ML20084U716

From kanterella
Jump to navigation Jump to search
Forwards Cycle 11 Startup Test Rept Per TS 6.9.1.3 Item
ML20084U716
Person / Time
Site: Beaver Valley
Issue date: 06/06/1995
From: George Thomas
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20084U720 List:
References
NUDOCS 9506130275
Download: ML20084U716 (1)


Text

[

4

- 4 seaver veneypower station Shipp ng PA 160776 (412) 643-8069 FAX GEO*4GE S. THOMAS omnion vice presio.ni Jiane 6, 1995 UU$*'.7$maion o

U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Cycle 11 Startup Test Report Enclosed is a copy of the Cycle 11 Startup Test Report provided in accordance with Technical Specification 6.9.1.3 Item (2). This repon summarizes the applicable physics testing perfonned to verify the adequacy of the Cycle 11 reload core design. The results of each test performed indicate that the measured parameters are within the specified acceptance criteria or were evaluated and determined to be within the available margin.

Sincerely, ye Ae_:r George S. Thomas Enclosure c:

Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Manin, NRC Region I Administrator Mr. D. S. Brinkman, Sr. Project Manager l

9506130275 950606 PDR ADOCK 05000334 P

PDR