Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20107C178 + (Discusses Oyster Creek Incore Monitor Housing Penetration Leak)
- ML20096D015 + (Discusses P Blockey-OBrien 10CFR2.206 Petition & Ltrs Written to NRC & ASLB Judges Re Petition & Georgia Tech Neely Nuclear Research Reactor,Radioactive Contamination, Violations & ALARA Issue)
- ML20082S063 + (Discusses P Blockey-OBrien 2.206 Petition in Front of NRC Requesting License Withdrawal,Shutdown,Removal of Radioactive Matl,Cleanup of Site & Surrounding Area,Etc,Etc at Neely Nuclear Research Ctr & Reactor on Ga Tech Campus)
- ML20205E840 + (Discusses P Burke Layoff from Millstone Nuclear Power Plant)
- ML19209A996 + (Discusses P Carrick 790907 Petition to Intervene.P Carrick Wishes to Participate Per 10CFR2.715(a))
- ML19332E646 + (Discusses PA Dept of Environ Resources Insp Rept 50-334/PA-89-01 on 891016.No Violations or Deviations Noted. Major Areas Inspected:Low Level Radwaste Shipment to Burial Site,Vehicle Insp & Radiation & Contamination Surveys)
- ML20234C132 + (Discusses PG&E Application for CP to Construct Reactor at Bodega Bay.Usgs Rept Will Be Forwarded.Application Still Pending Before Commission)
- ML16343A536 + (Discusses PG&E Request That WCAP-14707,Rev 1, Model 51 SG Limited Tube Support Plate Displacement Analysis for Dented or Packed Tube to Tube Support Plate Crevices, Be Withheld. Grants Request & Info Will Be Withheld from Public)
- ML16343A700 + (Discusses PG&E Request for Exemption from Technical Requirements of Section Iii.J of App R to 10CFR50 to Extent That It Requires Emergency Lighting Units w/8 H Battery Power Supply Be Provided for Access & Egress Routes)
- ML16341C374 + (Discusses PG&E Study of Possible Adverse Interactions of Nonsafety Sys on Plant Safety as Result of Earthquake.Util Examination of Interactions Is Suitable & Provides Addl Assurance Re Plant Ability to Withstand Earthquake)
- ML20027B956 + (Discusses PNA-80-039 Re Overexposures of Patients Receiving I-125 Seed Therapy for Prostate Cancer at St Joseph Hosp, Albuquerque,Nm.Computer Program Error Cited as Contributing Factor)
- PY-CEI-NRR-2083, Discusses PNPPs Intent of Transfer Responsibility for Review & Approval of Procurement Documents to Centerior Supply Chain Organization.Justification & Basis Concluding That Change Satisfies 10CFR50,App B & TS Criteria Attached + (Discusses PNPPs Intent of Transfer Responsibility for Review & Approval of Procurement Documents to Centerior Supply Chain Organization.Justification & Basis Concluding That Change Satisfies 10CFR50,App B & TS Criteria Attached)
- ML20153B914 + (Discusses POTW Radiation Guidance Document)
- ML17158C183 + (Discusses PPL Changes to Bases of Sses,Units 1 & 2 Tss. Changes Revise Existing Bases B 3/4 7.6 to Add Definition of Continuous Firewatch & Hourly Firewatch Patrols)
- ML20205M265 + (Discusses PPR Completed 990201.Advises of Planned Insp Effort Resulting from Catawba PPR Review.Forwards Plant Issues Matrix & Insp Plan)
- ML18012A218 + (Discusses PPR of Harris Conducted on 960229.PPR Involved Participation of Technical Divisions in Evaluating Insp Results & Safety Performance Information for Oct 1995 to Feb 1996)
- IA-86-586, Discusses PRA Analysis.Nrc Worked W/Idcor to Develop Methodology Less Expensive & Time Consuming than Full Pra. Methodology Will Be Applied to Specific Plants,Following NRC Review & Approval + (Discusses PRA Analysis.Nrc Worked W/Idcor to Develop Methodology Less Expensive & Time Consuming than Full Pra. Methodology Will Be Applied to Specific Plants,Following NRC Review & Approval)
- ML20211H661 + (Discusses PRA Analysis.Nrc Worked W/Idcor to Develop Methodology Less Expensive & Time Consuming than Full Pra. Methodology Will Be Applied to Specific Plants,Following NRC Review & Approval)
- NUREG/CR-2815, Discusses PRA Guidance Documents NUREG/CR-2815 & NUREG/CR-3485.Recasting of Documents in SRP or Reg Guide Formats Recommended Upon Receipt of Public Comments If Documents Reflect Agency Views + (Discusses PRA Guidance Documents NUREG/CR-2815 & NUREG/CR-3485.Recasting of Documents in SRP or Reg Guide Formats Recommended Upon Receipt of Public Comments If Documents Reflect Agency Views)
- ML19220A901 + (Discusses PSAR Treatment of Iodine Removal Thyroid Dose During Loca.Mods Under Consideration Include Recirculating Filter Sys & Reducing Design Basis Leak Rate)
- ML19341A221 + (Discusses PSC of Wi Process for Review & Assessment of Economic & Environ Impact of Proposed Alternative Actions & of Generating Replacement Power.Forwards Application for Steam Generator Replacement)
- ML19341A222 + (Discusses PSC of Wi Process for Review & Assessment of Economic & Environ Impact of Proposed Alternative Actions & of Generating Replacement Power.Forwards Application for Steam Generator Replacement)
