Text
.
L 2,
,g Omaha F'ablic Power District 444 South 16th Street Mall Omaha, Nebraska 68102 2247 402/636-2000 July 29, 1992 LIC-92-216R V. S. Nuclear Regulatory Commission ATTN: Document Cont rol Desk Mail Sts :on PI-137 Washir.gto, DC 20555
References:
1.
Docket No. 50-285 2.
Letter from NRC (D. L. Wioginton) to OPPO (W. G. Gatt.s) dated April 2, 1991 3.
Letter from NRC (9. L. Wigginton) to OPPD (W. G, Gates) dated April 22, 1992 Gentlemen:
SUBJECT:
Fort Calhoun Station (FCS) Cycle 14 Low Power Physics and Power Ascension Test Report The FCS Cycle 14 core consists of 52 new fuel assemblies manufactured by Westinghouse Electric Corporation and 81 used fuel assemblies manufactured by ABB/Comh"stion Engineering. Cycle 14 represents the first operating cycle using Westinghouse fuel.
Therefore, according to Tec'inical Specification Section 5,9.1.a Omaha Public Power District has preparea the httached subject report for Cycle 14.
The subject report includes a general description of the measured values obtained during the Cycle 14 startup test and evaluation phases.
Also included is a comparison of these measured values with calculated design predictions.
If you should have any questions, please contact me.
Sincer ly, Ah W. G. Cates ivision danager Nuclear Operations WGG/grc Attachment c:
l'~aeuf Lamb, Leiby & MacRae J
Mllhoan,NRCRegionalAdministrator,RegionIV R
Mullikin, NRC Senior Resident Inspector S. 9. Bloom, NRC Acting Project Manager 9208030189 920729 PDR ADOCK 05000285 P
/.