Clarification Regarding Request for Additional Information to 60-Day Response to NRC Bulletin 2002-01 Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity
ML023520168
Person / Time
Site: Farley, Vogtle  Southern Nuclear icon.png
Issue date: 12/10/2002
From: Beasley J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BL-02-001, LCV-1608-H, NEL-02-0244
Download: ML023520168 (2)


Text

J. Barnie Beasley, Jr., P.E.

Vice President Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992.7110 Fax 205 992 0403 SOUTHERN N~

COMPANY Energy to Serve Your World '

December 10, 2002 Docket Nos.:

50-348 50-424 50-364 50-425 NEL-02-0244 LCV-1608-H U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant and Vogtle Electric Generating Plant Clarification Regarding Request for Additional Information to 60-Day Response to NRC Bulletin 2002-01 "Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity" Ladies and Gentlemen:

The U. S. Nuclear Regulatory Commission (NRC) issued a Request for Additional Information (RAI) to the Southern Nuclear Operating Company (SNC) Vogtle Project on November 14, 2002 and to the SNC Farley Project on November 15, 2002 concerning their 60-day responses to NRC Bulletin 2002-01. SNC contacted the NRC staff by telephone and received a clarification that the required response time for each RAI is within 60 days of receipt of the NRC letter issuing the RAI rather than the 30 day response time stated in each RAI.

The RAIs were received by the SNC Vogtle Project on November 19, 2002 and the SNC Farley Project on November 26, 2002. Therefore, SNC commits to respond to these RAls no later than January 17, 2003 and January 24, 2003 respectively.

If there are any questions, please advise.

Respectfully submitted, DRG/sl: Clarification to Bulletin 2002-01 RAI.doc AD95

Page 2 U. S. Nuclear Regulatory Commission cc:

Southern Nuclear Operating Company Mr. D. E. Grissette, General Manager - Farley Mr. Jeffery T. Gasser, Vice President - Vogtle Mr. G. R. Frederick, General Manager - Vogtle U. S. Nuclear Regulatory Commission, Washington, D. C.

Mr. F. Rinaldi, Licensing Project Manager U. S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. T. P. Johnson, Senior Resident Inspector - Farley Mr. J. Zeiler, Senior Resident Inspector - Vogtle