Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Discusses Problems W/Monitor Well". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20127K567  + (Discusses Problem W/Stainless Steel Cladding in Reactor Vessel Base Metal)
  • ML20205P076  + (Discusses Problem in Licensee Fire Watch Program)
  • ML20215N019  + (Discusses Problem of Adequate Plant Design for Earthquakes. Seismic Design Must Be Supported by Applicant in Writing. ACRS Subcommittee May Recommend No Oct Full Committee Meeting Due to Lack of Final Position Re Seismic Design)
  • ML20041A927  + (Discusses Problem of Comparison of Releases of short-lived Nuclide Such as Ra-226 Against EPA Std.Issue Is Whether Toxicity Index for Ra-226 Includes Effects of Daughters or Whether Daughters Are to Be Treated as Other Nuclides)
  • ML20199G267  + (Discusses Problem of Inservice Insp of LWR Pressure Vessels. Limited Openings in Biological Shieldwall Around Pipings Welded to Reactor Pressure Vessel Nozzles Do Not Allow Manual Surface Exam of Weldment)
  • ML20133H439  + (Discusses Problem of Transportation of Special Nuclear Material)
  • ML20024B534  + (Discusses Problem of once-through Steam Generator Dry Out in 1-2 Minutes Following Loss of Feedwater.New Safety Criteria Requiring All Plants to Have Turbine Trip Initiated by Loss of Feedwater Indication Recommended Solution)
  • ML20044G006  + (Discusses Problem w/CONTEMPT28.Determines That Calculations Made W/Sun Workstation Version of CONTEMPT28 Incorrectly Ends at 214.7 of Transient Time)
  • ML20091E526  + (Discusses Problems Associated W/Const of Plant.Major Industries in Area Oppose High Costs & Call for Abandonment of Project)
  • ML19275A162  + (Discusses Problems Associated W/Preparation of Ler.Cannot Assure That BWR Reactor Shutdown Sys Would Protect Against Transient Caused by Dropped Rod During Startup)
  • ML19224C166  + (Discusses Problems Encountered W/Overheating of Low & High Pressure Injection Pumps When Auxiliary Feedwater Sys Is Started)
  • ML20053D240  + (Discusses Problems Encountered W/Teledyne Independent Review of Facility Design & Const)
  • ML20117A177  + (Discusses Problems Experienced W/Cracking in Covers for Exide Battery Jars.Util Planning to Install Temporary Class 1E Battery Bank to Allow Online Replacement of Batteries, Per GL 86-10 Re Fire Protection Requirements)
  • ML19241B893  + (Discusses Problems Experienced W/Pipe Support Baseline Design,As Outlined in IE Bulletin 79-02 & Transmitted to ASLB on 781207.Criteria for Design of Steel Embedments Prevents Problems Occurring)
  • ML19221A238  + (Discusses Problems Identified at B&W Facilities Re TMI Occurrence.Identified Problems Include Pressurizer Level Instrumentation,Integrated Control Sys & Lack of Hydrogen)
  • ML20132G840  + (Discusses Problems Re Annual Matl Fee Invoice for NRC Registry of Radioactive Sealed Sources & Devices NR-109-D-104-G & NR-109-D-110-B)
  • ML20002B697  + (Discusses Problems Re BWR Scram Sys.Item 2 of Ltr to BWR Licensees Should Be Revised)
  • ML20010E856  + (Discusses Problems Re Facility Staffing,Atmospheric Dispension,Hydrogen & Sys Interactions)
  • ML20032B207  + (Discusses Problems Re NRC Document Request Directed to CA Governor Brown.Substantial Progress Must Be Made Soon to Avoid ASLB Intervention)
  • ML16340C368  + (Discusses Problems Re Rl Cloud & PG&E Seismic Reverification Program.Proposes Meetings to Discuss Subj.Info Re Auxiliary Bldg Weight Reconciliation Encl)
  • ML20114E794  + (Discusses Problems Relating to QC of Welding,Defective Welds Experienced at Facility in CR Drive Hydraulic Sys Penetrations Through Dry Well & in Some Reactor Pressure Vessel Internals)
  • ML20101U086  + (Discusses Problems Requiring Resolution Before Submittal of License Amend Request Re Setpoint Reevaluation Program.Tech Spec Amend Request Will Be Submitted by 850308)
  • ML20211C815  + (Discusses Problems W/Enforcement of Reg Guides,Per Kewaunee Situation Re Security Insp Indicating Reg Guide 1.17 Not Met.Suggested Actions Listed)
  • ML20198P353  + (Discusses Problems W/Environ Part of package.Nine-page Environ Assessment Must Be Issued at Same Time as Finding of No Significant Impact.Related Info Encl)
  • ML19305D956  + (Discusses Problems W/Implementation of Lessons Learned Task Force Recommendation Re Automatic Initiation of Auxiliary Feedwaters Sys.Requests NRC Concurrence W/Plan for Implementing Requirement During 1980 Refueling Outage)
