ML20078Q523

From kanterella
Jump to navigation Jump to search
Forwards Beaver Valley Power Station Unit 1 Simulator Four Yr Certification Rept 1991-94, as Required by 10CFR55.45(b)(5)(ii) & (b)(5)(vi)
ML20078Q523
Person / Time
Site: Beaver Valley
Issue date: 12/13/1994
From: George Thomas
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20078Q526 List:
References
NUDOCS 9412220229
Download: ML20078Q523 (1)


Text

..

Beaver Valley Power Station imma:^ """~

(412) 643-8069 FAX GEORGE S. THOMAS E$a$'vic1" *"' December 13, 1994 Nuclear Power Division l

l U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Beaver Valley Power Station, Unit 1  ;

Docket No. 50-334, License No. DPR-66 Four Year Simulator Certification Report (10 CFR 55.45) i Gentlemen:

i The purpose of this letter is to submit the Four Year Simulator Certification Report for the Beaver  :

Valley Unit 1 Simulator in accordance with 10 CFR 55.45. Duquesne Light Company, by submitting this report, as required by 10 CFR 55.45 (b)(5)(ii) and (b)(5)(vi), certifies that the Beaver Valley Unit 1 plant referenced simulator has been maintained to meet the Commission's regulations.

Questions concerning this report can be directed to Mr. Thomas Burns, Director, Operations Training at (412) 393-5751.

Sincerely, s yd nf I George S. Thomas l

l l

cc: Director, Office of Nuclear Reactor Regulation l Mr. L.W. Rossbach, Sr. Resident inspector l Mr. T.T. Martin, NRC Region 1 Administrator Mr. G.W. Meyer, Chief, BWR & PWR Sections, Operations Branch Division of Reactor Safety, Region i Mr. G. Edison, Project Manager l

I l

l 9412220229 941213 P,DR T'

ADOCK 05000334 PDn d i w \ ,

.