Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ELV-00272, Forwards Cycle 1 Radial Peaking Factor Limit Rept,Per Tech Spec 6.8.1.6 & Elevation Dependent Peaking Factor Versus Core Height Graph + (Forwards Cycle 1 Radial Peaking Factor Limit Rept,Per Tech Spec 6.8.1.6 & Elevation Dependent Peaking Factor Versus Core Height Graph)
- ML20129D006 + (Forwards Cycle 1 Radial Peaking Factor Limit Rept, Submitted Per Tech Spec 6.9.1.9)
- ML20078A883 + (Forwards Cycle 1 Startup Rept 3 & All Test Conditions 4 & 5 Covering Addl Portions of Testing Specified for Test Conditions by FSAR Figure 14.2-2 Not Included in to NRC)
- ML20082Q722 + (Forwards Cycle 1 Startup Rept Prepared & Submitted Per Specification 6.9.1.1 of App a TS on Plant Unit 1 Operating License & Attachment a to Encl Rept Which Provides Power Operation Levels of Loose Parts Monitoring Sys)
- ML20082U883 + (Forwards Cycle 1 Startup Test Rept 4)
- ML17291A623 + (Forwards Cycle 10 Colr. Informs That Committee Has Reviewed & Approved Rev 1 to COLR 94-10)
- GO2-95-014, Forwards Cycle 10 Colr. Informs That Committee Has Reviewed & Approved Rev 1 to COLR 94-10 + (Forwards Cycle 10 Colr. Informs That Committee Has Reviewed & Approved Rev 1 to COLR 94-10)
- ML20238C578 + (Forwards Cycle 10 Fuel Performance Rept Based on Month by Month Evaluation of I-131 Activity Data & Ultrasonic Insp of 136 Fuel Assemblies by Advanced Nuclear Fuels,Inc at End of Cycle 10)
- ML20205F857 + (Forwards Cycle 10 Radial Peaking Factor Limit Rept,Per Tech Spec 6.9.1.7,for Approval Prior to Initial Criticality. Operation Scheduled for 870516)
- ML20092K413 + (Forwards Cycle 10 Startup Rept,June 1984)
- ML20212B758 + (Forwards Cycle 10 Startup Test 5,Stability Comparison Between Dual Loop Operation & Single Loop Operation, Completing Startup Test Rept Summary Initially Transmitted on 861126)
- ML20210N505 + (Forwards Cycle 10 Update to TS Bases,Which Have Been Revised Between 980101-990630,per 10CFR50.71(e))
- ML20198S714 + (Forwards Cycle 10 Voltage-Based Repair Criteria 90-Day Rept, Per GL 95-05.Rept Is Submitted IAW License Condition 2.C.(9)(d))
- ML20150E776 + (Forwards Cycle 11 Radial Peaking Limit Rept Per Tech Spec 6.9.1.7.Results Applicable for Current Tech Spec Fq Limit of 2.32 & Proposed Limit of 2.50 Currently Under Review as Part of License Change Application 161)
- ML20034A201 + (Forwards Cycle 11 Reload & Core Operating Limits Rept,Per Generic Ltr 88-16)
- ML20084U716 + (Forwards Cycle 11 Startup Test Rept Per TS 6.9.1.3 Item)
- ML20043E722 + (Forwards Cycle 12 Administrative Controls,To Be Implemented Prior to Reactor Startup from Current Refueling Outage. Administrative Controls Structured to Minimize Spread of Contaminates to Secondary Steam Supply Sys)
- ML20247G205 + (Forwards Cycle 12 Radial Peaking Factor Limit Rept. Results of Analysis Applicable to License Change Application 161, Nuclear Fuel Upgrade)
- ML20117B699 + (Forwards Cycle 12 Startup Test Rept Which Summarizes Applicable Physics Testing Performed to Verify Adequacy of Cycle 12 Reload Core Design,Iaw TS 6.9.1.3 Item (2))
- L-97-034, Forwards Cycle 13 Reload & COLR, Updated to Include New Radial Peaking Factor at Rated Thermal Power Limits for Unrodded Core Planes.Cycle 13 Reload Design,Discussed + (Forwards Cycle 13 Reload & COLR, Updated to Include New Radial Peaking Factor at Rated Thermal Power Limits for Unrodded Core Planes.Cycle 13 Reload Design,Discussed)
- ML20136H365 + (Forwards Cycle 13 Start-Up Test Rept for Jafnpp,Which Was Submitted IAW Reporting Requirements of Section 6.3.a.1 of Plant TS)
- JAFP-97-0090, Forwards Cycle 13 Start-Up Test Rept for Jafnpp,Which Was Submitted IAW Reporting Requirements of Section 6.3.a.1 of Plant TS + (Forwards Cycle 13 Start-Up Test Rept for Jafnpp,Which Was Submitted IAW Reporting Requirements of Section 6.3.a.1 of Plant TS)
