Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19354D992 + (Forwards Beatty,Nv Low Level Radwaste Disposal Facility Docs Including State License,Rev 0 to Facility Stds Manual, Contingency Plan & Operational Procedures)
- ML20154H062 + (Forwards Beaver Valley Deletion of Reactor Trip on Turbine Trip Below 70% Power. Analysis Justifies Increase of Setpoint from 50 to 70% Power Level for Reactor Trip Upon Turbine Trip)
- ML20093A431 + (Forwards Beaver Valley Power Station 1984 Annual Emergency Preparedness Exercise)
- ML20138C635 + (Forwards Beaver Valley Power Station 1996 Annual Environ Repts,Radiological & Non-Radiological.Non-Radiological Rept Is Forwarded in Entirety,Containing Pertinent Info on Biofouling Program)
- ML20138C640 + (Forwards Beaver Valley Power Station 1996 Annual Environ Repts,Radiological & Non-Radiological.Non-Radiological Rept Is Forwarded in Entirety,Containing Pertinent Info on Biofouling Program)
- ML20071D519 + (Forwards Beaver Valley Power Station Annual Emergency Preparedness Exercise)
- ML20138D349 + (Forwards Beaver Valley Power Station Annual Exposure Rept 1996. Rept Contained on Encl Disks)
- ML20138D350 + (Forwards Beaver Valley Power Station Annual Exposure Rept 1996. Rept Contained on Encl Disks)
- ML20079A964 + (Forwards Beaver Valley Power Station Evaluation of Adequacy of Existing Neutron Flux Instrumentation for NUREG-0737,Suppl 1. Rept Submitted in Lieu of Upgrading Instrumentation Per Rev 2 to Reg Guide 1.97)
- ML20094L090 + (Forwards Beaver Valley Power Station Flux Reduction Program for Unit 1 Reactor Pressure Vessel. Attached Flux Reduction Program Assumes Both Longitudinal & Transverse Data Acceptable for Use)
- ML20136F125 + (Forwards Beaver Valley Power Station Site-Specific Offsite Radiological Emergency Preparedness Alert & Notification Sys QA Verification, Summarizing Engineering Design Review.Alert & Notification Sys Acceptable)
- ML20076B253 + (Forwards Beaver Valley Power Station Unit 2 Addition to 1989 Rept of Facility Changes,Tests & Experiments & Beaver Valley Unit 2 1990 Rept of Facility Changes,Tests & Experiments)
- ML20078Q523 + (Forwards Beaver Valley Power Station Unit 1 Simulator Four Yr Certification Rept 1991-94, as Required by 10CFR55.45(b)(5)(ii) & (b)(5)(vi))
- ML20114B036 + (Forwards Beaver Valley Power Station Unit 2 Cycle 4 Startup Physics Test Rept. Results of Each Test Performed Indicated That Increased Parameters within Specified Acceptance Criteria)
- ML20138Q994 + (Forwards Beaver Valley Power Station Unit 1,Reg Guide 1.97, Rev 2 Rept, Per Util 840612 Confirmatory Order,Generic Ltr 82-33 & Suppl 1 to NUREG-0737)
- ML20086A565 + (Forwards Beaver Valley Power Station Unit 1,Cycle 9 Startup Physics Test Rept)
- ML20077E660 + (Forwards Beaver Valley Power Station Unit 1 Cycle 9 Core Operating Limits Rept. Mechanical Design of New Region 11 Fuel Assemblies Listed)
- ML20074B015 + (Forwards Beaver Valley Power Station Unit 2 Fire Protection Evaluation Rept. Ack of Receipt Requested)
- ML20115B088 + (Forwards Beaver Valley Power Station Unit 1 PRA IPE, Summary Rept.Rept Addresses Issues in GL 88-20 & Organized Per IPE Submittal Guidance in NUREG-1335)
- ML20207Q029 + (Forwards Beaver Valley Power Station Unit 2 Dcrdr Supplemental Summary Rept. Rept Documents Continuation of Dcrdr & Responds to NRC Audit Conducted on 860211 & 12)
- ML20064H169 + (Forwards Beaver Valley Power Station Unit 2,Cycle 5 Startup Physics Test Rept. Results of Test Performed Indicate That Measured Parameters within Specified Acceptance Criteria)
- ML20086D828 + (Forwards Beaver Valley Power Station Unit 1 Probabilistic Risk Assessment IPE of External Events Summary Rept, Per GL 88-20,Suppl 4)
- ML20246E817 + (Forwards Beaver Valley Power Station Unit 1 Dcrdr Second Supplemental Summary Rept. Review Conducted to Ensure That Control Room & Emergency & Alternate Shutdown Panels Would Support Operation During Emergency Conditions)
- L-98-235, Forwards Beaver Valley Powwer Station Unit 1 Simulator Four Yr Certification Rept 1995 - 1998, IAW 10CFR55.45 + (Forwards Beaver Valley Powwer Station Unit 1 Simulator Four Yr Certification Rept 1995 - 1998, IAW 10CFR55.45)
- ML20116J068 + (Forwards Beaver Valley Unit 1 1996 Alternate Repair Criteria 90 Day Rept, Providing MSLB Leak Rates,Tube Burst Probabilities)
- ML20080R778 + (Forwards Beaver Valley Unit 1 Cycle 11 Colr)
- ML20108D034 + (Forwards Beaver Valley Unit 1 Cycle 12 Colr)
- ML20085F916 + (Forwards Beaver Valley Unit 1 Interim Plugging Criteria 90 Day Rept, Providing SG Tube Insp Supporting Info)
- ML20063E948 + (Forwards Beaver Valley Unit 1 Updated FSAR)
- L-98-077, Forwards Beaver Valley Unit 1,Cycle 13 Voltage-Based Repair Criteria 90-Day Rept, Which Supports Continued Implementation of 2.0 Volt Repair Criteria as Outlined in NRC GL 95-05 + (Forwards Beaver Valley Unit 1,Cycle 13 Voltage-Based Repair Criteria 90-Day Rept, Which Supports Continued Implementation of 2.0 Volt Repair Criteria as Outlined in NRC GL 95-05)
- ML20058F179 + (Forwards Beaver Valley Unit 2 Cycle 5 Core Operating Limits Rept, Per TS 6.9.1.14)
- ML20129A844 + (Forwards Beaver Valley Unit 2 Cycle 7 Colr)
- ML20129A849 + (Forwards Beaver Valley Unit 2 Cycle 7 Colr.)
