Text
_
..,.j-
- ver Valley Power Staten Sh:ppingport, PA 150770004
-- L"2Elll.L,a, o,a July 24, 1989
- U. S. Nuclear Regulatory Commission Attn
Document Control Desk Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Cycle 2 Startup Test Report Gentlemen:
Enclosed is a copy of the Cycle 2 Startup Test Report provided in accordance with Technical Specification Administrative Control "6.9.1.3' item (2).
This report summarizes the applicable physics
-testing. performed to verify the adequacy of the Cycle 2 reload core design.
The results of each test performed indicate the measured parameters were within the specified acceptance criteria.
Very truly yours, I
s S eber Vice President Nuclear Group Enclosure cc:
Mr. J. Beall, Sr. Resident Inspector Mr.-W. T. Russell, NRC Region I Admini.tcrator Mr. P. Tam, Sr. Project Manager m
l' i
yh 8908020081 890144 PDR ADOCK 050v0412 l [
p PDC 1
e_=_=-_-
-