ML20064H169

From kanterella
Jump to navigation Jump to search
Forwards Beaver Valley Power Station Unit 2,Cycle 5 Startup Physics Test Rept. Results of Test Performed Indicate That Measured Parameters within Specified Acceptance Criteria
ML20064H169
Person / Time
Site: Beaver Valley
Issue date: 03/09/1994
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064H171 List:
References
NUDOCS 9403170178
Download: ML20064H169 (1)


Text

( . - . . .

.1

?.

O .

u Beaver Valley Power Station Sn6ppmgpod. PA 15077 @ 04 l

l 1

JOHN O. SIEBER (412) 333-5255 Senior Vice Pres 4dont and Fox (412) 643-8069 ch t Nuciear offic FMrch 9, 1994 Nuclear Power Dmsson I

U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Cycle 5 Startup Test Report Enclosed is a copy of the Cycle 5 Startup Test Report provided in accordance with Technical Specification 6.9.1.3 Item (1). This report summarizes the applicable physics testing performed to verify the adequacy of the Cycle 5 reload core design. The results of each test performed indicate that the measured parameters are within the specified acceptance criteria.

Sincerely, f

. D. Sieber Enclosure cc: Mr. L. W. Rossbach, Sr. Resident Inspector l Mr. T. T. Martin, NRC Region I Administrator l Mr. G..E. Edison, Project' Manager Mr. W. P..Dornsife, Director BRP/ DER Mr. R. J. Barkanic,.BRP/ DER ]

l l

l

?! 4 n n t-- . ,,

-9403170179 940309 I PDR. ADOCK 05000412  :

P .PDR t !.

I l

!: