ML20245G181

From kanterella
Jump to navigation Jump to search
Forwards Procurement Engineering Assessment Plan Final Rept, Confirming That Reasonable Level of Confidence Exists That Safety Function of Installed Equipment Had Not Been Adversely Impacted by Past Procurement Practices
ML20245G181
Person / Time
Site: Rancho Seco
Issue date: 05/03/1989
From: Croley B
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20245G185 List:
References
AGM-NTS-89-114, NUDOCS 8906290047
Download: ML20245G181 (1)


Text

_

[ ,, , ,

j...y j

% )SMU !

meono SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S Street, P.O. Box 15830, Sacramento.CA N5h52,1p30, (916) 452-3211 AN ELECTRIC SYSTEM SERVING TNE REART i OF CALIFORNIA 1

89 HAY 9 A9:ql )

'AGM/NTS89-114 May,3, 1989 U. S. Nuclear Regulatory Commission  !

Attn: 1. B. Martin, Regional Administrator i Region V {

1450 Maria Lane, Suite 210 i

.Hainut Creek,.CA 94596 '

Docke~t No.'50-312 Rancho Seco Nuclear Generating Station j License No. DPR-54 '

PROCUREMENT ENGINEERING ASSESSMENT PLAN FINAL REPORT

Dear Mr. Martin:

Attached is' the final report of the Procurement Engineering Assessment Plan (PEAP). The PEAP was established in December 1987 to evaluate past and i present material control practices and to recommend improvements. The PEAP 6 l

Interim Report, dated March 1, 1988, concluded that there was a reasonable level of confidence that the safety function of installed equipment had not been adversely impacted by past procurement practices. The PEAP Final Report confirms this conclusion, i The procurement practices currently implemented at Rancho Seco reflect the lessons learned from the PEAP and thus provide assurance that future '

procurement activities will support the objective of safe plant operation.

Members of your staff with questions requi' .g additional information or  !

clarification may contact Mr. Dave Swank at (209) 333-2935, extension 4920.

Sincerely, 'l i

i Bob G. Croley I gAssistantGeneralManager Nuclear Technical Services ,

Attachment

~

cc w/atch: A. D'Angelo, NRC, Rancho Seco l Document Control Desk, Washington DC 8906290047 890503 , I l

PDR ADOCK 0500031.

PDC 1

P _g c . RANCHO SECo NUCLEAR GENERATING STATION D 14440 Twin Cities Road, Herald, CA 95638 9799;(2o9) 333-2935

~

l G. j