.1

?.

O u

Beaver Valley Power Station Sn6ppmgpod. PA 15077 @ 04 1

JOHN O. SIEBER (412) 333-5255 Senior Vice Pres 4dont and Fox (412) 643-8069 ch t Nuciear offic

FMrch 9, 1994 Nuclear Power Dmsson U.

S.

Nuclear Regulatory Commission Attn:

Document Control Desk Washington, DC 20555

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Cycle 5 Startup Test Report Enclosed is a

copy of the Cycle 5 Startup Test Report provided in accordance with Technical Specification 6.9.1.3 Item (1).

This report summarizes the applicable physics testing performed to verify the adequacy of the Cycle 5 reload core design.

The results of each test performed indicate that the measured parameters are within the specified acceptance criteria.

Sincerely, f D.

Sieber Enclosure cc: Mr.

L. W.

Rossbach, Sr. Resident Inspector Mr.

T.

T.

Martin, NRC Region I Administrator Mr.

G..E. Edison, Project' Manager Mr.

W.

P..Dornsife, Director BRP/ DER Mr. R.

J. Barkanic,.BRP/ DER

]

?! 4 n n t--

-9403170179 940309 I

PDR. ADOCK 05000412 P

.PDR t !.

I l

!: