TRANSFER OF LEAD RESPONSIBILITY j,
JUN 6 1974 Date:
Serial No.: R0-C60-74-7 2
To_
K. R. Goller, Assistant Director for Operating Reactors, L i
Subject:
Incore Monitor Housing Penetration Leak Facility:- Oyster Creek - Docket No. 50-219
_. Responsible R0 Branch Chief:
K. V. Seyfrit a
Description of Item Requiring Resolution:
4 On May 30,-1974, the licensee reported that leakage between an incore monitor housing and the reactor vessel was detected. Leakage was originally indicated on May 28,_1974 during a scheduled hydrostatic test of the-reactor vessel.
On May 29, 1974, a second hydrostatic test was conducted at which time it was determined that the leakage was coming from an incore monitor housing. This indicates a failure of the weld at the inner surface of the vessel-to-housing weld. The licensee has the event under review and has held discussions with the nuc1 car steam supplier and the vessel nanufacturer.
. Repairs will be made by the licensee when their investigation is complete.
i R0 Recot:mendations and Proposed Course of Action:
i 1.
The Directorate of Regulatory Operations will examine the required repairs to verify that they are made in accordance with code require-ments and qualified procedures.
2.
The Directorate of Licensing will review and evaluate the licensee's report describing their investigation, the repairs and their rationale for resuming operation.
3.
The Directorate of Licensing will determine the need to impose any increases in surveillance requirements or changes to technical speci-fications which may be required.
4.
The Directorate of Regulatory Operations will review the results of any additional surveillance requirements which may be imposed.
5.
The Directorate of Licensing will evaluate this failure with respect to possible generic implications.
-Concurrence:
YY S hA$
$/$fM K. R. Goller, Assistant Director for Operating Reactors, L Dat6
')
_/
.h;9.1 - M
,i s'
,', (
/3 Mf B. H. Grier, Assistant Director for Construction and Date Operation,_R0 9604170256 960213 PDR FOIA DEKOK95-258 PDR
/
.. ~ ~ - ~ ~ - -
-.. ~,..
4 f'=.
.o O
i.,
a M0 N
TRANSFER OF LEAD RESPONSIBILITY' 2-i ec: D. F. Knuth, R0 A. Giambusso, L J. G. Davis, RO J. M. Hendrie, L R.-C. DeYoung, L V. A. Moore, L
.D.
L. Ziemann, L F. Anderson, L i
K. V, Seyf rit, RO G. W. Reinmuth, RO M. S. Hildreth, R0 H. D.- Thornburg, RO J. P. O'Reilly, RO:I N. C. Moseley, RO:II J. G. Keppler, RO:III E. M. Howard, RO:IV R. H. Engelken, RO:V i
n 8
s i...
4 4-6 9
h
J V o I C. d i V0 h '
w
\\ )b[
t y
wa CF IJAD RggP088IAILITY Date:
4,.dI,-7j/.
p.g m [g [p Bertal No.: 20 4.60-74-7 E. R. Go11er, Assistant Director for Operating Rasetors, L Joo Sub. lect:
Incore Monitor Housing Penetration Laak i
Facility: Oyster Creek - Docket No. 50-219 j
Responsible R0 Branch Chief:
K. V. geyfrit j
Description of Itm Requiring Resolution:
1 l
On May 30, 1974, the licensee reported that leakage between an incoru monitor housing and the reactor vessel was detected. Lankage was originally indicated on May 28, 1974 during a schad=1.a hydrostatic test of the reactor On May 29,1974, a second hydrostatic test was conducted at which vessel.
l time it was determined that the leakage was c=ing from an incore monitor nis indicates a failure of the weld at the inner surface of the housing.
The licenses has the event under reviar and has vessel-to4iousing weld.
beld discussions with'the n\\Tclear stamm supplier and the vessel manufacturer. ~
j Repairs will be made by the licenses when their investigation is complate.
j 20 Reconseadations and Proposed Course of Actions f
The Directorate of Regulatory Operations will essaine the required f
1.
l repairs to verify that they are made in accordance with code require-ments and spatified procedures.
i The Directorate of Licensing will review sad evaluate the licenste's l
2.
report describing their investigation, the repairs and their rationale l
for resuming operation. R.0T
.4 fewest tWr we#t 4% Wucesse, l
l 3.
The Directorate of Licensing will determine the need to impose any I
increases in surveillance requirements or changes to teelmfcal speci-I l
fications which anay ha required.
?
4.
He Directorate of Reguintory Operations will revisar the results of any additional surveillance requirements skidt may be imposed.
r i
5.
The Directorate of Licensing will evaluate this failuru with respect to possible generic implications.
Concurrence:
\\
K / # du JL C/rh+
L R. Goller, Assistant Director for Operating Reactors, L Datt if
/l,,',,". [
l,
, t. :
- 3. M. Grier, assistant Director for Construcaima and pate
, Operation, RO b