Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Final Rept Re in-containment Conduit Junction Box Deficiency". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML15113A589  + (Forwards Final Rept Re Emergency Electrical Power Sys & Other Related Matters)
  • ML19208A711  + (Forwards Final Rept Re Flexible Bellows Penetrations of Steel Containment Vessel Misaligned During Installation)
  • ML19208A712  + (Forwards Final Rept Re Flexible Bellows Penetrations of Steel Containment Vessel Misaligned During Installation)
  • ML19340C234  + (Forwards Final Rept Re IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys. Rept by Gilbert Associates,Inc Encl.Tables in App III a & B Will Be Updated in Next Revision)
  • ML20064F707  + (Forwards Final Rept Re Incomplete Documentation of Seismic Qual of Elec Penetrations)
  • ML19281A750  + (Forwards Final Rept Re Installation of Essential Raw Cooling Water Drain Valve TVA Class G Instead of TVA Class C)
  • ML20064G910  + (Forwards Final Rept Re Leaking Drain Line Weld in a LPSI Loop.Section of Pipe Containing Failed Weld Has Been Removed & Replaced)
  • ML20117N028  + (Forwards Final Rept Re Main Steam Sys Snubber Failure, Documenting Subsequent Investigation of Failure.Results of Investigation Already Presented to Nrc.Cause of Failure Undetermined)
  • ML16312A188  + (Forwards Final Rept Re Operating Experience of Plant Augmented Offgas Treatment Sys.Data Was Compiled During Eg&G Id,Inc 781010-13 Site Visit.W/O Encl)
  • ML19342D020  + (Forwards Final Rept Re Operational Safeguards Response Evaluation Results & Conclusions Requiring Response in 45 Days from Date of Receipt.Rept Withheld,Per 10CFR73.21)
  • ML20042A720  + (Forwards Final Rept Re Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts,In Response to IE Bulletin 79-02,Revision 2.Pipe Support Base Plate Flexibility Verified)
  • ML19261B656  + (Forwards Final Rept Re Possible Unconservative Pressurizer Relief & Safety Line Blowdown Analysis. Concludes All Points in Lines Meet Allowable Stresses in Power Piping Code)
  • ML19269H439  + (Forwards Final Rept Re Potential Problem in safety-related Overcurrent Relays.Problem Was Random in Nature & Not Generic)
  • ML19296B996  + (Forwards Final Rept Re QC Deficiency of Concrete Testing Svcs at Southwestern Labs)
  • ML19296B997  + (Forwards Final Rept Re QC Deficiency of Concrete Testing Svcs at Southwestern Labs)
  • ML17326A486  + (Forwards Final Rept Re Recirculation Sump Under Loca/Jet Impingement Conditions,Completing Response to NRC 780801 Request.Jets from Credible Breaks in RCS Will Not Cause Significant Air Binding of ECCS Pumps Performance)
  • ML17326A472  + (Forwards Final Rept Re Recirculation Sump Under Loca/Jet Impingement Conditions,Completing Response to NRC 780801 Request.Jets from Credible Breaks in RCS Will Not Cause Significant Air Binding of ECCS Pumps Performance)
  • ML19282B550  + (Forwards Final Rept Re Reportable Deficiency Concerning Wkm Valve Overpressurization.Valve Manufacturer Could Not Guarantee Communication Between Cavity & Conduit.All Valves Listed Will Be Modified to Ensure Overpressurization)
  • ML17303A733  + (Forwards Final Rept Re Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures & Improper Switch Settings. Procedures for Correct motor-operator Switch Setting Determination & Maint Established)
  • ML20063D940  + (Forwards Final Rept Re Review of QA Program for Design & Const of Facility Related Ofc Memos)
  • ML20059M762  + (Forwards Final Rept Re Revised Reactor Coolant Loop Spectra Effects,Per & Insp Repts 50-327/90-18 & 50-328/90-18)
  • ML20134C905  + (Forwards Final Rept Re Spent Fuel Storage Pool Safety Issues)
  • ML20134C906  + (Forwards Final Rept Re Spent Fuel Storage Pool Safety Issues)
  • ML19207A316  + (Forwards Final Rept Re Stop Work Order Issued to Bingham-Willamette Co on 790329)
  • ML19207A317  + (Forwards Final Rept Re Stop Work Order Issued to Bingham-Willamette Co on 790329)
  • ML19290E489  + (Forwards Final Rept Re Work Performed on Site B for Subgrade Burial of Tailings from Pitch Mill.W/O Encl. Recommends That Site B Not Be Considered Viable Site for Deposition of Tailings.May re-evaluate Site a)
  • ML19242A528  + (Forwards Final Rept Re in-containment Conduit Junction Box Deficiency)
  • ML19242A529  + (Forwards Final Rept Re in-containment Conduit Junction Box Deficiency)
  • ML20149C346  + (Forwards Final Rept Re post-accreditation Audit of Training Programs at Plant Conducted in Mar 1987.Nonlicensed & Licensed Operator Training Programs Developed from Task Analysis Identified Skills & for Learning Objectives)
