Forwards Beaver Valley Power Station Unit 2 Cycle 4 Startup Physics Test Rept. Results of Each Test Performed Indicated That Increased Parameters within Specified Acceptance Criteria
ML20114B036
Person / Time
Site: Beaver Valley
Issue date: 08/17/1992
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20114B037 List:
References
NUDOCS 9208240303
Download: ML20114B036 (1)


Text

, - _.

- ~.. -.

..... ~ ~. ~. -.

s--..

o g

De r valery r>*er S hiion Shippingport, PA 4077.NO4 (412) 3918.255 Aur,ust 17, 1992 JOHN D SiEBE54 V(e President Nuclear Group U.

S.

Huclear Regalatory Commission.

Attn:

Document Control Desk Washington, DC 20555

Subject:

lleaver Valley Power Station, Unit No. 2 Ducket No. 50-412, Licence No. NPF-73 Cycle 4 Startup Test Report L

l Enclosed io a

copy of the Cycle 4 Startup Test Report provided in l

accordance with Technical Specification 6.9.1.3 Item (2).

This report summarizes the applicable physics testing performed to verify the adequacy of the Cycle 4 reload core design.

The results of each test performed indicated that the increased parameters were within the specified acceptance criteria or were avaluated and determined to be within the available margin.

Sincerely, i

4 1

/4 bbite-

~ ~,

D.

Sieber Enclosure cc:

Mr.

L.

W.

Rossbach, Sr. Resident Inspector Mr.

T.

T.

Martin, NRC Region I Administrator Mr. A.

W.

De Agazio, Project Manager i

Mr. M.

L.

Bowling (VEPCO) g -

l-l l-1 l.

l

~

9208240303 920017 PDR ADOCK 05000412

'~