Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-83-554, Forwards Procedures to Support Util Actions Re Generic Ltr 83-28 on Generic Implications of Salem ATWS Events + (Forwards Procedures to Support Util Actions Re Generic Ltr 83-28 on Generic Implications of Salem ATWS Events)
- ML20080S943 + (Forwards Procedures, Diesel Electric Generating Units & Extended Operation Test of Diesel Generator 1A, in Response to 831230 Request.Procurement,Qa & Operational Experience W/Diesel Generators 1A & 1B Discussed)
- ML19305B434 + (Forwards Procedures,Including Organization During Emergency Conditions,Qc Surveillance of Shift Relief & Conduct,Summary of Revisions to Station Organization,Instrument Calibr & Valve Position Indication Sensitivity)
- ML19305B435 + (Forwards Procedures,Including Organization During Emergency Conditions,Qc Surveillance of Shift Relief & Conduct,Summary of Revisions to Station Organization,Instrument Calibr & Valve Position Indication Sensitivity)
- ML20151G213 + (Forwards Proceedings from 871104-06 1987 CEO Conference, Evaluating Progress. in Atlanta,Ga)
- ML20056E620 + (Forwards Proceedings of 1993 NRC Info Conference,Highlights Providing Brief Summary of Results of Conference & Speeches Presented.W/O Encl)
- ML19310A633 + (Forwards Proceedings of 800220-21 Meeting on Low Level Radwaste.Proposes to Send Copy to State & Federal Representatives & Industrial Participants to Solicit Recommendations)
- ML20214W831 + (Forwards Proceedings of Intl Decommissioning Planning 850716-18 Conference.W/O Encl)
- ML20199G830 + (Forwards Proceedings of Oecs/Csni Specialists Meeting on Fuel-Coolant Interactions Parts 1 & 2 Held on 970519-21 in Tokai-Mura,Japan)
- ML20028H822 + (Forwards Process Control Div Organizational Charts,Per Section 17.1.1 of WCAP-8370/7800,Rev 11A/7A, Energy Sys Business Unit/Nuclear Fuel Business Unit QA Plan)
- ML19262C551 + (Forwards Process Control Plan for Ecopac Solidification Sys. Anefco,Inc Will Use Sys Under Contract at Facility)
- ML19262C552 + (Forwards Process Control Plan for Ecopac Solidification Sys. Anefco,Inc Will Use Sys Under Contract at Facility)
- RBG-19-844, Forwards Process Control Program & Offsite Dose Calculation Manual for Review + (Forwards Process Control Program & Offsite Dose Calculation Manual for Review)
- ML20126F229 + (Forwards Process Control Program Covering Solidification &/Or Dewatering Using NUS Supplied Temporary Processing & Solidification Sys & Solidification Using Permanently Installed Asphalt Extruder/Evaporator)
- ML20039G567 + (Forwards Process Control Program Description for Radwaste Solidification Sys)
- TXX-4391, Forwards Process Control Program for Comanche Peak Steam Electric Station. Revised FSAR Section 11.4 to Amend 54 Also Encl + (Forwards Process Control Program for Comanche Peak Steam Electric Station. Revised FSAR Section 11.4 to Amend 54 Also Encl)
- ML20071D053 + (Forwards Process Control Program for Midland Nuclear Cogeneration Plant)
- ML19321A134 + (Forwards Process Control Program for Radwaste Solidification Unit,As Discussed at 800709 Meeting W/Nrc)
- ML19321A135 + (Forwards Process Control Program for Radwaste Solidification Unit,As Discussed at 800709 Meeting W/Nrc)
- ML20054M209 + (Forwards Process Control Program for Radioactive Solid Waste Sys.Solidification Sys Mfg by Atcor.Identification Number for Some Plant Operating Procedures Will Be Provided in Future Submittal)
- ML19340C774 + (Forwards Process Control Program for Sample Collection Analysis & Test Solidification Using Cement, FNP-0-RCP-800, App A,Per Section 2.C.8 of License NPF-8)
- ML19340C775 + (Forwards Process Control Program for Sample Collection Analysis & Test Solidification Using Cement, FNP-0-RCP-800, App A,Per Section 2.C.8 of License NPF-8)
- ML20062N771 + (Forwards Process Control Program for Solidification of Radwaste from Liquid Sys. & Proprietary Pages to Radwaste Solidification Sys. Encls Withheld (Ref 10CFR2.790))
- ML19259C234 + (Forwards Process Control Program for Waste Solidification & Offsite Dose Calculation Manual)
- ML19259C235 + (Forwards Process Control Program for Waste Solidification & Offsite Dose Calculation Manual)