  • ML20087C763  + (Forwards Final Rept Re small-scale Offsite Radiological Emergency Preparedness Exercise on 821014.No Deficiencies Noted)
  • ML20071H621  + (Forwards Final Rept Reactor Containment Bldg Integrated Leak Rate Test Unit 1 - Fifth Periodic)
  • L-79-186, Forwards Final Rept Responding to IE Bulletins 79-02 & 02,Revision 1,re Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts.Table Encl W/Results of Insp & Testing,Nonconformances & Deficiencies  + (Forwards Final Rept Responding to IE Bulletins 79-02 & 02,Revision 1,re Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts.Table Encl W/Results of Insp & Testing,Nonconformances & Deficiencies)
  • ML20134C016  + (Forwards Final Rept Rev 1 to CE NPSD-951, Reactor Trip Circuit Breakers Surveillance Frequency Extension)
  • ML20216J860  + (Forwards Final Rept Rev 1 to Topical Rept CE NPSD-951-A, Reactor Trip Circuit Breakers Surveillance Frequency Extension. ABB Combustion Engineering Nuclear Power Prepared TR on Behalf of CEOG)
  • ML20248F397  + (Forwards Final Rept SL-5192, Independent Corrective Action Verification Program for Millstone Unit 3. Full,multi-vol Rept Will Be Transmitted on 980608)
  • ML20248L953  + (Forwards Final Rept SL-5192, Millstone Unit 3,Independent Corrective Action Verification Program, Vols 1-5.First Paragraph on Page 1.6-1,revised to Delete Ref to Unconfirmed Drs)
  • ML20151J672  + (Forwards Final Rept SWRI-6582-005, Research Program for Seismic Qualification of Nuclear Plant Electrical & Mechanical Equipment. W/O Encl)
  • ML20151J653  + (Forwards Final Rept SWRI-6582-005, Research Program for Seismic Qualification of Nuclear Plant Electrical & Mechanical Equipment & Swri 840531 Transmittal Ltr.Repts Will Be Published as Nureg.W/O Rept)
  • ML20129D663  + (Forwards Final Rept Spring 1996 Inservice Exam of Selected Class 1 & Class 2 Components at Calvert Cliffs Nuclear Power Plant,Unit 1.)
  • ML20129D659  + (Forwards Final Rept Spring 1996 Inservice Exam of Selected Class 1 & Class 2 Components at Calvert Cliffs Nuclear Power Plant,Unit 1)
  • ML20203D421  + (Forwards Final Rept Summarizing Readiness of Unit 2 for Issuance of Full Power Ol.Region V Recommends Issuance of Full Power Ol,Subj to Conditions in Rept,Including Fire Barrier Penetrations & LERs)
  • ML20065J685  + (Forwards Final Rept Summary of Decommissioning Process of Univ of UT AGN-201M Reactor 107)
  • ML20053D334  + (Forwards Final Rept TR-5539-2, Independent Design Review, LaSalle County Nuclear Station 1)
  • 2CAN098801, Forwards Final Rept Ten-Yr Visual Tendon Surveillance of Arkansas Nuclear One Unit 2 Primary Reactor Containment.... Util Reviewed Rept & Agrees W/Results of Surveillance Which Indicates That No Abnormal Degradation Occurred  + (Forwards Final Rept Ten-Yr Visual Tendon Surveillance of Arkansas Nuclear One Unit 2 Primary Reactor Containment.... Util Reviewed Rept & Agrees W/Results of Surveillance Which Indicates That No Abnormal Degradation Occurred)
  • ML20117P222  + (Forwards Final Rept Thermal Properties of Concrete at High Temps,)
  • ML20198D315  + (Forwards Final Rept Updating Existing Evacuation Plan for Facility in Linn County,Ia.State of Iowa Submitted Document to FEMA for Review & Approval as Part of Ongoing Rev to Emergency Plans)
  • ML19256A607  + (Forwards Final Rept by Wb Murfin(Sandia Scientist Assigned to Kernforschungzenentrum Karlsruhe,Germany)Re Research Projects on Core Meltdown,Lwr Fuel Rod Behavior,Experimental Techniques to Measure 2-phase Flow & Thermal Hydraulics)
  • ML20092G078  + (Forwards Final Rept for 830517 Offsite Radiological Emergency Preparedness Exercise & State of Nc Corrective Action Schedule.Exercise Satisfactory)
  • ML20206J073  + (Forwards Final Rept for 871014 Exercise of Offsite Radiological Emergency Response Plans for Plant.Nineteen Deficiencies Observed in Exercise.Fema Reserves Right to Invoke 44CFR350.13 Pending Results of 881116 Exercise)
  • ML20094L741  + (Forwards Final Rept for 910822 Exercise of Offsite Radiological Emergency Response Plans Site Specific to Facilities)
  • ML20101D549  + (Forwards Final Rept for 911105 Exercise of Offsite Radiological Emergency Response Plans site-specific to Monticello Plant.One Deficiency & Two Areas Requiring Corrective Action Identified)
  • ML20086B313  + (Forwards Final Rept for 931116 full-participation Plume Exposure Pathway Exercise of Offsite Radiological Emergency Response Plans)