ML20085F916

From kanterella
Jump to navigation Jump to search
Forwards Beaver Valley Unit 1 Interim Plugging Criteria 90 Day Rept, Providing SG Tube Insp Supporting Info
ML20085F916
Person / Time
Site: Beaver Valley
Issue date: 06/09/1995
From: George Thomas
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20085F919 List:
References
NUDOCS 9506190465
Download: ML20085F916 (1)


Text

.. _......

Beaver Valley Power Station She ping PA 15077-0004 (412) 643-8069 FAX GEORGE S THOMAS

(( 3,h, *"

June 9, 1995 l

Nuclear Power Division U. S. Nuclear Regulatory Commission Attention: Document Control Desk

{

l Washington, DC 20555-0001

Subject:

Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 l

Steam Generator Tube Inspection Supporting Information

References:

1.

Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Amendment No.184 to Facility Operating License No. DPR-66 Duquesne Light Company Beaver Valley Power Station Unit No. I Docket No. 50-334.

2.

Letter from G. S. Thomas (Duquesne Light Company ) to U. S. Nuclear Regulatory Commission, " Response to Information Request Dated December 1,1994," December 13,1994.

Enclosed is a copy of the " Beaver Valley Unit 1, Interim Plugging Criteria 90 Day Report," which is provided to satisfy a commitment, identified in References I and 2, of providing main steam line break leak rates, tube burst probabilities and supporting data l

within 90 days following restart from the tenth refueling outage of Beaver Valley Unit 1.

If you have any questions regarding the attached information, please contact Mr. G. A. Kammerdeinci, Nuclear Engineering Department, at (412) 393-5677.

Sincerely,

--0 Wh ks Geor)ge S. Thomas 9506190465 950609 PDR ADDCK 05000334 Enclosures Q

PDR c:

Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC Region 1 Administrator Mr. D. S. Brinkman, Sr. Project Manager I

.h '

i

_