- ML20216A881 + (Forwards Cycle 13,Pattern Ud COLR for North Anna Unit 2. No New Commitments Made within Ltr)
- ML20099B956 + (Forwards Cycle 14 Low Power Physics & Power Ascension Test Program. Cycle 14 Core Consists of 52 New Fuel Assemblies Mfg by Westinghouse & 81 Used Fuel Assemblies Mfg by ABB/C-E)
- LIC-95-0001, Forwards Cycle 16 Reload Evaluation Rept for Fcs,Unit 1. Rept Provides Evaluation of Core Design & Performance for Operation During Cycle 16 + (Forwards Cycle 16 Reload Evaluation Rept for Fcs,Unit 1. Rept Provides Evaluation of Core Design & Performance for Operation During Cycle 16)
- ML19270G354 + (Forwards Cycle 2 Base Reactivity Curve)
- ML19317D647 + (Forwards Cycle 2 Power Distribution Comparison Rept as Requested in NRC 730820 Ltr)
- ML19317D646 + (Forwards Cycle 2 Power Distribution Comparison Rept as Requested in NRC)
- ML20151Y801 + (Forwards Cycle 2 Radial Peaking Factor Limit Rept,Per Tech Spec 6.9.1.9.Rept Includes Fxy Limits for Rated Thermal Power for All Core Planes Containing Bank D Control Rods & All Unrodded Core Planes)
- ML20247A214 + (Forwards Cycle 2 Radial Peaking Factor Limit Rept & Associated Graph,Per Tech Spec 6.9.1.14 & Util 890105 Tech Spec Change 1A-158/2A-19)
- ML20213F155 + (Forwards Cycle 2 Radial Peaking Factor Limit Rept,Per Tech Spec Section 6.9.1.9)
- 2CAN038307, Forwards Cycle 2 Refueling Outage Fuel Exam Results. Rept Describes Visual Insp Required by FSAR Section 4.2.1.10, Leak Testing & Shoulder Gap Measurements.Cycle 2 Offload Completed W/O Incurring Significant Damage + (Forwards Cycle 2 Refueling Outage Fuel Exam Results. Rept Describes Visual Insp Required by FSAR Section 4.2.1.10, Leak Testing & Shoulder Gap Measurements.Cycle 2 Offload Completed W/O Incurring Significant Damage)
- ML20027E262 + (Forwards Cycle 2 Regional SALP Evaluation Repts.Performance Below Average.Board Recommends Increased Insp Effort)
- ML20148T226 + (Forwards Cycle 2 Reload Analysis Report, Which Evaluates Design & Anticipated Operation of Cycle-2 Reactor Sys.Sys Meets All Applicable Safety Criteria.Section 7 Re Transient Analysis & Section 11 Re Tech Specs to Be Submitted 810301)
- ML19350C947 + (Forwards Cycle 2 Rod Misalignment Analysis, in Support of Util Request for Amend 58 to License DPR-66.Portion Withheld (Ref 10CFR2.790))
- ML20247M370 + (Forwards Cycle 2 Startup Physics Test Rept Summarizing Applicable Physics Testing Performed to Verify Adequacy of Cycle 2 Reload Core Design.Results of Each Test Performed Indicates Measured Parameters within Acceptance Criteria)
- ML20024G812 + (Forwards Cycle 2 Startup Rept)
- ML20024G813 + (Forwards Cycle 2 Startup Rept)
- ML19250B589 + (Forwards Cycle 2 Startup Rept)
- ML19350A425 + (Forwards Cycle 2 Startup Rept for Facility)
- ML19350A426 + (Forwards Cycle 2 Startup Rept for Facility)
- 2CAN108110, Forwards Cycle 2 Startup Rept to NRC for Period Ending 810819 + (Forwards Cycle 2 Startup Rept to NRC for Period Ending 810819)
- ML19250B590 + (Forwards Cycle 2 Startup Rept.)
- ML20004E502 + (Forwards Cycle 2 Startup Test Rept)
- ML18082A293 + (Forwards Cycle 2 Startup Test Rept)
- ML18082A294 + (Forwards Cycle 2 Startup Test Rept.)
- ML20004E503 + (Forwards Cycle 2 Startup Test Rept.)
- ML20132C867 + (Forwards Cycle 2 Systematic Assessment of Licensee Performance Info for Jul 1980-Jun 1981 for Facility)
- ML20132C860 + (Forwards Cycle 2 Systematic Assessment of Licensee Performance Info Requested in 810604 Memo)
- ML100271749 + (Forwards Cycle 2,Startup Physics Test Rept)
- ML20246F865 + (Forwards Cycle 3 Peaking Factor Limit Rept,Per Tech Spec 6.9.1.9.Initial Criticality Occurred on 890606)