- ML20096C122 + (Forwards Beaver Valley Unit 2,Cycle 4 Core Operating Limits Rept. Reload Core Design Will Be Verified by Performing Std Westinghouse Reload Core Physics Startup Tests & Results Will Be Submitted Per TS 6.9.1.3)
- ML20087G103 + (Forwards Beaver Valley Unit Internal Plugging Criteria Return to Power Ltr Rept & WCAP-14277, Slb Leak Rate & Tube Burst Probability Analysis Methods for ODSCC at TSP Intersections)
- ML20211L036 + (Forwards Bechtel & B&W Nonconformance Repts for May 1986,per Memorandum & Order ALAB-106)
- ML20009G143 + (Forwards Bechtel & B&W Nonconformance Repts,Quality Action Requests,Qa Findings,Inservice Insp Nonconformance Repts, Audit Findings,Corrective Action & Mgt Corrective Action Repts,Per ALAB-106 & Amend 1 of CP)
- ML20004D727 + (Forwards Bechtel & Dames & Moore Repts Re UHS Retention Pond,Which Corresponds to Meeting Summary Transmitted by NRC 810518 Memo.Repts Containing Addl Info Available in Central Files Only)
- ML17297B041 + (Forwards Bechtel & List of All safety-related Equipment & Instrumentation Necessary for Operator Action During Accident That Requires Qualification)
- ML20116E861 + (Forwards Bechtel & Util Nonconformance Repts,Quality Action Requests,Mgt Corrective Action Repts,Quality Audit Findings & B&W Repts of Nonconformity for Jan & Feb 1985,per Memorandum & Order ALAB-106)
- ML19207C457 + (Forwards Bechtel 790831 Rept Re Impact Testing of Main Feedwater Pipe.Addl Rept Will Be Provided by 791026)
- ML19207C458 + (Forwards Bechtel 790831 Rept Re Impact Testing of Main Feedwater Pipe.Addl Rept Will Be Provided by 791026)
- ML19318B090 + (Forwards Bechtel 800508 Suppl to Final Deficiency Rept Re Ruskin Mfg Co Vertical Fire Dampers.Mod Proposed in 800215 Final Rept Is Unacceptable Since Number 6 Screws Could Become Loose.Ruskin Has Developed Successful Design Mod)
- ML13317A680 + (Forwards Bechtel 810918 & 0921 Ltrs Re Equipment Loads for Turbine Bldg Complex & Mod to Turbine Bldg Per Request for Info on Auxiliary Feedwater Sys Project.Drawings Describing Mod to column-girder Joints Will Be Sent 811015.W/o Encls)
- ML20070T043 + (Forwards Bechtel 830131 Response to NRC Questions Posed on 830126 Re Order to Show Cause & Order Immediately Suspending Const.Response Clarifies Relationship Between Dillon,Read & Co & Bechtel)
- ML20091M660 + (Forwards Bechtel 840531 Response to Const Implementation Overview Tracked Action Item 068 Re Code Editions Implemented for Component Support Installation)
- ML20057A714 + (Forwards Bechtel 930910 & 0831 Ltrs Re QA Program Plan & ABWR Licensing Support,Civil/Structural Calculations, Respectively)
- ML20069G626 + (Forwards Bechtel Assoc Revised Comparison Between CMAA-70 & EOCI-61, Final Response to Technical Evaluation Rept, Section 2.1.8 Re Crane Design Per NUREG-0612)
- ML19338C001 + (Forwards Bechtel Associates Prof Corp Correspondence & Info Exchange W/Cpc,Consultants & Engineers Re Facility Const Conferences,Meetings,Tests & Repts)
- ML20213G752 + (Forwards Bechtel Calculation Sheets Re CRD Scram Discharge Header Drain Piping)
- ML20083N175 + (Forwards Bechtel Clarifying Company Relationship W/Dillon,Read & Co,Inc.No Conflict of Interest Exists Between Bechtel & Dillon,Read Contrary to Allegations Resulting in Order to Show Cause & Suspension of Const)