Forwards Final Rept Reactor Containment Bldg Integrated Leak Rate Test Unit 1 - Fifth Periodic
ML20071H621
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 07/15/1994
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20071H623 List:
References
NUDOCS 9407190375
Download: ML20071H621 (1)


Text

Southern Nuclear Operating Company Post O*hce Box 1295 Birmingham, Alabama 35201 Telephore (205) 868 5131 e4 om uo,ev Southern Nudear Operating Company Vice President FadetProject the southern electnC System July 15,1994 Docket No.: 50-348 10 CFR 50 Appendix J U. S. Nuclear Regulatory Commission A'ITN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant - Unit i Reactor Containment Building,Intecrated Leak Rate Test Enclosed is the Joseph M. Farley Nuclear Plant Unit I fifth periodic Reactor Containmens Building Integrated Leak Rate Test Report. This report describes and summarizes the Integrated Leak Rate Test (ILRT) activities performed as a part of the Unit I twelflh refueling outage.

Other pertinent report infonnation, including, as applicable, test plans and schedules, test results and reports, and test methods and procedures, is available at Farley Nuclear Plant for review.

If there are any questions, or if additional information is needed, please advise.

Respectfully submitted,

]Mf Dave Morey 1.1 Irdt.leakrate. doc Enclosure cc: Mr. S. D. Ebneter w/ene.

Mr. B. L. Siegel w/ enc. j Mr. T. M. Ross 1F 0l7 9407190375 940715 'I l l PDR ADOCK 05000349  !

P PDR '

l