ML20086A565
| ML20086A565 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 11/05/1991 |
| From: | Sieber J DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20086A569 | List: |
| References | |
| NUDOCS 9111190238 | |
| Download: ML20086A565 (1) | |
Text
,
Beaver Voitey Power Stabon Shippingport PA 15077-0004 (412) 393-5255 JOHN D SIEBER Vice Prescent. Nuclear Group November 5, 1991 U.
S.
Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Subject:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Cycle 9 Startup Test Report Enclosed is a copy of the Cycle 9 Startup Test Report provided in accordance with Technical Specification 6.9.1.3 Item (2).
This report summarizes the applicable physics testing performed to verify the adequacy of the Cycle 9 reload core design.
The results of each test performed indicated that the measured parameters either were within the specified acceptance criteria or were evaluated and determined to be within the available margin.
Sincerely, J&cg
. (bwy,k.
/
Q I.
D'.
Sieber Enclosure cc:
Mr.
J.
Beall, Sr. Resident Inspector Mr. T. T. Martin, NRC Region I Administrator Mr.
A. W.
DeAgazio, Project Manager 10' h
/
\\\\\\
s
'o
/
0111190238 #111DU
- igja (4 DOCK 05000334 PDn
.p
. ~.. - ~..
_-