ML19340C774

From kanterella
Jump to navigation Jump to search
Forwards Process Control Program for Sample Collection Analysis & Test Solidification Using Cement, FNP-0-RCP-800, App A,Per Section 2.C.8 of License NPF-8
ML19340C774
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/03/1980
From: Clayton F
ALABAMA POWER CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML19340C775 List:
References
NUDOCS 8012170409
Download: ML19340C774 (1)


Text

/,labsm3 Powir Company 600 North 16th Street Post Offica Box 2641 Birmingham. Alabama 35291 Teiechore 205 250-1000 m

F. L. CLAYTON. JR.

senior Vice President Alabama Power rv seen euc us:en December 3, 1980 Docket No. 50-364 Director, Nuclear Reactor Regulation-V. S. Nuclear Regulatory Commission Phillips Building, Room 116 7920 Norfolk Avenue Bethesda, Maryland 20014 Attention:

Mr. A. Schwencer JOSEPH M. FARLEY NUCLEAR PLANT - UNIT 2 PROCESS CONTROL PROGRAM Gentlemen:

As required by Section 2.C.8 of the Joseph M. Farley Plant -

Unit 2 License No. NPF-8, Alabama Power Company submits the enclosed final process control program for NRC review. After final NRC approval, Alabama Power Company will utilize equipment and process solid wastes in accordalice with the approved program.

Yours very truly, f-..

F. L. Clayton, Jr.

BDM:rt Enclosure cc:

Mr. R. A. Thomas w/ enclosure Mr. G. F. Trowbridge w/ enclosure Mr. L. L. Kintner w/ enclosure Mr. W. H. Bradford w/ enclosure po l o

il s 'i

'jgp 8012170

.