Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24267A064 + (Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395))
- ML24267A054 + (Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395))
- ML24267A059 + (Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395))
- ML24221A211 + (Clarification Regarding Area of Potential Effect for the Subsequent Operating License Renewal for Virgil C. Summer Nuclear Station Fairfield County, South Carolina (SHPO Project Number: 22-EJ0147) (Docket Number: 50-395))
- RS-06-107, Clarification Regarding Backup Stability Protection Methodology + (Clarification Regarding Backup Stability Protection Methodology)
- ML060680239 + (Clarification Regarding Commitment Associated with License Amendment Request for Extension of Diesel Generator Completion Time)
- ML031270454 + (Clarification Regarding Emergency Feedwater Safety Evaluation Dated June 11, 2002 Oconee UFSAR Section 10.4.7)
- HBL-21-017, Clarification Regarding Final Status Survey Report for Humboldt Bay Power Plant + (Clarification Regarding Final Status Survey Report for Humboldt Bay Power Plant)
- ML092290359 + (Clarification Regarding H* Parc)
- SBK-L-09204, Clarification Regarding How Information in WCAP-17071-P, H*: Alternate Repair Criteria for Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F), Meets Considerations of 10 CFR 2.390(b) + (Clarification Regarding How Information in WCAP-17071-P, H*: Alternate Repair Criteria for Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model F), Meets Considerations of 10 CFR 2.390(b))
- NLS2002063, Clarification Regarding Inspections and Reports for Core Spray Sparger Piping for Cooper Nuclear Station + (Clarification Regarding Inspections and Reports for Core Spray Sparger Piping for Cooper Nuclear Station)
- RS-09-155, Clarification Regarding License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time + (Clarification Regarding License Amendment Request for a One-Time Extension of the Essential Service Water Train Completion Time)
- L-2003-260, Clarification Regarding NDE Examinations for the Risk Informed Inservice Inspection Relief Request + (Clarification Regarding NDE Examinations for the Risk Informed Inservice Inspection Relief Request)
- ML033040149 + (Clarification Regarding Relief Request Concerning risk-informed Inservice Inspection)
- ML023520168 + (Clarification Regarding Request for Additional Information to 60-Day Response to NRC Bulletin 2002-01 Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity)
- L-12-351, Clarification Regarding Response to Request for Additional Information Related to Request for Alternative Examination Requirements for American Society of Mechanical Engineers (ASME) Class 1 Piping Welds + (Clarification Regarding Response to Request for Additional Information Related to Request for Alternative Examination Requirements for American Society of Mechanical Engineers (ASME) Class 1 Piping Welds)
- ML060660387 + (Clarification Regarding Use of Supplemental Responders and Commitment to Incorporate Number of Supplemental Responders in the Security Plan)
- GO2-06-029, Clarification Regarding a Commitment Associated with the License Amendment Request for Extension of Diesel Generator Completion Time + (Clarification Regarding a Commitment Associated with the License Amendment Request for Extension of Diesel Generator Completion Time)
- ML23352A196 + (Clarification Regarding the Accepted Versions of Nedc 33376P, Revision 4, LANCR02 Lattice Physics Model Description, NEDC-33377P, Revision 4, LANCR02 Lattice Physics Model Qualification Report, and NEDC-33935P, Revision 0, LANCR02/PANAC11 a)
- RS-13-219, Clarification Regarding the Inservice Testing of Dresden Nuclear Power Station High Pressure Coolant Injection (HPCI) Valves 2(3)-2301-32-SO + (Clarification Regarding the Inservice Testing of Dresden Nuclear Power Station High Pressure Coolant Injection (HPCI) Valves 2(3)-2301-32-SO)
- ML100470320 + (Clarification Regarding the Number of Tritium Producing Burnable Absorber Rods in Operating Cycle 10 and Program Update)
- RS-13-164, Clarification Regarding the Testing Frequency for Fifth Inservice Testing Interval Relief Request RV-23H + (Clarification Regarding the Testing Frequency for Fifth Inservice Testing Interval Relief Request RV-23H)
- NLS2002018, Clarification Related to NRC Inspection Report 50-298/0112 + (Clarification Related to NRC Inspection Report 50-298/0112)
- L-06-011, Clarification Related to the Firstenergy Nuclear Operating Company Request for Authorization to Use Delta Protection Supplied-Air Containment Suits as Respiratory Protection Equipment and Assignment of a Protection Factor + (Clarification Related to the Firstenergy Nuclear Operating Company Request for Authorization to Use Delta Protection Supplied-Air Containment Suits as Respiratory Protection Equipment and Assignment of a Protection Factor)
- ML102440139 + (Clarification Requested (Ihpb) Extended Power Uprate License Amendment Request)
- ML24289A204 + (Clarification Responses)
- ML25133A100 + (Clarification Restart Memo)
- ML25133A100 + (Clarification Restart Memo)
- ML19199A419 + (Clarification Warranted to Ensure Orderly Administration of Industrial Security Plan & Aircraft Hazard Analysis Review)
- ML24199A001 + (Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2))
- ML23194A044 + (Clarification for Indian Point Energy Center License Amendment Request, Independent Spent Fuel Storage Installation Physical Security Plan)
- NRC-23-0061, Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water.. + (Clarification for NRC-23-0059, Response to Request for Additional Information for Exigent License Amendment Request for Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/Emergency Equipment Service Water..)
