ML20057A714

From kanterella
Jump to navigation Jump to search
Forwards Bechtel 930910 & 0831 Ltrs Re QA Program Plan & ABWR Licensing Support,Civil/Structural Calculations, Respectively
ML20057A714
Person / Time
Site: 05200001
Issue date: 09/10/1993
From: Fox J
GENERAL ELECTRIC CO.
To: David Tang
NRC
References
NUDOCS 9309150199
Download: ML20057A714 (3)


Text

-

J

w 10 % 03
enusc,.nce -,
e. v3 d

GENixiewEnergy 7

i ABWR l

Date 9/oh3 l

NYS pac T ng 7

This page plus ?-

page(s)

From J o e l 's o x Maii code, e2_

175 Curtner Avenue San Jose, CA 95125 Phone (408)925 4 87-4 FAX (408)925-1193 or (408) 925-1687 Subject Be ek k \\'s a /a i

Message a

le llo v a tek kmow wk c1 w.

f o- ~

orchmed.

is 7

l 9309150199 930910 f'

PDR ADOCK 05200001 F.

PDR Ly 1

A

sre n.mme m ma w

  • Bechtel O Beate St ccr h"an frencisco. CA 94105 1835 Ocihng scoress. PO Dax 193965 San Francisca CA 94119 396S September 10, 1993 BLG-6 /@

y Mr.

J.F. Quirk M/C 441 General Electric Nuc1c ar Energy 175 Curtner Avenue San Jose, CA 95125

Subject:

DOE Advanced Reactor Program (ABWR)

GE Purchase Order 190-ALWR-31387 Bechtel Job No. 18775-014 Quality Assurance Program Plan

Reference:

P. Novak telephone request of 09/10/93.

Dear Mr. Quirk:

Thin. letter is in response to the reference conversation and, as f

requested, confirms the following points:

I 6f i.

The-Bechtel work supporting safety related items in the ABWR Standard Safety Analysis Report (SSAR) are in compliance With the project Nuclear Quality Assurance Plan and Bechtel Nuclear Quality Assurance Manual,in compliance with 10CFR50 Appendix B requirements.

ii.

Engineering is controlled through the use of Standard EDPs (Engineering Department Procedures) which implement 10CFR50 Appendix B requirementn.

iii. The calculations supporting the SSAR have been checked and g

audits conducted to verify their technical content and conformance to applicable engineering procedures and QA requirements.

Early preliminary studies have been reworked for the SSAR submittals.

Shduld you need further information or clarification on the above matters, picanc do not hesitato to call, very truly yours, B. A TA F E.A.

Goldenberg cc:

P. Novak Project Manager EAG/MPL/BAP l

419 x i g xi.mitTas \\ nLc.100 Bethlel Power Corporation s

l}&O' '

5 0 SE P 1 0 *91: 0 3:-t T ti 4 Y lF1"L 6 # lILI E 1 PF. f 3 I

I

'.Bechtel

'50 LGate Street San frtvcsca CA 941051f195 lMofng actoress: PQ Bak 1939(%

San Frarcsca CA 94119 3965 August 33, 1993

' i j BLG-b96 Mr.

J.P. Quirk

(

M/C 441 Concral Electric Nuclear Energy 175 Curtner Avenue San Jonc, CA 95125

Subject:

DOE Advanced Roactor Program (ABWR)

GE Purchase Order 190-ALWR-31387 Bechtel Job No. 18775-014 ABWR:

ABWR Licensing Support Civil / Structural Calculations i Refcrences:

(1)

Bechtel Letter to GE BLG-0095 dated August 17, 1993 i

e

Dear Mr. Quirk:

This is to document that the Civil / Structural calculations for the Licensing support of the ABWR project have been performed in accordance wit.h the Dechtel QA Project Procedures Manual.

An internal QA/ technical audit has been performed to verify compliance with project procedural and QA renuirements.

The calculations are available for innpection at the ABWR project office in Bechtel.

I Please ca)) un if there are any questions.

very truly yours, h-

- =*

B. A. Posta Project Engineer cc:

G.

Ehlert A.

S.

Liu

@BechtelPowerCorporation 00 g x:vsmuesmc.on 40