Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24290A116 + (Change to South Texas Project Electric Generating Station (STPEGS) Emergency Plan)
- PLA-7605, Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A + (Change to Submittal Regarding License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-522-A)
- ML20011E608 + (Change to Svc List:Florida Power & Light Co.* Requests That Mailing Address on Svc List for Proceeding for Judge Eb Johnson Be Changed as Listed.Certificate of Svc Encl. Served on 900213)
- ML091610068 + (Change to TS 3.6.3, Containment Isolation Valves, Regarding Position Verification Requirements (TSTF-269-A, TSTF-45-A, and TSTF-440-A))
- ML111020298 + (Change to Technical Requirements Manual)
- ML041320455 + (Change to Technical Requirements Manual Unit 1, Rev 7)
- ML080710407 + (Change to Technical Specifications Bases Unit 2 Manual, Adding Table of Contents, Dated 02/28/2008)
- ML081770506 + (Change to Three-Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems)
- ML063100456 + (Change to Timing for Submittal of Information to ACRS Plant License Renewal Subcommittee Related to Amergens Application for Renewed Operating License for Oyster Creek Generating Station)
- ML022460352 + (Change to Vermont Yankee Recipients of NRC Correspondence)
- ML053410279 + (Change to Yankee Atomic Electric Company Organization)
- 05000382/FIN-2005004-03 + (Change to a Method of Evaluation Without Prior NRC Approval)
- WM 14-0011, Change to an Essential Service Water System Water Hammer Mitigation Commitment + (Change to an Essential Service Water System Water Hammer Mitigation Commitment)
- BVY 04-038, Change to the Emergency Plan, Revision 39 + (Change to the Emergency Plan, Revision 39)
- ML073540379 + (Change to the Inspection Plan 1/1/08 - 12/31/08)
- ML073540372 + (Change to the Inspection Plan 1/1/08 - 12/31/08)
- ML073540355 + (Change to the Inspection Plan 1/1/08 - 12/31/08)
- ML073540333 + (Change to the Inspection Plan 1/1/08 - 12/31/08)
- ML073540300 + (Change to the Inspection Plan 1/1/08 - 12/31/08)
- ML073540280 + (Change to the Inspection Plan 1/1/08 - 12/31/08)
- ML073540268 + (Change to the Inspection Plan 1/1/08 - 12/31/08)
- ML033220524 + (Change to the Quality Program Description)
- RS-11-017, Change to the Schedule for Providing Supplemental Information Related License Amendment Request for Adoption of Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume + (Change to the Schedule for Providing Supplemental Information Related License Amendment Request for Adoption of Technical Specifications Task Force Traveler TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume)
- ML12156A118 + (Change to the Schedule for the Site-Specific Environmental Impact Statement and Safety Evaluation Report)
- ML12086A167 + (Change to the Schedule for the Site-Specific Environmental Impact Statement Regarding Seabrook, Unit 1)
- ML19296B036 + (Changed Pages for Rept on Design Mods for Control Bldg, Revision 4)
- ML19331D714 + (Changed Pages to 800807 Tech Spec Change Request 93 Re Mgt Reorganization)
- ML20039E880 + (Changes & Corrections to NRC Testimony of Wc Seidle, Wa Crossman,Wg Hubacek,Rg Taylor & Hs Phillips Re History of Const Activity Leading Up to 800430 Show Cause Order)
- ML20235V216 + (Changes & Corrections to Susquehanna Valley Alliance/Three Mile Island Alert Documents Submitted on 890221.* Certificate of Svc Encl)
- ML20210U168 + (Changes 0 to 0 of PT/0/A/4150/11A, Control Rod Worth Measurement:Rod Swap)
- ML20077E720 + (Changes 0 to 1 to Procedure AP/1/A/5500/01, Reactor Trip)
- ML20077E732 + (Changes 0 to 13 to Procedure OP/1/A/6100/05, Unit Fast Recovery)
- ML20210T980 + (Changes 0 to 3 of PT/0/A/4150/11, Control Rod Worth Measurement)
- ML20210T949 + (Changes 0 to 31 of PT/0/A/4150/21, Post-Refueling Controlling Procedure for Criticality,Zero Power Physics & Power Escalation Testing)
- ML20210U020 + (Changes 0 to 5 of PT/0/A/4150/11A, Control Rod Worth Measurement:Rod Swap)
- ML20042G377 + (Changes 1-3 to Rev 0 to Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Plant,Units 1 & 2)
- ML20141A319 + (Changes Appointment of Washington State Patrol Official Designee to Receive Advance Notification of Transportation of Certain Shipments of Nuclear Waste & Sf from Mc King to Gr Otto)
- ML20044A362 + (Changes Assignment of Acrs/Acnw Responsibilities for Decommissioning Nuclear Plants & Interface in Areas of Mutual Interest/Concern)
- ML18057B364 + (Changes Commitment Re Insignificant Procedure Changes to Inservice Pump & Valve Test Program,Per Generic Ltr 89-04, Guidance on Developing Acceptable Inservice Testing Programs. Procedure Changes Will Be Completed by 911231)
- ML18064A730 + (Changes Commitment Re Internal Insps of Four LPSI Valves During 1995 Refueling Outage.Lpsi Valve Internals Insps Will Only Be Performed If Results of Scheduled Testing & Insps Indicate That Valve Internal Problem Exists)
- ML17299A409 + (Changes Commitment Re NUREG-0612, Control of Heavy Loads, W/Respect to Painted Lines on Top of Secondary Shield Walls. Exclusion Zone Will Be Designated as Area within Secondary Shield Walls.Walls Provide Identifiable Limit of Travel)
- B13662, Changes Commitment to Modify Tech Specs to Clarify Gtg Test Requirements/Acceptance Criteria of Section 4.9.A.2.a. Proposed Tech Spec Change Will Be Submitted by 901130 + (Changes Commitment to Modify Tech Specs to Clarify Gtg Test Requirements/Acceptance Criteria of Section 4.9.A.2.a. Proposed Tech Spec Change Will Be Submitted by 901130)
- ML20203H734 + (Changes Commitment to Revise Inservice Insp Program & Surveillance Instructions by 860725.Inservice Insp Program Changes Will Be Completed Before Restart of Either Unit)
- ML18059A407 + (Changes Commitment to Submit Status Repts Re safety-related Piping Reverification Project from Every Eight Months to Following Refueling Outages Until Planned Actions Completed. Second Status Rept Encl)
- ML17306A257 + (Changes Completion Date of Commitment to Install Shutdown Cooling Sys Low Flow Alarm on Control Panels in Control Rooms,Per Generic Ltr 88-17.Modified Design Will Be Installed During Next Refueling Outage for Unit 1)
- ML20086D978 + (Changes Completion Date to Upgrade Degraded Voltage Transient Analysis from 911231 to 921002,per Electrical Distribution Sys Function Insp.Offsite Power Portion of Analysis Underway & Will Be Completed by 911231)
- RIS 2000-01, Changes Concerning Foreign Ownership, Control, or Domination of Nuclear Reactor Licensees + (Changes Concerning Foreign Ownership, Control, or Domination of Nuclear Reactor Licensees)
- ML20084L195 + (Changes Corporate Contact & Address for NRC Correspondence)
- ML022260065 + (Changes Dated 07/16/2002)
- ML19221A436 + (Changes Designation of New Diesel Generator to Grey to Avoid Confusion W/Class 1E Blue Div)