Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Forwards Cycle 2 Base Reactivity Curve". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19317D647  + (Forwards Cycle 2 Power Distribution Comparison Rept as Requested in NRC 730820 Ltr)
  • ML19317D646  + (Forwards Cycle 2 Power Distribution Comparison Rept as Requested in NRC)
  • ML20151Y801  + (Forwards Cycle 2 Radial Peaking Factor Limit Rept,Per Tech Spec 6.9.1.9.Rept Includes Fxy Limits for Rated Thermal Power for All Core Planes Containing Bank D Control Rods & All Unrodded Core Planes)
  • ML20247A214  + (Forwards Cycle 2 Radial Peaking Factor Limit Rept & Associated Graph,Per Tech Spec 6.9.1.14 & Util 890105 Tech Spec Change 1A-158/2A-19)
  • ML20213F155  + (Forwards Cycle 2 Radial Peaking Factor Limit Rept,Per Tech Spec Section 6.9.1.9)
  • 2CAN038307, Forwards Cycle 2 Refueling Outage Fuel Exam Results. Rept Describes Visual Insp Required by FSAR Section 4.2.1.10, Leak Testing & Shoulder Gap Measurements.Cycle 2 Offload Completed W/O Incurring Significant Damage  + (Forwards Cycle 2 Refueling Outage Fuel Exam Results. Rept Describes Visual Insp Required by FSAR Section 4.2.1.10, Leak Testing & Shoulder Gap Measurements.Cycle 2 Offload Completed W/O Incurring Significant Damage)
  • ML20027E262  + (Forwards Cycle 2 Regional SALP Evaluation Repts.Performance Below Average.Board Recommends Increased Insp Effort)
  • ML20148T226  + (Forwards Cycle 2 Reload Analysis Report, Which Evaluates Design & Anticipated Operation of Cycle-2 Reactor Sys.Sys Meets All Applicable Safety Criteria.Section 7 Re Transient Analysis & Section 11 Re Tech Specs to Be Submitted 810301)
  • ML19350C947  + (Forwards Cycle 2 Rod Misalignment Analysis, in Support of Util Request for Amend 58 to License DPR-66.Portion Withheld (Ref 10CFR2.790))
  • ML20247M370  + (Forwards Cycle 2 Startup Physics Test Rept Summarizing Applicable Physics Testing Performed to Verify Adequacy of Cycle 2 Reload Core Design.Results of Each Test Performed Indicates Measured Parameters within Acceptance Criteria)
  • ML20024G812  + (Forwards Cycle 2 Startup Rept)
  • ML20024G813  + (Forwards Cycle 2 Startup Rept)
  • ML19250B589  + (Forwards Cycle 2 Startup Rept)
  • ML19350A425  + (Forwards Cycle 2 Startup Rept for Facility)
  • ML19350A426  + (Forwards Cycle 2 Startup Rept for Facility)
  • 2CAN108110, Forwards Cycle 2 Startup Rept to NRC for Period Ending 810819  + (Forwards Cycle 2 Startup Rept to NRC for Period Ending 810819)
  • ML19250B590  + (Forwards Cycle 2 Startup Rept.)
  • ML20004E502  + (Forwards Cycle 2 Startup Test Rept)
  • ML18082A293  + (Forwards Cycle 2 Startup Test Rept)
  • ML18082A294  + (Forwards Cycle 2 Startup Test Rept.)
  • ML20004E503  + (Forwards Cycle 2 Startup Test Rept.)
  • ML20132C867  + (Forwards Cycle 2 Systematic Assessment of Licensee Performance Info for Jul 1980-Jun 1981 for Facility)
  • ML20132C860  + (Forwards Cycle 2 Systematic Assessment of Licensee Performance Info Requested in 810604 Memo)
  • ML100271749  + (Forwards Cycle 2,Startup Physics Test Rept)
  • ML20246F865  + (Forwards Cycle 3 Peaking Factor Limit Rept,Per Tech Spec 6.9.1.9.Initial Criticality Occurred on 890606)