Text

..

5

/, -mN Commonwealth Edison

/

/ One First NitionIl Plaza. ChtCfgo Illinoes

( C

~1 Address Reply to. Post Office Box 767 (j/ Chicago. !!Iinois 60690 December 6, 1983

/PRiff f PAL STAFF

/

M Mr. James G. Keppler, Regional Administrator V eA '/@GPi

Ao SCS 799 Roosevelt Road ML WA Glen Ellyn, IL 60137 ENF File M)

Subject:

LaSalle County Station Unit 1 Cycle 1, Startup Report #4 NRC Docket No. 50-373-References (a):

License NPF-11, Technical Specifications 6.6.A.1, Startup Report.

(b):

C.

W.

Schroeder letter to J. G. Keppler dated March 11, 1983.

(c):

C.

W.

Schroeder letter to J. G. Keppler dated June 24, 1983.

(d):

C.

W. Schroeder letter to J. G. Keppler dated September 12, 1983.

(e):

Regulatory Guide 10.1, Compilation of Reporting Requirements for Persons Subject to NRC Regulations.

Dear Mr. Keppler:

Reference (a) requires:

"A summary report of plant startup and power escalation testing shall be submitted following (1) receipt of an operating license, (2) amendment to the license involving a planned increase in power level, (3) installation of fuel that has a different design or has been manufactured by a different fuel supplier, and (4) modifications that may have significantly altered the nuclear, thermal, or hydraulic performance of the plant.

The report shall in general include a description of the measured values of the operating conditions or characteristics obtained during the test program and a comparison of these values with design predictions and specifications.

Any corrective actions that were required to obtain satisfactory operation shall also be described.

Any additional specific details required in license conditions based i

on other commitments shall be included in this report.

k 8312190205 831206 SPPg%

PDR ADOCK 050003?R 0

\\k (n

'J.1 G. Keppler December 6, 1983 Startup reports shall be submitted within-(l) 90 days following completion of the startup test program, (2) 90 days following resumption or commencement of commercial power operation, or.(3) 9 months following initial criticality, whichever is earliest.

If the'startupl report does not cover all three events (i.e.,

initial criticality, completion _of startup test program, and

. resumption or commencement of commercial power operation),

. supplementary reports shall be submitted at least every 3 months until all three~ events have been completed."

Initial criticality on Unit 1 occurred on June 21, 1982.

Other Unit 1, Cycle 1 Startup Reports were submitted to you by References (b),

(c), and-(d).

'The purpose of this letter cis to provide you with the test reports covering those additional portions of testing specified for_ Test Condition ~6 and Warranty.Run by FSAR Figure 14.2-2 which were performed.

The test results through Test. Condition 6 and the Warranty Run have undergone the initial review by the Test Group and this report is based on that review.

This report-should be considered-as the last report on LaSalle Unit 1 Initial Start-Up Test Program.

If the Onsite or Engineering Review of the test results indicates a major deviation from the results reported here, an additional report will be submitted.

To the best of my knowledge and belief the statements contained herein and in the attachment are true and correct.

In some respects these statements are not based on my personal knowledge but upon infor-mation furnished by other Commonwealth Edison and contractor employees.

Such information has been reviewed in accordance with Company practice and I believe it to be reliable.-

In accordance with the guidance of Reference (e), two (2) copies are being provided to the Region III Office and, by copy of this letter, thirty-six (36) copies are being provided directly to the DJrector, Office of Inspection and Enforcement, U.S. Nuclear Regulatory Commission,

-Washington, D.C.

20555, Attn:

Document Control Desk.

. If there are any questions regarding this submittal, please contact this office.

Very truly yours, n.)s}%3 C. W. Schroeder Nuclear Licensing Administrator

'1m'

~cc:

NRC Resident Inspector ~- LSCS-1 Director, Office of I&E - 36

[_

17746N