- ML20064J038 + (Discusses PSEG Decision of 781219 to Cancel Contract to Purchase 4 Floating Nuc Pwr Plants from Ops.Decision Is Based on Anticipated Growth Rates;The Units Will Not Be Needed on the Dates Originally Thought)
- ML17333A367 + (Discusses PWSCC Crack Growth Rates Used in Analysis of CRD Penetrations at Plant.Resolves Questions About Structural Integrity Analysis Performed by W in Favor of Method Used by W But Notes Crack Growth Rate Not Critical to Safety)
- ML20140D531 + (Discusses Pacific Northwest Natl Lab 961204 Rept PNNL-11419, Rept on Evaluation of Tritium Producing Burnable Absorber Rod Test Assembly. Evaluation of DOE Responses to 970103 RAI Re Quality Assurance,Encl)
- ML20127J705 + (Discusses Package Concurrence Re Adding Language in Stated Memo)
- ML20102B368 + (Discusses Package Re Hydrostatic Test Pressure of Svc Water Sys.Explanation Requested for Test Pressure Being Dropped to 110 Psig)
- ML20125B033 + (Discusses Packaging & Transport of TMI-2 Containment Bldg Waste Water Samples.Samples Packaged & Transported According to NRC & DOE Regulations)
- ML20128M371 + (Discusses Packaging QA Plan & Requests That Vendor Be Reclassified as User Only of Stated Packaging Retroactive to 911126 Based on Stated Reasons)
- ML20245J689 + (Discusses Packing Nuts on 1 Inch UF6 Cylinder Valves & Informs of Change in Personnel)
- ML20135E236 + (Discusses Paducah Certificate Amend Request & Definition of Completion Times)
- ML20132E951 + (Discusses Page 2 of 961114 Notification Ltr Re Shipment of 41 + 41 Drums Containing UO2 Pelltes,Scheduled for First Wk of Dec 1996)
- ML20149M238 + (Discusses Page B1 of Hartford Courant Re Investigator to Look Into NRC Attitude)
- ML20083C048 + (Discusses Pages 12-13 of ALAB-753 Re Use of Watertight in Section 3.4.1 of Fsar.Licensee Agrees W/Assumption That Inconsistencies Arising Are Semantic & Inadvertent.Applicant Will Submit Clarifying Amend to FSAR Per Aslab Direction)
- ML20134A673 + (Discusses Palladino Testimony at 840223 Budget Hearing & J Curtis Desire for Amplification of Staffs Views on Implementation of Section 84c of Atomic Energy Act. Section 84c Encl)
- ML20072H566 + (Discusses Palmetto Alliance Notices of Depositions.Some Individuals Unavailable on Dates Proposed.Related Correspondence)
- ML20038B987 + (Discusses Paperwork Reduction Act of 1980 Requirement on NRC)
- ML20008E763 + (Discusses Paperwork Reduction Act of 1980 Effect on Nrc.Act Consolidates Control Over Federal Paperwork in Omb,Subjs Significant Paperwork Requests to Test & Establishes Federal Info Locator Sys.Act & Detailed Evaluation Encl)
- ML20028H618 + (Discusses Paragraph 3 of Article 2 of Agreement for Cooperation Between Govt of Us & Govt of Japan Re Peaceful Uses of Nuclear Energy Signed at Tokyo on 871104)
- ML20135A729 + (Discusses Paragraph H.3(b & C) of Contract NRC-26-95-273. Resume of George Forwarded for Review & Approval.W/O Encl)
- ML20210N268 + (Discusses Paritially Withheld Chairman Briefing by Ceco on 951116)
- ML20134G905 + (Discusses Part 21 Evaluation of Deficient Energy Absorbing Matl.Deficient Matl Mfg Using Process A. Deficient Matl Isolated Case)
- ML20214P574 + (Discusses Part 21 Rept Re Defective Ga Co Control Rod Sys. Interlock Will Not Prevent Operation in Pulsing Mode at Steady State)
- ML20129H473 + (Discusses Part 21 Rept Re Supply of Wrong Matls for Fabrication of Supports Used at Project.Aisi 1035 & 1045 Chemistry Matls Supplied by Cleveland City Forge & Unidentified Supplier.Astm A668 Class C Matl Specified)
- ML20083L625 + (Discusses Part 21 Rept Re Ue&C Design of Structural Steel at Facility.Generic Implications Appear to Be Nonexistent Since No Similar Design Concept Used at Other Facilities.Two Oversize Drawings Encl.Aperture Cards in Central Files)
- ML19290C122 + (Discusses Part 21 Repts Re Overpressurization of Containment in PWR Plant After Steam Line Break.Will Determine Effects of Emergency Feedwater Sys on Containment Pressure & Review Generic Aspects on PWRs)
- ML20236X046 + (Discusses Part 72 Miscellanous Items - Reply)
- NPL-98-0895, Discusses Part Length CRDM Housing Issue at Plant + (Discusses Part Length CRDM Housing Issue at Plant)
- ML20216D836 + (Discusses Part Length CRDM Housing Issue Problem Investigation Process 0-M98-0647.No Further Actions Were Judged to Be Necessary for Meeting Intent of Enhanced Leakage Monitoring Due to Elevated Attention to Monitoring)
- ML20024C639 + (Discusses Part Rept Re Potential for Loss of Ground within Ni/Rps Detection.Corrective Actions Described in Encl, 177 FA Plants Nuclear Instrumentation/Reactor Protection Sys Ground Problem Discussion & Recommended Test Scheme)
- ML20128G348 + (Discusses Partially Withheld Insp Repts 50-424/90-19 & 50-425/90-19 & Forwards NOV & Demands for Info)