- ML20082Q349 + (Forwards Process Control Program to Fulfill Requirements of Tech Spec 3/4.11.3 & Proprietary Solidification Formulas Not Included in Program Until plant-specific Concentrate Samples Analyzed.Formulas Withheld (Ref 10CFR2.790))
- ML17249A722 + (Forwards Process Control Program, Revision 0)
- ML17249A723 + (Forwards Process Control Program, Revision 0)
- ML19331D155 + (Forwards Process Control Program, Revision 1,updating 800521 Submittal)
- ML19331D156 + (Forwards Process Control Program, Revision 1,updating 800521 Submittal)
- ML20101G575 + (Forwards Process Description for Advanced BWR App 18F Re Analysis of Operator Control & Info Needs)
- ML19263D410 + (Forwards Process Flow Diagram & Description of Proposed Process for Evaluation Re Lagoon U Recovery)
- ML20069B058 + (Forwards Process Specs for Induction Heating Stress Improvement Technique in Response to Generic Ltr 81-04. Specs Withheld (Ref 10CFR2.790))
- FVY-84-135, Forwards Process for Translating Generic Technical Guidelines Into Plant Specifics,In Response to NRC .Info Will Be Incorporated in Rev to Procedures Generation Package to Be Issued in Jan 1985 + (Forwards Process for Translating Generic Technical Guidelines Into Plant Specifics,In Response to NRC .Info Will Be Incorporated in Rev to Procedures Generation Package to Be Issued in Jan 1985)
- L-82-143, Forwards Processed Marine Seismic Reflection Lines.Lines Developed from Data Collected During Jul 1981 Seismic Reflection Survey + (Forwards Processed Marine Seismic Reflection Lines.Lines Developed from Data Collected During Jul 1981 Seismic Reflection Survey)
- ML19241B056 + (Forwards Procurement Bid Response & Manufacturer Drawings Re Containment Ventilation Dampers)
- ML20245G181 + (Forwards Procurement Engineering Assessment Plan Final Rept, Confirming That Reasonable Level of Confidence Exists That Safety Function of Installed Equipment Had Not Been Adversely Impacted by Past Procurement Practices)
- ML20147C347 + (Forwards Procurement Engineering Assessment Plan,Interim Rept. Rept Addresses Issues Raised by NRC Procurement Insps of 880104-14 & 0210-12)
- ML20147C352 + (Forwards Procurement Engineering Assessment Plan,Interim Rept. Rept Addresses Issues Raised by NRC Procurement Insps of 880104-14 & 0210-12)
- ML20079J091 + (Forwards Procurement Recovery Plan,Indicating Method by Which Util Will Correct Inadequacies Identified in 820318 Stop Work Action.Procedures Implementing Plan Will Be Available for Insp.Review & Concurrence Requested)
- ML13319A855 + (Forwards Product Defect Notification to ABB Power T&D Co,Inc Nuclear Distribution List on 950921)
- ML19276F884 + (Forwards Product Promotional Info for Iron Oxide Mortar to Be Used as fail-safe Passive Heat Sink for Reactors.If Each Plant Can Contain Worst Possible Accident,Antinuclear Forces Will Be Rendered Ineffective)
- ML19276F031 + (Forwards Production Procedure KM-NP-31-6, Glove & Bag Changing, & Updated Sections of Facility Emergency Manual Re Procedures to Follow in Event of Accidental Criticality)
- ML20071P273 + (Forwards Prof Qualification Statements for UCLA Witnesses at Upcoming Safety Hearing.Other Statements Will Be Sent When Received.W/O Encl)
- ML20248F955 + (Forwards Prof Qualification Statements of NRC Witnesses Ma Lamastra & ED Flack,Per NRC 890317 Witness List)
- ML20247F597 + (Forwards Prof Qualifications Statement of NRC Witness Hb Griffin,Not Available at NRC 890425 Filing of Testimony)
- ML20083F579 + (Forwards Prof Qualifications Statements for All non-Coffey County Witnesses for Testimony on Emergency Evacuation Plan Issues)
- ML19270G137 + (Forwards Prof Qualifications of Applicant Witness Panel in Upcoming Early Site Review Hearing)
- ML19241B112 + (Forwards Prof Qualifications of G Laroche,F Kantor,L Soffer, P Sobel & ML Karlowicz)
- ML20091A871 + (Forwards Prof Qualifications of GL Hofman,Testifying in Response to Committee to Bridge the Gap Hearsay Objection to Answer 8 of UCLA Rebuttal.Related Correspondence)
- ML20052D101 + (Forwards Prof Qualifications of Individuals Who Will Respond to Questions on 820506)
- ML16340A958 + (Forwards Prof Qualifications of NRC Witnesses GE Gaskin,Jr Miller,Fg Pagano,Dg Rose,R Haarmon,Rb Manili & MD Schuster, Listed in NRC to Aslab)