Forwards Process Specs for Induction Heating Stress Improvement Technique in Response to Generic Ltr 81-04. Specs Withheld (Ref 10CFR2.790)
ML20069B058
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/09/1983
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML19344B751 List:
References
GL-81-04, GL-81-4, NUDOCS 8303160434
Download: ML20069B058 (3)


Text

\\

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (2151841-4000 March 9, 1983 Docket Nos. 50-277 50-278 Mr. John F. Stolz, Chief operating Reactors Branch 44 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Stolz:

In your letter to Mr. E. G.

Bauer, Jr., dated November 1,

1982, you requested additional information concerning Philadelphia Electric Company's response to Generic Letter 81-04.

On December 3, 1982, the additional information you requested was submitted.

In the submittal, the licensee committed to provide a copy of the process specifications for the Induction Heating Stress Improvement (IHSI) technique to be used on Peach Bottom 2 and 3.

This letter carries out that commitment.

Enclosed is a copy of the IHSI procedures and specifications that are to be used during the present Peach Bottom Unit 3 refueling outage.

The procedures and specifications contain information which General Electric Company customarily maintains in confidence and withholds from public disclosure.

The information has been handled and classified as proprietary to General Electric, and we hereby request that these specifications be withheld from public disclosure in accordance with the provisions of 10 CFR 2.790.

In accordance with a telephone coversation on March 8, 1983, between Martin Ryan, Philadelpia Electric Company and R. J. Benich, Service Project Manager, Northeast Region, General Electric Company, the licensee has been authorized to release these proceduree to the NRC in this manner.

In your letter to Mr. E. G. Bauer, Jr., dated November 1, 1992, you have requested that we send a copy of our response to EG&G Idaho, Inc.

The licensee also has been informed by R. J.

Benich, that EG&G Idaho, Inc., and General Etectric Company have entered into a proprietary information agreement effective December 8, 1982.

We trust that EG&G Idaho, Inc. will maintain this proprietary agreement.

8303160434 830309 0\\

PDR ADOCK 05000277 I L P

PDR 1\\

~

John F.

Stolz, Chief Page 2

A listing of the attached IHSI procedures and specifications are as follows:

Procedure No.

Title 1)

PB IHSI 1.0 General Procedure - Cable and Hose Runs 2)

PB IHSI 2.0 Thermocouple Attachment 3)

PB IHSI 3.0 Coil Installation and Handling 4)

PB IHSI 4.0 IHST Equipment Preoperational Checkout 5)

PB IHSI 5.0 Equipment Installation 6)

PB IHSI 6.0 IHSI Weld Treatment 7)

PB IHSI 7.0 INSI Implementation Procedure R)

PB-93-1 Ultrasonic Examination of Welds in Pipe 9)

PB-93 2.0 Visual Examination 10)

PB-83 3.0 Liquid Penetrant Examination 11)

PB-93 4.0 Etching Procedure 12)

PB-83 5.0 Material and Processes 13)

PB-93 6.0 Arc Strike Removal Procedure 14)

PB-83 7.0 General Weld Procedure 15)

PR-83 R.R.1 Detailed Weld Procedure P-8 to n-9 16)

PB-83 9.0 Pipe Hanger / Restraint Removal P. Installation 17)

PB-83 10.0 Piping Temporary Supperts 18)

PB-83 11.0 General Rigging Procedures

John F. Stolz, Chief Page 3

Should you have any questions or require additional information, please do not hesitate to contact us.

Very truly

ours, W. M. Alden Engineer-In-Charge Licensing Section Nuclear Generation Division Attachments cc: A. R. Blough, Site Inspector - w/o attachment Mr. Wayne Roberts - w/ attachment EGEG Idaho, Inc.

P. O. Box 1625 Idaho Falls, Idaho 83415 Mr. R. J. Benich - w/o attachment Service Project Manager Northeast Region 175 Curtner Avenue San Jose, CA 95125 l