will be submitted by 831001,,48 DISTRIBUTION CODE: A001S COPIES RECEIVED:LTR ENCL TITLE: OR Submittal: General Distribution NOTES:

RECIPIENT ID CODE/NAME NRR ORB2 BC 01 INTERNAL: ELD/HDS1 NRR/OL DIR REG FILE-L 04 EXTERNAL: ACRS NRC POR NTIS

&oo COPIES LTTR ENCL 7

7 1

1 1

1 t) 1 09 02 0

1 1

1 6

1 RECIPIENT ID CODE/NAME NRR/DE/MTE8 NRR/DL/ORAB NRR/DSI/RAB RGN3 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 0

1 1

1 03 05 1

1 1

1 1

1 TOTAL NUMBER OF COPIES REQUIRED: LTTR 8 C,,00 25 ENCL 23 1

-1,1 A

Fit, tv N9

Northern States Power Company 414 Nicollet Mail Minneapolis, Minnesota 55401 Telephone (612) 330-5500 July 29, 1983 Director Office of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Program for Replacement of Reactor Recirculation System Piping Amendment Number 14 to the Monticello Operating License dated December 10, 1982 requires that Northern States Power Company submit, prior to August 1, 1983, a program for inspection and/or modification of the reactor recirculation system piping at the Monticello Nuclear Generating Plant.

The purpose of this letter is to transmit, for the Commission's review and approval, a description of our modification program as required by Amendment 14.

We are currently working with our Project Manager in the Division of Licensing to schedule a meeting with the NRC Staff to discuss the attached report and answer any questions related to our program.

The modifications described in the attached report will be completed prior to plant startup for cycle 11.

As noted in our report, the recirculation loop cross tie line will be removed as part of this project.

Proposed Technical Specification changes reflecting the removal of this line will be submitted prior to October 1, 1983.

David Musolf Manager-Nuclear Support Se vices DMM/js cc:

Regional Administrator-III NRR Project Manager, NRC Resident Inspector, NRC G Charnoff Attachment 8308040378 830729 PDR ADOCK 05000263 P

PDR