ML20247M370

From kanterella
Jump to navigation Jump to search
Forwards Cycle 2 Startup Physics Test Rept Summarizing Applicable Physics Testing Performed to Verify Adequacy of Cycle 2 Reload Core Design.Results of Each Test Performed Indicates Measured Parameters within Acceptance Criteria
ML20247M370
Person / Time
Site: Beaver Valley
Issue date: 07/24/1989
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20247M377 List:
References
NUDOCS 8908020081
Download: ML20247M370 (1)


Text

_

..,.j-

- ver Valley Power Staten Sh:ppingport, PA 150770004

-- L"2Elll.L,a, o,a July 24, 1989

U. S. Nuclear Regulatory Commission Attn

Document Control Desk Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Cycle 2 Startup Test Report Gentlemen:

Enclosed is a copy of the Cycle 2 Startup Test Report provided in accordance with Technical Specification Administrative Control "6.9.1.3' item (2).

This report summarizes the applicable physics

-testing. performed to verify the adequacy of the Cycle 2 reload core design.

The results of each test performed indicate the measured parameters were within the specified acceptance criteria.

Very truly yours, I

s S eber Vice President Nuclear Group Enclosure cc:

Mr. J. Beall, Sr. Resident Inspector Mr.-W. T. Russell, NRC Region I Admini.tcrator Mr. P. Tam, Sr. Project Manager m

l' i

yh 8908020081 890144 PDR ADOCK 050v0412 l [