. ) 6[T 2' 5

UNITED STATES 0F AMERICA

~

NUCLEAR REGULATORY C0HMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of HOUSTON LIGHTING AND POWER COMPANY, )

Docket Nos. 50-498 ET AL.

)

50-499 (South Texas Project, Units 1 & 2)

CHANGES AND CORRECTIONS TO "NRC STAFF TESTIMONY OF WILLIAM C. SEIDLE, WILLIAM A. CROSSMAN WILLIAM G. HUBACEK, ROBERT G. TAYLOR AND H. SHANN0N PHILLIPS, RELATIVE TO THE HISTORY OF CONSTRUCTION ACTIVITY LEADING UP TO THE SHOW CAUSE ORDER OF APRIL 30, 1980 1.

p. 2, fifth line from the top, there should.be a period between

" Commission" and "From".

2.

p. 2, thirteenth line from the top, the balance of the sentence following " Currently" should be deleted and "I am retired."

should be in its place.

3.

p. 2, tenth line from the bottom, " August 22, 1979" should be

" August 26, 1979".

4.

p. 6, seventh line from the top, delete the word "itself".

5.

p. 9 eighth and ninth lines from the bottom, delete the word

" construction" before " activities" and the word "at" following

" activities"; and add " relative to" after the word

" activities".

6.

p.10, fourth line from the top, " March" should be " December".

7.

p.11, top line, " records" should be changed to " procedures".

8.

p.13, second line from the top, "on" should be changed to "a".

9.

p.37, tenth line from the top, "condtion" should be changed to

" condition".

10. p.38, fifteenth line from the top, following "see I & E report 80-08." add " Marked for identification as Staff Exhibit 54".

l l

l

^

8201110578 820105 PDR ADOCK 05000498 T

PDR

3x 9

3 ts i

t' c,

1 s

11. p.52,' foirth line - froin the top, following "I & E Reports

. 81-06 and 81-09" add " marked for identification as 4:

Staff Exhibits 88 and 93, respectively".

IP.. 'p.54, third line from the top, af ter the word " reported", "to the i

NRC in accordance with 10 C.F.R. 50.54(e)" should be deleted.

13._p.15, fourth line from the bottom, " April" should be " August".

3 L

14.' The following additions should be made to Appendix A:

INSPECTION DATES INSPECTORS GENERAL AREA INSPECTED E

!81-10 3/30-J. I. Tapia Complex. Concrete Placement, 4/2/81 Show Cause Order Items 4/6-9/81 81-11 3/29-R. K. Herr Multiple Allegation on QA/QC 4

j ~

4/10/81 Peter Baci problems, concrete irregu-J. I. Tapia larities and conspiracy to 1

obstruct an NRC.investiga-tion.

p j-81-12 4/81

.H. S. Phillips Follow-up inspection s

81-13 3/81 K. V. Seyfrit Meeting report or ASME welding 81-14~

s 4/6-D. P. Thomlinson Follow up inspection 4

10/81 R. E. Hall i

81-15,

4/20-W. G. Hubacek.

Follow up inspection 24/81 W. A. Crossman 4

.\\

1 k

81-16 < Q 5/19-J. I. Tapia Follow up inspection

7 22/81 R. E. Hall Follow up inspection lq r

wx 6/3-11/81 81117 4/22/81 R. K. Herr Conspiracy to obstruct NRC L

l --

H. S. Phillips investigation t

,' O

'81-19 Y[

5)13' R. K.. Herr Intimidation and harrassment l'

; Jk V !

28/61' Peter Bacci

(

&v Multiple allegations concern-e i

4 8149 e i 5/19,

R. K. Herr l

'y 7/16/81 Peter Bacci ing Coatings department ~

[

Y "t

J. I. Tapia s,

\\

,r

'O.- P. Tomlinson sX t

.r

'n 81-20 ' i/

SI81 H.;S. Phillips Routine Resident m.

h, s Inspector's inspection z

~s I

t s

s

,w n :-:

~

  • y Ja

s INSPECTION DATES INSPECTORS GENERAL AREA INSPECTED 81-21 6/9-D. P. Tomlinson Follow up-inspection 11/81 Follow u 81-22 6/29-J. I. Tapia 50.55(e)p inspection or 7/2/81 R. E. Hall items 81-23 6/81 H. S. Phillips Routine Resident Inspector's inspection 81-24 7/14-R. K. Herr Allegations of falsified 15/81 J. I. Tapia painting records, uneven settlement of RCB #2.

81-25 7/21-W. G. Hubacek Follow up inspection 22/81 W. A. Crossman 9/15-17/81 81-26 7/27-D. P. Tomlinson Follow up inspection 31/81 M. J. Roberts 81-27 7/81 H. S. Phillips Previous inspection find-ings and routine inspection 81-28 7/29-R. K. Herr Alleged improper activicies i

8/26/81 H. S. Phillips by management 81-29 8/17-L. D. Gilbert Routine inspection of con-20/81 R. E. Hall struction activities, in-cluding welding.

81-30 8/81 H. S. Phillips Routine inspection of con-struction activities, including concrete and welding 81-31 9/8-D. P. Tomlinson Follow up inspection of vendor-11/81 supplied structrual steel 81-32 9/81 &

H. S. Phillips R a tine inspection of various 10/81 construction activities 81-33 10/6-R. K. Herr Investigation of improper 23/81 H. S. Phillips recording of equipment calibration.

81-34 10/19-J. I. Tapia Inspection of construction 23/81 D. P. Tomlinson activities, including 50.55(e) and concrete placement

s INSPECTION DATES INSPECTORS GENERAL AREA INSPECTED

.81-35 10/29-R. K. Herr Allegations of intimidation 11/10/81 and decreased emphasis on quality.

81-36 11/81-H. S. Phillips Routine Resident Inspector's 12/81 inspection i

i n

-