  • ML20128G498  + (Discusses Problems W/Northeast Util Nuclear Reactors in Connecticut)
  • ML20024C796  + (Discusses Problems W/Operator Licensing Exams of ltr- Designated Individual Vv)
  • ML20083M935  + (Discusses Problems W/Pcrv Prestressing Sys & Resultant Insp Test Results.Liftoff Tests Show Tendon Sys Operable.Nrc Permission to Return to Power Operation from Present Refueling Outage Requested by 840418)
  • ML20234B636  + (Discusses Problems W/Pg&E Proposed Reactor on Bodega Head, Including Putting Site on Fault Line & Devaluating Property. Suggests to Put Plant Along Peninsula Ocean Shore)
  • ML20076E143  + (Discusses Problems W/Recent Evacuation Training & Emergency Plan Workability)
  • ML18051B327  + (Discusses Problems W/Recent Exxon Nuclear LOCA-ECCS Analysis on Westinghouse Plants.Neither Problem Affects Plant LOCA-ECCS Analysis.Questions Resolved)
  • ML19319C027  + (Discusses Problems W/Relative Concentration Values of Site Meteorological Data.Requests Submittal of Aug 1975-76 Data W/Recovery Greater than 90% in Form of Joint Frequency Wind Speed & Direction Distributions.Info Due within 45 Days)
  • ML19249A156  + (Discusses Problems W/Transfer of Us Nuclear,Inc Records to American Nuclear Insurers)
  • ML19241B339  + (Discusses Problems in Jt Long 780613 Memo Re Alleged Thefts or Diversions of Strategic Snm.Majority of Relevant Threat Info,Compiled by Jh Coran,Was Not Used)
  • ML20024A940  + (Discusses Problems in Preparation of Jcp&L Proposal.Jcp&L Proposal Should Be Strictly Their Own W/Min Cross Ref to Met Ed)
  • ML20069F925  + (Discusses Problems of Augmenting Operating Staff W/ Previously Licensed Reactor Operators.Resumes of Five Individuals Encl)
  • ML20072G413  + (Discusses Problems w/post-accident Sampling Sys (PASS) microprocessor,on-line Ph Meter Sample Flow & Ion Chromatograph.Proposed PASS Completion Per NUREG-0737,Item II.B.3,scheduled for 830930)
  • ML20136C293  + (Discusses Problems with Monitor Well)
  • SNRC-1226, Discusses Procedural Change Re Technical Support Ctr Plant Process Historical Data Log.Printing of SPDS Data on Demand Only Allowed Upon Receipt of External Event Signal  + (Discusses Procedural Change Re Technical Support Ctr Plant Process Historical Data Log.Printing of SPDS Data on Demand Only Allowed Upon Receipt of External Event Signal)
  • ML19326D454  + (Discusses Procedural Changes in Initial CP or OL Applications & Amends.Changes Adopted & Incorporated as Amends to 10CFR2,10CFR51,effective 760517.FR Notice & Updated Svc Lists Encl)
  • 1CAN038905, Discusses Procedural Guidance for Conducting Gross Leak Testing of Valves in HPI Sys Discharge Piping.Util Proposes to Amend Procedure to Instruct Operator to Observe Gauge Pressure Reading for 1 Minute While Conducting Test  + (Discusses Procedural Guidance for Conducting Gross Leak Testing of Valves in HPI Sys Discharge Piping.Util Proposes to Amend Procedure to Instruct Operator to Observe Gauge Pressure Reading for 1 Minute While Conducting Test)
  • ML20140B788  + (Discusses Procedural Mechanisms for Backfitting.Survey of Mechanisms,Used as Input to Tables I,Ii & III of Attachment to CRGR Charter Encl)
  • ML20126G877  + (Discusses Procedural Requirements for Restart.Licensee Request for Restart Should Be Processed as License Amend. Forwards Notation Paper.W/O Paper.Related Info Encl)
  • ML20094R135  + (Discusses Procedural non-compliance & Administrative Controls Deviation in Accordance W/Nc State Univ Pulstar Facility TS 6.7.3 (D))
  • ML19269C244  + (Discusses Procedure for 2-year Extension of Preliminary Design approval-5 for Turbine Island Application & Associated Fee Calculation.Requests Evaluations by 790315 for Specific Items Identified in Encl)
  • ML19289F832  + (Discusses Procedure for Coordinating DOT Safety Insp of Vehicles Transporting TMI Radwaste.Info Partially Withheld:Home Telephone Numbers (Ref FOIA Exemption 6))
  • ML19347C900  + (Discusses Procedure for Fee Determination.Upon Completion of Review of 810218 Request for Route Approval,Nrc Will Notify Licensee Re Fee Due)
  • ML19322C446  + (Discusses Procedure for Feedback of Info & Data from Div of Operating Reactors to Licensing Reviews)
  • ML19253A366  + (Discusses Procedure for Info Requests from Util)
  • ML20005A164  + (Discusses Procedure for Intervention in OL Application,In Response to)