ML20101G575

From kanterella
Jump to navigation Jump to search
Forwards Process Description for Advanced BWR App 18F Re Analysis of Operator Control & Info Needs
ML20101G575
Person / Time
Site: 05200001
Issue date: 03/26/1992
From: Tang C
GENERAL ELECTRIC CO.
To: Greg Galletti
NRC
References
NUDOCS 9206260146
Download: ML20101G575 (2)


Text

MAF: 26 'd 1:53FM GE INCLD.i A!If'

'tJ!!0 f.1.:

9 s.

i

/

Q hY unsw ABWR Date 7/R 4 H D.

To Fax No.

GRG6 6A t LE 7 7/

WRC-4-HF8 This pageplus /

page(s)

From CAL TA d6 vail Code 175 Cunner Avenue San Jose, CA 95125 Phone (408) 925 lef 0 /

FAX (408) 925-1193 or (408) 925-1687 Subject

'Pecesss Wesemenos Ax A B w A M /ev pix 12 f Message S ee s.-

wpo pew yo ve A'coues r.

Plear C4LL Monry $o s.s G yoS. 9D f-dffo f, ld,s wss,;,w if n ee kd.

' 'or nc i

b r ac,c as y

v E

)

D[h 9206260146 920326 PDR ADOCK 05200001 D

\\\\g A

PDR L..

\\

DESCRIPT!ON OF PROCESS FOR DEVEL W 4NG EMERGENCY OPERATION INFOR'MTION AND CONTROLS FOR GIAPTER 18 APPENDIX 18F.

  • e, a +

. An analysis of operator control and informadon needs is performed based upon the ABWR EPGs as given in Appendix lBA and based upon the results of analysis of important operator actions in the PRA. "The analysis results is documented in Appendia 18F in the form of tables. A table is used for each EPG step or PRA-important opera action as described below:

(1)

(2) 0)

(o (5)

~

$TEP STEP DESCRIPTION OF STEP INFORMATION TO CON ROL REFERLNCE FERFORM STEP FUNC*f10NS TO PERFORM STEP State whether State the specific Provide a denttiption of the List information ne.cenary List control this step is itom EPO step or PR A the EPOs of an reference, step. In etany c shes. this is to deltrmine if opernor functions to petform irnportant PRA in:lude each quoted from the EPGs, Also riion is to be performed the stated ste' provide any further (usually plant or procen operator entry cor'dition, clarification or additional conditiorm i s, symptoms) scues caution, and note information comparable to that u a sepuse st'P-of the EOPs, if approF ste.

i (6) d)

(8)

(9)

(10)

PARAMETER CONTROLS ALARMS OPERATOR Di$ PLAYS TO DISPLAYS TO EXECUTE STEP TO PERFORM STEP AIDS TO JUDGE ACllON TO EXEctrrE STEP PERFORM ACCOMPLISHMENT STEP OR thTTIATION List puameter d? days List & control devices to caecute the st - The for caecunng the step-List alums necessary List all operatt>r List the displays used for to perform the step.

sids required by feedback to the nperators puameters listed in this he control devices The alums listed m the operator to to ensure that each column shnuld be the listed in this column this eclumn should perform the step oprator action has been implementation of the should be the implement certain (nomographs, accomplished or initiated information given in i.nplementation of the information needs steam tables, appropriately

  • column 4*.

control functions given given in et,lumn 4*.

procedures etc<>.

m colurnn 5*

(11)

(12)

(I I PO$tT10N OF COhiROLS TO ALARMS TO OPERATOR AIDS TO DISPLAY, COffrR OL, OR (14)

JUDOE ACTION JUDGE AC* TION JUDGE ACTION ALARM CLASS lE OR REO.

ACCOMPLl5HMENT OR ACCOMPLlSHMENT OR ACCOMPLISHMENT OUIDE 197 INSTRUMENT INITIATION INITIATION OR thTTIATION List the controls used In-List the alarms used for List the operator sids State whether the duplays,

feedback to the operato.. to feedback to the operators to used for feedback to the controls, or altJms att ensure that each opetuor acbon ensure that each egrator operators.o ensere that provided by Class IE has been accomplishe action has been each operator action bas mstrumentatiert In additiert initiated appropriate,d or accomphshcd or init2sted been accomplished or identify puameter displays

,pp,,p,;p g..

initiated appropriately.

that are Regulatory Ouide 1.97 parameters.

  • For parameter displays, controls, and alarms, state whether these are fixed position, divisional VDU, or VDU devices,10 obuun information for these devices, systern design documents such as P&lDs, Instrument Electrical Diagrams (IEDs),or Interlock Block Diagrams (IBDs) are reviewed. In these design documents, the device functions afe Eiven but how and where these devices are located are generall to be made as part of the main control room design implementation process. y not avadable as such decisions are The information riven in columns 6 7,8,10, i1, and 12, regarding the "how" and "where" the functions are provided, is based in part upon the results of he design and development proEram conducted for the ABWR main control The informat on in column 14 is b sed upon desiga specifications and Section 7.5 of the SSAR. The operations analyses document.:d in Appendix 18F also addressess other design implementation details which are beyond the s the existing (i.e., vendor equipment inde processing and logic bypass functions). pendent) design documentation (e g 'S AR, tho special EOP related alarm As stated in Section 18.3.3 of the S alarms which are critical to the execution of the operator actions addressed in these operation analyses are design in accordance w th the design implementauon details presented in those tables Appends 18F was develyed and reviewed by individuals experienced in the areas of EPGs and plant operation system design, conNI and instrumentation, and nuclear engineering.

_ _ - -. _ _ - _ _ _ - _ _ _ - _