- NRC-23-0072, Clarification for RAI Response from 10-16-23 Phone Call Regarding Exigent License Amendment Request for Exigent License Amendment Request for Technical Specification 3.8.1, AC Sources - Operating - in Relation to Mechanical Draft Cool + (Clarification for RAI Response from 10-16-23 Phone Call Regarding Exigent License Amendment Request for Exigent License Amendment Request for Technical Specification 3.8.1, AC Sources - Operating - in Relation to Mechanical Draft Cool)
- ML102950145 + (Clarification for Relief Request RR-04-06)
- ML11215A128 + (Clarification for Request for Additional Information, Aging Management Programs)
- NRC-24-0002, Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12 + (Clarification for Request for Additional Information Responses for License Amendment Request to Revise Technical Specification 3.8.1, AC Sources - Operating, Surveillance Requirement SR 3.8.1.12)
- NL-11-101, Clarification for Request for Additional Information (RAI) Aging Management Programs + (Clarification for Request for Additional Information (RAI) Aging Management Programs)
- SBK-L-12247, Clarification for Response to Follow Up RAI B.2.1.31-1 Item (b)(2) Provided in SBK-L-12217, November 2, 2012 + (Clarification for Response to Follow Up RAI B.2.1.31-1 Item (b)(2) Provided in SBK-L-12217, November 2, 2012)
- ML18219C148 + (Clarification for Response to IE Bulletin 77-02 Transmitted with Letter of 11/10/1977)
- L-2006-216, Clarification for St. Lucie Response to Generic Letter 2006-03 + (Clarification for St. Lucie Response to Generic Letter 2006-03)
- ML062680162 + (Clarification for St. Lucie Response to Generic Letter 2006-03)
- ML082730056 + (Clarification for Sump Buffer Amendment)
- Information Notice 1993-14, Clarification of 10 CFR 40.22, Small Quantities of Source Material + (Clarification of 10 CFR 40.22, Small Quantities of Source Material)
- RIS 2016-04, Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use + (Clarification of 10 CFR 50.46 Reporting Requirements and Recent Issues Identified with Guidance Not Approved for Use)
- ML043210174 + (Clarification of 60-Day Response to Bulletin 2004-01, Inspection of Alloy 82/182/600 Materials Used in the Fabrication of Pressurizer Penetrations and Steam Space Piping Connections at Pressurized-Water Reactors)
- L-2012-247, Clarification of 60-Day Response to March 12, 2012 10 CFR 50.54(f) Request for Information + (Clarification of 60-Day Response to March 12, 2012 10 CFR 50.54(f) Request for Information)
- ML19274E636 + (Clarification of 790302 Answer Opposing Intervenors Motion for Protective Order.Stipulation at Issue Does Not Require NRC to Raise Specific Objections After Reasonable Time.Nrc Will Provide Info on Voluntary Basis)
- ML092530024 + (Clarification of 8/25/2009 Meeting Summary Regarding Florida Power & Light Companys (FPL) Upcoming Extended Power Uprate License Amendment Request)
- ML20031B161 + (Clarification of 810112 Application for Certificate of Compliance 5641,Revision 2)
- ML20079F735 + (Clarification of 831223 Response to Applicant Identification of Issues & Proposal to Establish Hearing Schedule. Clarification Not Intended as Summary of Case.Certificate of Svc Encl)
- PMNS20180480, Clarification of AMP Changes for Seabrook License Renewal + (Clarification of AMP Changes for Seabrook License Renewal)
- ML20063D116 + (Clarification of ASLB 820817 Order & Conference Call. Discussion of Brochure Inadequate W/O Discussion of Info Distribution Sys.Contention 17/26 (I)(A) Not Limited to Brochure)